HFI operations timeline
The following list gives some notable events and activities that are known to have affected or might have affected the HFI data. The time information is the start time of the event in On Board Time. The label contains some keywords:
- dtcp, (for Daily Tele-Communication Period) refers to an extended pass;
- HFI, refers to HFI instrument operations (when this is during the commissioning of the CPV phases, labels are usually followed by the activity label);
- period, refers to the different phases of the mission;
- sat, refers to operations on the satellite SerVice Module that might have an impact on the HFI data;
- slew, refers to thruster activity;
- solar flare, refers to all solar events as detected by a thermal fluctuation on the HFI bolometer plate;
- test, refers to End Of Life tests executed on the HFI;
- therm, refers to satellite events that might have a thermal impact on the HFI.
14/05/2009 13:12:00 EPC Vulcain Engine ignition 14/05/2009 16:58:36 HFI: LCLs nominal switch on 14/05/2009 17:30:59 HFI: go from startup to standby 14/05/2009 17:36:08 HFI: choose DPU FDIR mode Desynchro 14/05/2009 17:39:39 HFI: open dilution cooler valves 14/05/2009 18:48:52 HFI: setup REU Ns (40 Hz) and Fdiv (124) parameters 14/05/2009 18:52:33 HFI: set 4-K cooler internal frequency at 40Hz 14/05/2009 19:05:45 HFI: activate the 6 nominal cernox thermometers 14/05/2009 19:08:51 HFI: synchronise the 4-K cooler clock (External) 14/05/2009 19:23:47 HFI: set the 4-K cooler amplitude demand at 2000 microns 14/05/2009 19:28:42 HFI: power on the nominal 4-K getter heater 14/05/2009 19:35:31 HFI: start the 4-K cooler compressors 15/05/2009 12:00:00 therm: stop the Focal Plane Unit 250K heating 15/05/2009 19:17:06 slew: OCM LEOP (MAN-01a) 16/05/2009 12:06:55 HFI: switch on all REU analog belts 16/05/2009 12:17:23 HFI: REU FPGA reset 16/05/2009 12:26:40 HFI: start the 4-K cooler compressors 16/05/2009 12:31:16 HFI: set the JFET PID heaters at 110K 16/05/2009 12:49:26 HFI: set the channel compression parameters 16/05/2009 12:54:37 HFI: raw signal cycle on channels 16/05/2009 14:20:15 HFI: science data production starts 16/05/2009 14:48:30 HFI: channel setup [all channels] 16/05/2009 15:41:23 HFI: VI measurement [bolos, thermos, resistor] 16/05/2009 16:00:00 HFI: test end of slew 16/05/2009 17:51:43 HFI: set Cernox thermistor [4K-1.6K switch, 4K, 1.6K at 100K-200K] 17/05/2009 12:28:32 HFI: set Cernox thermistor [0.1-K nominal at 100K-200K] 18/05/2009 00:00:00 period: end of LEOP / start of Commissioning phase 01/06/2009 21:36:00 therm: end of reflectors anticontamination 02/06/2009 16:40:20 HFI: set the JFET PID heaters at 130K 02/06/2009 17:00:06 HFI: REU hardware test 02/06/2009 17:20:06 HFI: start the 4-K cooler compressors 02/06/2009 17:39:56 HFI: save REU configuration in EEPROM 03/06/2009 17:24:00 therm: SCS active cooldown starts 05/06/2009 17:28:18 slew: OCM-z (MAN-02a) 06/06/2009 18:19:21 HFI: set Cernox thermistor [4K-1.6K switch, 4K, 1.6K at 40K-100K] 09/06/2009 16:29:33 HFI: activate the 18K-4K heat switch nominal (repeated every day till 24/06) 09/06/2009 22:28:02 HFI: Single Event Upset 11/06/2009 21:15:00 HFI: set Cernox thermistor [0.1-K nominal at 40K-100K] 12/06/2009 03:00:00 HFI: QEC1 at 100K 12/06/2009 05:08:20 HFI: QEC1 at 100K [end] 12/06/2009 15:26:07 HFI: set Cernox thermistor [4K-1.6K switch, 4K, 1.6K at 19K-40K] 12/06/2009 15:32:10 HFI: PID setup [4K-1.6K switch PID activated