Search results

Jump to: navigation, search
  • ...(HEMT) low noise amplifiers (LNAs) for minimal power dissipation and best performance. To further minimize power consumption in the focal plane, the radiometers ...le the SCS is described in details in the [[LFI design, qualification, and performance#The Sorption Cooler|Sorption Cooler]] section.
    50 KB (7,843 words) - 15:28, 4 July 2018
  • ...tion for running science operations related to calibration and performance verification of the payload. Planning for commissioning operations was driven by the tel
    11 KB (1,616 words) - 12:31, 26 March 2014
  • ...s the flight data. Because of the granularity needed and the computational performance required to produce hundreds of realizations, the TOI processing pipeline a ...libration process due to the presence of simulated systematic effects. The calibration pipeline is algorithmically exactly the same as that used at the DPC for pr
    114 KB (17,146 words) - 09:49, 21 February 2022
  • about 2.6 ms−1 per year. Overall, the excellent performance science operations related to calibration and performance verification
    13 KB (2,044 words) - 09:08, 21 August 2013
  • instrument performance during the pass). Planck utilized the ...ocket injection, was executed on 15 May at 20:01:05 UT, with a slight over-performance of 0.9% and an error in direction of 1.3° (a touch-up manoeuvre was car
    21 KB (3,189 words) - 09:23, 10 July 2018
  • ...TI}, \text{DGI})</math> are look-up tables estimated during the LFI ground calibration campaign with: ...entific data has to take into account the [[LFI design, qualification, and performance#Radiometer Chain Assembly (RCA)|phase switch]] status and the processing ty
    15 KB (2,441 words) - 15:41, 4 July 2018
  • title = {Planck 2013 results: LFI Calibration (p02b)}, title = {Planck 2013 results: HFI calibration and Map-making (p03b)},
    173 KB (25,381 words) - 15:29, 4 June 2014
  • ...e functional tests of the instrument and its cooldown to 100 mK. Given the performance, the helium flow was set to the minimal one giving an End Of Life estimatio ...esponsibility of ESA's Planck Science Office. The main HFI operations were performance tests and activities to measure the effects of several systematics. The onl
    2 KB (308 words) - 09:43, 3 February 2015
  • ...llowing parameters of the Readout Unit can be set to optimize the detector performance: detection chains, and were optimized during the calibration
    15 KB (2,424 words) - 21:36, 19 June 2018
  • * '''CPV''' : Calibration and Performance Verification * '''SPPT''' : Survey Performance and Planning Tool
    7 KB (738 words) - 22:33, 1 July 2018
  • ...ere already briefly described in the main [[LFI design, qualification, and performance|LFI instrument]] page. ...concluded. The agreement between the pattern measurements and the expected performance (simulated using the nominal corrugation profile) was excellent, both in am
    60 KB (9,314 words) - 08:48, 2 January 2015
  • ...MB, with an accuracy set by fundamental astrophysical limits. Its level of performance enabled Planck to extract essentially all the information in the CMB temper After a period dedicated to Commissioning and Performance Verification, Planck started its planned survey observations on 12 August 2009.
    15 KB (2,330 words) - 12:43, 17 July 2018
  • ...llowing parameters of the Readout Unit can be set to optimize the detector performance: detection chains, and were optimized during the calibration
    13 KB (2,128 words) - 15:29, 4 June 2014
  • ...For a set of detectors, the relative calibration is the difference in the calibration between detector pairs. The latter can be measured very accurately from th ...ngle number, while the relative calibration refers to the component of the calibration that varies pointing period by pointing period.
    10 KB (1,542 words) - 09:41, 2 February 2018