=== THE BASELINE OBSERVATION STRATEGY ===
 
The BSS is here described in terms of the parameters required to be entered into the PSO Survey Planning and Performance Tool, which is the software which generates the series of pointings transmitted to MOC for implementation of the BSS.
 
  
[[File:ScannStrategy.png]]
+
== Scanning strategy ==
  
==== Launch date and start of Survey Operations ====
+
Planck spins at 1 rpm about the symmetry axis of the spacecraft. The boresight of the telescope is 85° from the spin axis. As Planck spins, the instrument beams cover nearly great circles in the sky. The spin axis remains fixed (except for a small drift due to Solar radiation pressure) for between 39 and 65 spins (corresponding to the dwell times given above), depending on which part of its orbit Planck is in. To high accuracy, any one beam covers precisely the same sky between 39 and 65 times. The set of observations made during a period of fixed spin axis pointing is often referred to as a “ring”. This redundancy plays a key role in the analysis of the data, and is an important feature of the scan strategy.
The definition of the BSS is mostly independent of the launch date and the start date of survey operations. However, since the definition of the Planck orbit around L2 depends on the launch date, this can affect the choice of a few parameters of the scanning strategy. Indeed, not all precession phases are allowed for all launch dates (see below). Once the launch date is known, the start date of the survey operations does not influence the scanning strategy parameters.
 
  
==== Spin axis path ====
+
[[file:FocalPlane.png|thumb|left|300px|Planck focal plane showing the direction of scanning. Polarization-sensitive detectors are drawn with crosses indicating the polarization orientation.]]
  
The scanning direction of the Planck focal plane is explained in the figure below.
+
[[File:ScannStrategy.png|thumb|right|300px|Simplified illustration of the Planck scanning strategy, showing a "ring" traced as Planck spins by the focal plane on the sky.]]
  
[[file:FocalPlane.png]]
+
<!--- [[File:Observing_strat.png|thumb|300px|left|Planck scanning strategy, showing the additional motion of the spin axis.]] --->
  
The Planck spacecraft spins at a rate of 1 rpm, and the angle between the nominal optical axis and the spin axis is 85 degrees.
 
The path followed by the Planck spin axis is defined with respect to the Ecliptic plane. It corresponds to a motion in longitude which maintains an anti-Sun pointing, to which is added a cycloidal motion (precession) of the spin axis around the anti-Sun position (fiducial point). The cycloidal path is defined by the following functions:
 
  
λ = θ sin((-1)n ω(t-t0) + φ) (eq. 1)
+
As the Earth and Planck orbit the Sun, the nearly-great circles that are observed rotate about the ecliptic poles. The amplitude of the spin-axis cycloid is chosen so that all beams of both instruments cover the entire sky in one year. In effect, Planck tilts to cover first one Ecliptic pole, then tilts the other way to cover the other pole six months later. If the spin axis stayed exactly on the ecliptic plane, the telescope boresight were perpendicular to the spin axis, the Earth were in a precisely circular orbit, and Planck had only one detector with a beam aligned precisely with the telescope boresight, that beam would cover the full sky in six months. In the next six months, it would cover the same sky, but with the opposite sense of rotation on a given great circle. However, since the spin axis is steered in a cycloid, the telescope is 85&deg; to the spin axis, the focal plane is several degrees wide, and the Earth’s orbit is slightly elliptical, the symmetry of the scanning is (slightly) broken. Thus the Planck beams scan the entire sky exactly twice in one year, but scan only 93% of the sky in six months.  
β = -θ cos((-1)n ω(t-t0) + φ) (eq. 2)
 
  
where λ is the angular distance from the fiducial point in Ecliptic longitude, β the angular distance from the fiducial point in Ecliptic latitude, θ the spin axis precession amplitude, ω the pulsation of the precession, φ its phase, n the parameter which controls the motion direction of the precession, t is the time, and t0 is the first time during the Planck survey at which the fiducial point crosses the 0 Ecliptic longitude line.
+
<!-- It is important to remember that as long as the phase of the cycloid remains constant, one year cor- responds to exactly two coverages of the sky, while one Survey has an exact meaning only as defined in Table 1. Null tests between 1-year periods with the same cycloid phase are extremely powerful. Null tests between Surveys are also useful for many types of tests, particularly in revealing differences due to beam orientation. -->
  
The reasons to decide to use such a precession of the spin axis are mainly that (see PL-WG9-TN-001 for a more detailed explanation):
+
== Routine operations ==
• An excursion of the spin axis from the anti-Sun direction is required to fully observe the whole sky (no excursion would leave a large area unobserved around the Ecliptic poles)
 