at max power] 12/06/2009 15:33:31 HFI: PID setup [4-K PID nominal at max power] 15/06/2009 03:00:00 HFI: LFER_A_test 15/06/2009 04:54:52 HFI: LFER_A_test [end] 17/06/2009 16:46:58 slew: OCM-z touch-up (MAN-02b) 18/06/2009 18:29:57 HFI: LFER_A 19/06/2009 13:12:53 HFI: LFER_A [end] 22/06/2009 10:11:08 HFI: set Cernox thermistor [0.1-K nominal at 19K-40K] 23/06/2009 11:00:34 HFI: set Cernox thermistor [4K-1.6K switch, 4K, 1.6K at 9K-19K] 24/06/2009 10:40:15 HFI: PID setup [4K-1.6K switch PID deactivated] 24/06/2009 10:40:35 HFI: PID setup [4-K PID nominal] 24/06/2009 10:44:36 HFI: activate the 18K-4K heat switch nominal for LFI test [1st attempt] 24/06/2009 10:49:01 HFI: set the 4-K cooler amplitude demand at 3500 microns 24/06/2009 10:52:48 HFI: set the dilution cooler flow to FNOM2 24/06/2009 11:18:58 HFI: activate the 18K-4K heat switch nominal for LFI test [5th and last attempt] 26/06/2009 23:00:00 HFI: deactivate the 18K-4K heat switch nominal 27/06/2009 13:34:34 HFI: set Cernox thermistor [0.1K, 1.6K, 4K and 4K-1.6K switch at <9K] 28/06/2009 12:22:14 HFI: channel setup [R & C] 28/06/2009 12:53:22 HFI: 4-K cooler amplitude tuning 1/2 29/06/2009 09:38:15 HFI: 4-K cooler amplitude tuning 2/2 29/06/2009 11:58:41 HFI: channel setup [all 1.6-K thermometers] 29/06/2009 12:08:27 HFI: VI measurement [1.6-K thermometers] 29/06/2009 12:21:10 HFI: set the channel compression parameters [4-K thermometers] 29/06/2009 12:29:51 HFI: channel setup [all 4-K thermometers] 29/06/2009 12:38:30 HFI: VI measurement [4-K thermometers] 29/06/2009 13:28:40 HFI: channel setup [4-K PID nominal thermometer] 29/06/2009 13:31:24 HFI: PID setup [4-K PID nominal] 29/06/2009 13:41:00 HFI: channel setup [4-K PID nominal thermometer] 29/06/2009 14:56:15 HFI: channel setup [1.6-K PID nominal thermometer] 29/06/2009 14:58:58 HFI: PID setup [1.6-K PID nominal] 29/06/2009 15:07:42 HFI: set Cernox thermistor [0.1-K nominal at 3.5K-9K] 29/06/2009 15:45:02 HFI: PID setup [4-K PID nominal] (8 times hourly) 29/06/2009 21:59:57 HFI: LFER-B 30/06/2009 04:16:13 HFI: LFER-B [end] 30/06/2009 09:35:52 HFI: set Cernox thermistor [0.1-K nominal at 2.2K-3.5K] 30/06/2009 10:41:53 HFI: channel setup [1.6-K PID nominal thermometer] 30/06/2009 10:43:58 HFI: PID setup [1.6-K PID nominal] 30/06/2009 10:57:31 HFI: channel setup [0.1-K thermometers] 30/06/2009 12:35:07 HFI: set Cernox thermistor [0.1-K nominal at 1.4K-2.2K] 30/06/2009 13:42:12 HFI: PID setup [1.6-K PID nominal] 30/06/2009 14:20:51 HFI: VI measurement [] 30/06/2009 18:09:59 HFI: set Cernox thermistor [0.1-K nominal at <1.4 K] 30/06/2009 18:20:51 HFI: VI measurement [] 30/06/2009 19:10:01 HFI: QEC2 at 1K 30/06/2009 21:18:31 HFI: QEC2 at 1K [end] 01/07/2009 00:20:51 HFI: VI measurement 01/07/2009 04:20:51 HFI: VI measurement 01/07/2009 12:10:01 HFI: QEC3 at 300mK 01/07/2009 14:18:21 HFI: QEC3 at 300mK [end] 01/07/2009 14:18:31 HFI: channel setup [bolometers at 200mk] 01/07/2009 15:20:51 HFI: VI measurement [] 01/07/2009 19:20:51 HFI: VI measurement [] 01/07/2009 23:20:51 HFI: VI measurement [] 02/07/2009 04:20:51 HFI: VI measurement [] 02/07/2009 08:20:51 HFI: VI measurement [] 02/07/2009 09:24:41 HFI: channel setup [0.1-K thermometers] 02/07/2009 10:35:26 HFI: channel setup [1.6-K PID nominal thermometer] 02/07/2009 10:36:58 HFI: PID setup [1.6-K PID nominal] 02/07/2009 11:15:46 slew: OCM Insertion (MAN-03a) 02/07/2009 12:34:36 HFI: set the dilution cooler flow to FNOM1 02/07/2009 13:58:16 HFI: set the channel compression parameters 03/07/2009 09:37:20 HFI: VI measurement [100-mK bolometers] 03/07/2009 10:10:01 HFI: channel setup [bolometers at 100mk] 03/07/2009 10:17:56 HFI: set the dilution cooler flow to FMIN2 03/07/2009 12:50:00 HFI: PID setup [bolo PID activated] 03/07/2009 13:09:45 HFI: channel setup [thermo PID1R] 03/07/2009 13:10:58 HFI: PID setup [dilu PID activated] 03/07/2009 13:26:04 HFI: channel setup [1.6-K PID nominal thermometer to 1.39 K] 03/07/2009 13:52:29 HFI: channel setup [1.6-K PID nominal thermometer to 1.41 K] 03/07/2009 14:03:43 HFI: set the channel compression parameters 03/07/2009 16:15:01 HFI: QEC4 at 100mK 03/07/2009 18:23:21 HFI: QEC4 at 100mK [end] 03/07/2009 19:05:51 HFI: VI measurement [] 03/07/2009 20:05:26 HFI: PID setup [1.6-K PID nominal] 03/07/2009 22:00:02 HFI: pre-RAW72 03/07/2009 23:13:08 HFI: pre-RAW72 [end] 04/07/2009 02:00:00 therm: aphelion 04/07/2009 09:43:13 HFI: channel setup [1.6-K PID nominal thermometer to 1.39 K] 04/07/2009 09:45:27 HFI: PID setup [1.6-K PID nominal] 04/07/2009 20:26:32 HFI: channel setup [1.6-K PID nominal thermometer] 04/07/2009 22:30:01 HFI: CPVA_01 05/07/2009 01:55:49 HFI: CPVA_01 [end] 05/07/2009 10:47:08 HFI: channel setup [1.6-K PID nominal thermometer to 1.35 K] 05/07/2009 11:28:57 HFI: channel setup [1.6-K PID nominal thermometer to 1.34 K] 05/07/2009 13:25:03 HFI: IBTU_01 06/07/2009 09:47:49 HFI: IBTU_01 [end] 06/07/2009 09:58:51 HFI: channel setup [1.6-K PID nominal thermometer to 1.33 K] 06/07/2009 12:38:33 HFI: channel setup [1.6-K PID nominal thermometer to 1.35 K] 06/07/2009 13:15:21 HFI: channel setup [100-mK PID redundant to 98.5 mK] 07/07/2009 11:30:14 HFI: VI measurement [resistor, bolometers] 07/07/2009 13:24:37 HFI: set the channel compression parameters 07/07/2009 14:20:03 HFI: IBTU_02 08/07/2009 10:42:49 HFI: IBTU_02 [end] 08/07/2009 11:04:39 HFI: channel setup [1.6-K PID nominal thermometer to 1.39 K] 08/07/2009 11:16:02 HFI: PID setup [1.6-K PID redundant at 200 microW] 08/07/2009 11:24:40 HFI: channel setup [100-mK PID redundant to 100.0 mK] 08/07/2009 23:00:01 HFI: LFER-B 09/07/2009 17:39:59 HFI: LFER-B [end] 09/07/2009 19:30:01 HFI: IBTU_03 10/07/2009 00:00:00 Start of CPV phase 10/07/2009 15:08:03 HFI: IBTU_03 [end] 10/07/2009 16:00:01 HFI: PHTU_01 11/07/2009 00:01:47 HFI: PHTU_01 [end] 11/07/2009 10:24:00 HFI: channel setup [4-K PID nominal thermometer at 4.73 K] 11/07/2009 10:26:00 HFI: PID setup [deactivation of 4-K PID redundant] 11/07/2009 10:50:16 HFI: 4KFT (bis) 11/07/2009 12:49:50 HFI: 4KFT (bis) [end] 11/07/2009 12:59:35 HFI: channel setup [1.6-K PID nominal thermometer to 1.37 K] 11/07/2009 13:05:25 HFI: PID setup [1.6-K PID redundant deactivated] 11/07/2009 14:10:01 HFI: XTLK_01 12/07/2009 00:34:38 HFI: Single Event Upset 12/07/2009 00:42:05 HFI: XTLK_01 [end] 12/07/2009 01:00:02 HFI: RAW72_02 12/07/2009 07:00:10 HFI: RAW72_02 [end] 12/07/2009 11:53:22 HFI: DPU soft reboot 12/07/2009 12:18:13 HFI: back to nominal 12/07/2009 13:02:33 HFI: channel setup [capacitor] 12/07/2009 13:22:13 HFI: set the channel compression parameters 12/07/2009 13:31:21 HFI: 01TO_01 13/07/2009 01:30:01 HFI: 01TO_01 [end] 13/07/2009 11:12:32 HFI: channel setup [4-K PID nominal thermometer at 4.80 K] 13/07/2009 13:03:50 HFI: channel setup [4-K PID nominal thermometer at 4.66 K] 13/07/2009 13:26:23 HFI: channel setup [4-K PID nominal thermometer at 4.64 K] 14/07/2009 09:50:15 HFI: PID setup [1.6-K PID redundant to 200 microW] 14/07/2009 13:12:01 HFI: PID setup [1.6-K PID redundant to 260 microW] 14/07/2009 13:14:22 HFI: channel setup [1.6-K PID nominal thermometer to 1.38 K] 15/07/2009 09:16:02 slew: OCM Insertion touch-up (MAN-03b) 15/07/2009 09:46:54 HFI: channel setup [4-K PID nominal thermometer at 4.66 K] 16/07/2009 09:21:29 HFI: PID setup [4-K PID redundant to 0.8 mW] 16/07/2009 09:23:30 HFI: channel setup [4-K PID nominal thermometer at 4.68 K] 17/07/2009 09:26:56 HFI: PID setup [4-K PID redundant to 1.2 mW] 17/07/2009 09:30:08 HFI: channel setup [4-K PID nominal thermometer at 4.70 K] 17/07/2009 11:12:09 HFI: channel setup [1.6-K PID nominal thermometer to 1.39 K] 17/07/2009 11:23:02 HFI: channel setup [thermometers] 17/07/2009 14:00:01 HFI: LFER_02 18/07/2009 08:40:59 HFI: LFER_02 [end] 18/07/2009 09:51:16 HFI: channel setup [1.6-K PID nominal thermometer to 1.40 K] 18/07/2009 19:10:19 therm: elephant 19/07/2009 11:09:09 HFI: channel setup [100-mK PID redundant to 100.5 mK] 20/07/2009 10:59:16 HFI: PID setup [1.6-K PID redundant deactivated] 20/07/2009 12:53:40 HFI: channel setup [1.6-K PID nominal thermometer to 1.37 K] 21/07/2009 10:05:59 HFI: channel setup [4-K PID nominal thermometer at 4.72 K] 21/07/2009 13:02:01 HFI: channel setup [bolo PID at 102.3 mK] 21/07/2009 13:11:48 HFI: PID setup [bolo PID] 22/07/2009 10:21:20 HFI: channel setup [1.6-K PID nominal thermometer to 1.38 K] 22/07/2009 10:26:49 HFI: PID setup [bolo PID] 23/07/2009 09:23:42 HFI: decrease the 4-K cooler amplitude demand to 3450 microns 23/07/2009 09:47:32 HFI: PID setup [4-K PID redundant at max power] 23/07/2009 09:54:04 HFI: channel setup [4-K PID nominal thermometer at 4.77 K] 23/07/2009 10:53:39 HFI: channel setup [4-K PID nominal thermometer at 4.80 K] 24/07/2009 10:44:08 HFI: PID setup [bolo PID] 24/07/2009 22:30:00 HFI: 4KTO 25/07/2009 08:30:00 HFI: 4KTO [end] 27/07/2009 01:56:42 HFI: Single Event Upset 27/07/2009 09:21:28 HFI: PID setup [4-K PID redundant to 0,84 mW] 27/07/2009 09:27:54 HFI: 4K memory HCT dump 27/07/2009 09:56:06 HFI: channel setup [bolo PID at 103.0 mK] 27/07/2009 13:01:32 HFI: set the channel compression parameters (increase of the HFI telemetry rate) 28/07/2009 09:31:34 HFI: channel setup [nominal bolo PID] 28/07/2009 09:38:16 HFI: channel setup [100-mK PID redundant to 101.0 mK] 28/07/2009 12:30:34 HFI: channel setup [nominal bolo PID] 28/07/2009 12:46:13 HFI: channel setup [nominal bolo PID] 31/07/2009 16:00:00 HFI: SUNI_1_1 01/08/2009 00:00:00 HFI: SUNI_1_2 01/08/2009 10:55:00 HFI: SPIN day 1 : RPM@1.05 02/08/2009 12:20:00 HFI: SPIN day 2 : RPM@0.95 03/08/2009 11:53:37 HFI: SPIN day 3 : RPM@1.00 03/08/2009 11:53:37 HFI: SPIN day 4 : RPM@1.00 05/08/2009 09:36:01 slew: 1.7' slews test 06/08/2009 10:00:00 HFI: SUNI_2_1 06/08/2009 17:31:31 HFI: 4-K Charge Regulator Unit anomalous shutdown 06/08/2009 18:00:00 HFI: SUNI_2_2 07/08/2009 12:20:01 HFI: set Cernox thermistor [4K-1.6K switch, 4K, 1.6K] 07/08/2009 13:40:43 HFI: 4-K CDE software reset 07/08/2009 13:45:43 HFI: activate the 4-K VCS 07/08/2009 13:46:23 HFI: select the harmonic forces 07/08/2009 13:47:56 HFI: set the 4-K cooler amplitude demand at 2000 microns 07/08/2009 13:49:28 HFI: start the 4-K cooler compressors 07/08/2009 13:53:23 HFI: set the 4-K cooler amplitude demand at 2500 microns 07/08/2009 13:55:16 HFI: set the 4-K cooler amplitude demand at 3000 microns 07/08/2009 13:58:50 HFI: 4-K getter on 07/08/2009 