• The precession motion allows to keep the Sun aspect angle constant during the whole survey, therefore minimizing the thermal constraint variations on the spacecraft
 
  
The following precession parameters have been chosen for the BSS:
+
Planck's orbit during routine operations traced a Lissajous path around the L2 point, as shown below.
• amplitude θ = 7.5o (this value is the lowest possible which allows to cover the whole sky with all detectors)
 
• n = 1 (anti-clockwise motion as seen from the Sun)
 
• pulsation ω = 2π / (half a year)
 
• The phase of the precession will be decided according to this set of criteria (in order of importance):
 
- respecting the operational constraints
 
- allowing the largest possible angle between two scans on the Crab
 
- avoiding null dipole amplitude for the whole mission
 
- optimizing the position of the planets in the beginning of the survey and with respect to the feasibility of their recovery (*)
 
- placing the two “deep fields” where Galactic foregrounds are minimum
 
- allowing a reasonable survey margin
 
  
The details of the justifications for these parameters can be found in PL-WG9-TN-001.
+
[[File:Orbit.pdf|thumb|center|500px|Trajectory of Planck from launch until 13 January 2012, in Earth-centred rotating coordinates (X is in the Sun-Earth direction; Z points to the north ecliptic pole). Symbols indicate the start of routine operations (circle), the end of the nominal mission (triangle), and the end of HFI data acquisition (diamond). The orbital periodicity is 6 months. The distance from the Earth-Moon barycentre is shown in the bottom right panel, together with Survey boundaries.]]
The current best choice for the phase is 340 deg.
 
  
==== Spin axis manoeuvres and exact pointings ====
 
  
The motion of the spin axis is not continuous. Every change in the spin axis position will be initiated by a manoeuvre which requires less than 5 minutes of time to be completed.  
+
Routine operations started on 12 August 2009. For convenience, we call an approximately six month period one “survey”, and use that term as an inexact shorthand for one coverage of the sky. Nine numbered “Surveys” are defined precisely in the Table below, which also shows the fraction of the sky covered by all frequencies.
 +
The fourth Survey was shortened somewhat so that the slightly different scanning strategy adopted for Surveys 5–8 (see below) could be started before the Crab nebula, an important polarization calibration source, was observed. The coverage of the fifth Survey is smaller than the others because several weeks of integration time were dedicated to “deep rings” (defined below) covering sources of special importance.
  
The duration between spin-axis manoeuvres is hereafter referred to as “dwell times”; and the angular distance between manoeuvres along the spin axis path is hereafter referred to as “spacings”.
+
[[File:Survey_definition.png|thumb|center|500px|Definition of the Planck Surveys]]
  
The dwell times and spacings for the BSS are defined as follows:
 
• The spacings are fixed to 2’. This is a parameter entered into the Survey Planning & Performance Tool.
 
• The dwell times vary from 2360 s to 3904 s.
 
The exact coordinates and dwell times are set by equations 1 and 2 when one has fixed the spacings.
 
  
 +
The spin axis was commanded to follow the cycloidal path across the sky in step-wise displacements of 2′ (Fig. 4). To maintain a steady advance of the projected position of the spin axis along the ecliptic plane, the time interval between two manoeuvres varied between 2360 s and 3904 s. The fraction of time used by the manoeuvres themselves (typical duration of five minutes) varied between 6% and 12%, depending on the phase of the cycloid. The data taken during manoeuvres are not used in the analysis. Over the nominal mission, the total reduction of scientific data due to manoeuvres was 9.2%.
  
==== Special observations ====
+
The path followed by the Planck spin axis was defined with respect to the Ecliptic plane. It corresponded to a motion in longitude which maintained an anti-Sun pointing (about one degree per day), to which was added a cycloidal motion (precession) of the spin axis around the anti-Sun position (fiducial point). The cycloidal path was defined by the functions
  
The special observations which can be foreseen in advance and integrated in the long-term pointing plan are listed in the Science Operations Plan for the Routine Phase:
+
<math>\lambda = \theta \sin((-1)^n ω (t-t_0)+\phi) </math> &nbsp; (eq. 1),
• special scanning on Solar System objects for calibration purposes
 
This will concern the following objects (planets): Mars, Jupiter, Saturn, Uranus and Neptune.
 
The Baseline Scanning Strategy will be maintained, but a special case will be set for Small-Gap Recovery algorithm application (see Planck/PSO/2005-016).
 