17:54:56 HFI: stop the 4-K cooler compressors 07/08/2009 17:57:22 HFI: deactivate the 4-K VCS 07/08/2009 17:58:17 HFI: set the 4-K cooler amplitude demand at 3500 microns 07/08/2009 17:59:41 HFI: start the 4-K cooler compressors 07/08/2009 18:41:27 HFI: PID setup [4-K PID redundant] 08/08/2009 10:05:25 HFI: stop the 4-K cooler compressors 08/08/2009 10:07:41 HFI: activate the 4-K VCS 08/08/2009 10:08:09 HFI: select the harmonic forces 08/08/2009 10:08:52 HFI: set the 4-K cooler amplitude demand at 3450 microns 08/08/2009 10:10:26 HFI: start the 4-K cooler compressors 08/08/2009 10:48:56 HFI: set Cernox thermistor [4K-1.6K switch, 4K, 1.6K] 08/08/2009 11:48:33 HFI: PID setup [dilu PID activated] 08/08/2009 11:55:25 HFI: PID setup [4-K PID redundant to 0,84 mW] 08/08/2009 14:05:36 period: first light survey 09/08/2009 03:58:53 star tracker switchover #1 11/08/2009 09:44:16 HFI: channel setup [100-mK thermometers] 12/08/2009 10:24:46 HFI: channel setup [100-mK PID redundant] 12/08/2009 10:29:52 HFI: PID setup [dilu PID] 12/08/2009 14:13:45 <span style="background:#00FF00">period: DPC survey#1 (ring#240)</span> 14/08/2009 12:30:10 slew: orbit maintenance manoeuvre #1 18/08/2009 11:43:42 long ring #440 for CDMU patch day 1 18/08/2009 12:39:09 sat: CDMU patch (day 1) 18/08/2009 12:39:20 sat: CDMU patch (end of day 1) 19/08/2009 11:49:40 long ring #474 for CDMU patch day 2 19/08/2009 12:45:31 sat: CDMU patch (day 2) 19/08/2009 12:45:34 sat: CDMU patch (end of day 2) 20/08/2009 11:53:46 long ring #509 for CDMU patch day 3 20/08/2009 12:45:32 sat: CDMU patch (day 3) 20/08/2009 12:45:36 sat: CDMU patch (end of day 3) 21/08/2009 11:56:03 long ring #544 for CDMU patch 21/08/2009 14:18:48 HFI: clock resynchronisation 22/08/2009 09:36:51 dtcp: transition to 3 h DTCP duration 31/08/2009 12:09:14 long ring #897 to allow the execution of the ACMS warm reset 31/08/2009 13:40:00 thrusters catbed heaters switched off by error 31/08/2009 13:40:01 sat: FOG telemetry disabled by error 31/08/2009 13:41:05 long ring #898 to allow the execution of the ACMS warm reset 04/09/2009 15:01:00 thruster under/over performed 11/09/2009 21:00:41 slew: orbit maintenance manoeuvre #2 16/09/2009 20:31:41 thrusters catbed heaters switched back on 18/09/2009 19:06:15 planet: HFI Crab scan#1 20/09/2009 19:36:00 dtcp: extra pass CEB 20/10/2009 23:44:24 therm: HFI elephant LONG deltaT>10uK 22/10/2009 19:34:56 planet: HFI Mars scan#1 24/10/2009 11:01:39 therm: HFI elephant LONG deltaT>10uK 25/10/2009 15:30:49 planet: HFI Jupiter scan#1 28/10/2009 23:06:00 thruster under/over performed 01/11/2009 00:41:04 planet: HFI Neptune scan# 1 20/11/2009 18:52:25 long ring #3589 (29 hours) : no slew due to MTL uplink problem 21/11/2009 23:39:54 slew : resumption of SL after the MTL problem 22/11/2009 19:48:41 slew to SGR position 23/11/2009 08:47:54 slew to catchup 23/11/2009 19:48:10 SGR (end): back to nominal scanning law 25/11/2009 05:56:00 HFI: 1.6-K stage event 26/11/2009 14:32:00 thruster under/over performed 04/12/2009 17:49:29 slew: orbit maintenance manoeuvre #3 05/12/2009 09:43:53 planet: HFI Uranus scan# 1 16/12/2009 20:42:11 sat: FOG telemetry enabled back 21/12/2009 19:59:54 HFI: set the channel compression parameters 22/12/2009 11:46:18 dtcp: extra pass 03/01/2010 00:00:00 therm: perihelia 04/01/2010 00:25:49 planet: HFI Saturn scan#1 11/01/2010 19:16:32 star tracker switchover #2 15/01/2010 21:57:45 slew: orbit maintenance manoeuvre #4 25/01/2010 21:16:41 sat: transponder always on 08/02/2010 20:51:32 <span style="background:#00FF00">period: DPC survey#2 (ring#5721)</span> 26/02/2010 12:43:37 star tracker switchover #3 26/02/2010 23:02:49 slew: orbit maintenance manoeuvre #5 06/03/2010 05:04:43 planet: HFI Crab scan#2 01/04/2010 06:41:00 thruster under/over performed 02/04/2010 13:48:21 therm: major elephant 05/04/2010 10:00:00 solar flare: geomagnetic storm 10/04/2010 10:36:35 planet: HFI Mars scan#2 26/04/2010 17:55:37 slew: orbit maintenance manoeuvre #6 29/04/2010 17:34:58 therm: SCS TSA setpoint increase 06/05/2010 17:02:08 therm: SCS TSA setpoint increase 13/05/2010 16:30:13 therm: SCS TSA setpoint increase 17/05/2010 17:51:09 planet: HFI Neptune scan# 2 12/06/2010 01:00:00 solar flare 12/06/2010 01:57:16 planet: HFI Saturn scan#2 24/06/2010 18:31:09 therm: SCS TSA setpoint increase 30/06/2010 19:00:53 planet: HFI Uranus scan#2 03/07/2010 20:01:43 planet: HFI Jupiter scan#2 06/07/2010 11:00:00 therm: aphelion 14/07/2010 20:45:50 dtcp: extra pass 15/07/2010 18:13:43 therm: SCS TSA setpoint increase 18/07/2010 04:28:00 thruster under/over performed 21/07/2010 21:08:44 therm: moon transit 22/07/2010 00:42:59 therm: moon transit (end) 24/07/2010 16:36:11 therm: HFI elephant LONG deltaT>10uK 29/07/2010 17:45:52 therm: SCS TSA setpoint increase 03/08/2010 19:00:00 solar flare: possible geomagnetic storm 11/08/2010 10:14:37 long ring #11149 for SCS switchover 11/08/2010 11:00:00 therm: SCS switchover 11/08/2010 11:00:30 HFI: PID setup [1.6-K PID nominal and 4-K PIDs deactivated] 11/08/2010 17:17:50 HFI: deselect all 4-K harmonics for VCS 11/08/2010 18:50:15 HFI: select all 4-K harmonics for VCS 11/08/2010 18:52:44 HFI: PID setup [1.6-K PID nominal and 4-K PIDs reactivated] 11/08/2010 21:34:10 dtcp: extra pass CEB 12/08/2010 00:06:59 HFI: PID setup [4-K PID redundant set to 1.14 mW] 12/08/2010 19:27:28 <span style="background:#00FF00">period: DPC survey#3 (ring#11195)</span> 13/08/2010 23:59:21 slew to interleaved pointings for survey#3 14/08/2010 11:00:00 solar flare 16/08/2010 18:00:09 slew: orbit maintenance manoeuvre #7 18/08/2010 08:35:00 solar flare 25/08/2010 17:51:58 HFI: 4-K memory HCT dump 18/09/2010 18:28:04 planet: HFI Crab scan#3 04/10/2010 04:25:00 HFI: 1.6-K stage event 04/10/2010 04:57:05 therm: HFI elephant SHORT deltaT>10uK 06/10/2010 19:00:46 dtcp: extra pass CEB 11/10/2010 13:26:47 long ring #13333: manoeuvre failed 03/11/2010 08:11:34 planet: HFI Neptune scan#3 04/11/2010 13:20:14 therm: change of the DPU2 thermal control 04/11/2010 19:19:00 dtcp: extra pass NNO 11/11/2010 12:45:00 therm: SCS TSA setpoint increase 21/11/2010 03:02:51 therm: HFI elephant LONG deltaT>10uK 24/11/2010 11:23:01 long ring #14627 for star tracker tests 24/11/2010 12:29:29 star tracker switchover for intercalibration test (STR1->STR2) 24/11/2010 20:23:53 slew back 25/11/2010 17:02:45 long ring #14653 for star tracker tests 25/11/2010 17:59:37 star tracker switchover STR2->STR1 26/11/2010 01:55:21 slew back to nominal scanning strategy 27/11/2010 20:20:00 solar flare 02/12/2010 13:21:13 slew: orbit maintenance manoeuvre #8 06/12/2010 20:38:00 planet: HFI Jupiter scan#3 10/12/2010 14:55:44 planet: HFI Uranus scan#3 15/12/2010 08:19:00 thruster under/over performed 15/12/2010 10:30:00 thruster under/over performed 22/12/2010 16:33:14 HFI: Single Event Upset 23/12/2010 15:44:53 therm: SCS TSA setpoint increase 03/01/2011 19:00:00 therm: perihelia 18/01/2011 05:25:24 planet: HFI Saturn scan#3 24/01/2011 13:20:09 therm: SCS warm radiator warming 24/01/2011 17:28:00 dtcp: extra pass CEB 28/01/2011 02:00:00 solar flare 31/01/2011 14:06:49 slew: orbit maintenance manoeuvre #9 01/02/2011 13:31:33 therm: SCS TSA setpoint increase 08/02/2011 20:55:48 <span style="background:#00FF00">period: DPC survey#4 (ring#16692)</span> 10/02/2011 02:48:02 HFI: 1.6-K stage event 15/02/2011 06:00:00 solar flare: X ray solar flare 18/02/2011 00:00:00 solar flare: X ray solar flare 24/02/2011 14:05:28 therm: SCS TSA setpoint increase 28/02/2011 23:20:41 slew: acceleration for Crab scan 06/03/2011 04:12:44 planet: HFI Crab scan#4 07/03/2011 21:00:00 solar flare: coronal mass ejection 10/03/2011 19:44:00 dtcp: extra pass CEB 15/03/2011 17:42:31 therm: SCS desorption power gap jump 15/03/2011 20:35:00 dtcp: extra pass 18/03/2011 15:15:00 dtcp: long pass (5h30mn) 21/03/2011 03:30:00 solar flare: radiation event 21/03/2011 21:10:17 slew: orbit maintenance manoeuvre #10 31/03/2011 21:02:52 therm: SCS TSA setpoint increase 07/04/2011 20:38:16 therm: SCS TSA setpoint increase 14/04/2011 21:03:33 therm: SCS TSA setpoint increase 21/04/2011 20:33:20 therm: SCS TSA setpoint increase 10/05/2011 16:48:13 therm: SCS TSA setpoint increase 20/05/2011 14:18:21 planet: HFI Neptune scan#4 04/06/2011 22:00:00 solar flare: geomagnetic storm 07/06/2011 07:00:00 solar flare: solar proton enhancement 23/06/2011 04:55:03 thruster under/over performed 29/06/2011 17:03:39 planet: HFI Saturn scan#4 04/07/2011 15:00:00 therm: aphelion 05/07/2011 22:00:17 planet: HFI Uranus scan#4 25/07/2011 17:38:00 slew: orbit maintenance manoeuvre #11 27/07/2011 16:51:00 on board mass properties update 29/07/2011 17:13:00 slew to survey#5 29/07/2011 17:43:32 <span style="background:#00FF00">period: DPC survey#5 (ring#21721)</span> 02/08/2011 07:00:00 solar flare: M1 class 03/08/2011 21:09:40 planet: HFI Jupiter scan#4 04/08/2011 04:30:00 solar flare 04/08/2011 15:55:38 therm: SCS TSA setpoint increase 08/08/2011 16:53:00 SGR: scanning law interrupted 08/08/2011 17:32:00 slew back 08/08/2011 18:00:00 solar flare: X7 class 08/08/2011 18:44:00 planet: HFI Jupiter scan#4 (bis) 09/08/2011 01:54:00 slew to the catchup position 09/08/2011 08:00:00 solar flare 09/08/2011 17:23:00 SGR (end): back to nominal scanning law 06/09/2011 02:20:00 solar flare: M5.3 06/09/2011 23:00:00 solar flare: X2.1 13/09/2011 09:34:22 planet: HFI Crab scan#5 17/09/2011 08:00:00 solar flare: magnetic storm 20/09/2011 09:43:00 slew setting-up the second crab scan 20/09/2011 10:41:38 planet: HFI Crab scan#5 (bis) 21/09/2011 16:43:41 planet: HFI Crab scan#6 21/09/2011 18:33:00 dtcp: extra pass 22/09/2011 12:00:00 solar flare: complexe event 24/09/2011 00:42:34 slew back to survey 5 scanning strategy 26/09/2011 12:29:45 slew : station keeping manoeuvre half failed 04/10/2011 12:35:07 slew: orbit maintenance manoeuvre #12 bis 11/10/2011 12:35:13 HFI: temperature steps on bolometer PID 12/10/2011 10:30:00 HFI: EOL-Fast VI at 100mK 22/10/2011 14:00:00 solar flare: small event 27/10/2011 12:38:38 therm: SCS TSA setpoint increase 04/11/2011 00:00:00 solar flare: X2 class 07/11/2011 09:00:00 HFI : pre-EOL-LFER-1 07/11/2011 11:06:54 HFI : pre-EOL-LFER-1 [end] 08/11/2011 10:42:00 HFI: EOL-IBTU 08/11/2011 16:10:03 HFI: EOL-IBTU [end] 14/11/2011 09:00:00 HFI: 2nd pre-EOL-LFER-1 14/11/2011 11:08:42 HFI: 2nd pre-EOL-LFER-1 [end] 14/11/2011 23:58:33 slew: beginning of dwell duration compression phase 18/11/2011 00:00:00 HFI: EOL-LFER-1 20/11/2011 14:33:42 HFI: EOL-LFER-1 [end] 26/11/2011 07:00:00 solar flare: Radiation storm and Coronal Mass Ejection 28/11/2011 17:10:00 dtcp: extra pass 07/12/2011 17:00:00 spinup test at 1.4RPM 08/12/2011 10:00:00 planet: HFI Mars scan @ 1.4 RPM 09/12/2011 16:43:00 star tracker unhealthy 16/12/2011 18:35:00 slew: back to scanning law 17/12/2011 18:00:00 planet: HFI Mars scan#3 23/12/2011 15:10:06 HFI: He3 flow rate 0 -> 1 25/12/2011 14:45:16 HFI: HFI: PID setup [1.6-K PID redundant add 153.4 uW] 25/12/2011 20:00:00 solar flare: C-class 27/12/2011 11:42:10 HFI: temperature steps on the bolometer plate II 27/12/2011 13:48:45 HFI: temperature steps on the bolometer plate II [end] 29/12/2011 14:24:29 HFI: He3 flow rate 1 -> 2 02/01/2012 13:58:00 HFI: He3 flow rate 2 -> 3 03/01/2012 14:20:19 HFI: temperature steps on bolo plate III (1st part) 04/01/2012 13:52:00 HFI: He3 flow rate 3 -> 4 04/01/2012 16:00:00 HFI: temperature steps on bolo plate III (2nd part) 06/01/2012 00:00:00 HFI: temperature steps on bolo plate III (2nd part) [end] 07/01/2012 14:10:52 HFI: He3 flow rate 4 -> 5 08/01/2012 07:20:00 slew to Jupiter deep annuli scan 09/01/2012 14:23:36 HFI: He3 flow rate 5 -> 6 10/01/2012 04:20:00 planet: HFI Jupiter scan 11/01/2012 14:48:04 HFI: He3 flow rate 6 -> 7 13/01/2012 15:04:33 HFI: HFI: PID setup [1.6-K PID and dilu PID deactivated] 14/01/2012 16:00:00 <span style="background:#00FF00">period: end of HFI nominal operations</span> 16/01/2012 15:00:00 HFI channel setup [100mK thermometers] 16/01/2012 15:00:12 HFI: bolo plate at 110mK 16/01/2012 15:45:09 HFI: bolo plate at 300mK 17/01/2012 14:13:54 HFI: set Cernox thermistor [0.1-K nominal at 1.4K] 18/01/2012 15:20:10 HFI: set the channel compression parameters 18/01/2012 16:15:11 HFI: EOL-Fast VI at 300 mK 19/01/2012 14:30:52 HFI: channel setup [bolometers] 20/01/2012 19:58:08 HFI: EOL-RAW54 at 300mK 21/01/2012 13:29:58 HFI: EOL-RAW54 at 300mK [end] 22/01/2012 00:18:00 therm: loss of satellite thermal control 22/01/2012 15:00:00 CDMU PM-A reset 22/01/2012 22:59:58 HFI: DPU soft reboot 23/01/2012 05:00:00 solar flare: major one 25/01/2012 14:45:00 HFI: set the channel compression parameters 27/01/2012 19:00:00 solar flare 30/01/2012 21:53:00 period: slew to survey#6 07/02/2012 00:00:00 slew: large orbit correction manoeuvre 10/02/2012 16:30:00 HFI: EOL-Fast VI at 600 mK 14/02/2012 14:20:00 therm: CDMU PM-A switch over 20/02/2012 10:00:00 HFI: set the channel compression parameters (EOL#0) 20/02/2012 14:57:00 slew: touchup manoeuvre 21/02/2012 15:00:00 HFI: set the channel compression parameters (EOL#1) 21/02/2012 15:16:00 HFI: set the channel compression parameters (EOL#2) 22/02/2012 16:50:00 HFI: set the channel compression parameters (EOL#3) 23/02/2012 15:20:00 HFI: set the channel compression parameters (EOL#4)
(Planck) High Frequency Instrument
Calibration and Performance Verification
Data Processing Unit
Readout Electronic Unit
Launch & Early Orbit Phase
Junction Field Elect Transistor
Sorption Cooler Subsystem (Planck)
low frequency excess response
(Planck) Low Frequency Instrument
Data Processing Center
Command and Data Management Unit
Daily Tele-Communication Period
Attitude Control & Measurement Subsystem (AOCS)
Fiber Optic Gyroscope
Small Gap Recovery
hermal Stabilization Assembly
sudden change of the baseline level inside a ring
End Of Life