• special scanning on other (non-moving) sources (Galactic plane, etc) for calibration purposes
 
This will concern mostly the Crab Nebula for polarization calibration purposes. Two scans with scanning angles separated by at least 12 degrees will be performed. This will be achieved by adequately choosing the initial precession phase.
 
• special pointings during the calibration phase, not relative to celestial sources
 
  
 +
<math>\beta = -\theta \cos((-1)^n ω(t-t_0) + \phi) </math> &nbsp; (eq. 2),
  
 +
where &lambda; is the angular distance from the fiducial point in Ecliptic longitude, &beta; the angular distance from the fiducial point in Ecliptic latitude, &theta; the spin axis precession amplitude, &omega; the pulsation of the precession, &phi; its phase, <i>n</i> the parameter which controls the motion direction of the precession, <i>t</i> is the time, and <i>t</i><sub>0</sub> is the first time during the Planck survey at which the fiducial point crosses the Ecliptic longitude =0 line.
  
(*) The 1-N thrusters problems make it more difficult to recover gaps, since the 20-N thrusters must now be used to initiate a recovery. During roughly half of the year (in two 3-month periods), the recovery is not feasible because the margin with respect to the celestial constraints is too small. Therefore, we try to optimize the cycloid phase in order to have the most important planets in a recoverable area.
+
<!--- [[File:Cycloidal_scanning.JPG|thumb|300px|Spin axis path with a 7&deg; amplitude cycloidal scanning, from Ref.{{BibCite|dupac2005}}]] --->
  
 +
The reasons to decide to use such a precession of the spin axis are that: (a) an excursion of the spin axis from the anti-Sun direction is required to fully observe the whole sky (no excursion would leave a large area unobserved around the Ecliptic poles); (b) the precession motion keeps the Sun aspect angle constant during the whole survey, therefore minimizing the thermal constraint variations on the spacecraft.
  
=== THE SURVEY REQUIREMENTS AND SURVEY GOALS ===
+
The following precession parameters were chosen for the scanning strategy of Planck:
 +
* Amplitude &theta; = 7.5&deg;. (this value is the lowest possible which allows the entire sky to be covered with all detectors).
 +
* <i>n</i> = 1 (anti-clockwise motion as seen from the Sun).
 +
* Pulsation &omega; = 2&pi; / 6 months (a faster precession was considered, and has interesting advantages, but was not possible given the need to keep a 7.5&deg; amplitude in order to cover the whole sky).
 +
* The phase of the precession was decided according to a set of criteria (in order of importance): (a) respecting the operational constraints; (b) allowing the largest possible angle between two scans on the Crab Nebula (a polarization calibrator); (c) avoiding null dipole amplitude for the whole mission; (d) optimizing the position of the planets in the beginning of the survey and with respect to the feasibility of their recovery; (e) placing the two “deep fields” where Galactic foregrounds are minimum; (f) allowing a reasonable survey margin (i.e. the time allowed to recover lost pointings if a problem occurs). The phase selected was 340&deg; for Surveys 1 to 4, and 250&deg; for Surveys 5 to 8. The cycloid phase was shifted by 90&deg; for Surveys 5–8 to optimize the range of polarization angles on key sources in the combination of Surveys 1–8, thereby helping in the treatment of systematic effects and improving polarization calibration.
  
5.1 The survey requirements
+
The scanning strategy for the second year of Routine Operations (i.e. Surveys 3 and 4) was exactly the same as for the first year, except that all pointings were shifted by 1 arcmin along the cross-scanning direction, in order to provide finer sky sampling for the highest frequency detectors when combining two years of observations.
  
Survey requirements are numbers which are required to be achieved at the end of the Planck nominal mission.
+
Routine operations were significantly modified twice more:
They correspond to the values obtained from 12 months of observation, with the sensitivity which is measured in-flight during CPV phase.
+
* The sorption cooler switchover from the nominal to the redundant unit took place on 11 August 2010, leading to an interruption of acquisition of useful scientific data for about two days (one for the operation itself, and one for re-tuning of the cooling chain).
The survey requirements are the following:
+
* The satellite’s rotation speed was increased to 1.4 rpm between 8 and 16 December 2011 for observations of Mars, to measure possible systematic effects on the scientific data linked to the spin rate.
- mean integration time over the sky, in seconds / square degree
 
- percentile of sky not observed
 
- percentile of sky below half mean integration time
 
- percentile of sky above four times mean integration time
 
- percentile of sky above nine times mean integration time (i.e. “deep fields”)
 
- percentile of sky in which coverage suffers from sharp gradients (> 500 in grad(sec/deg2) )
 
- percentile of sky in which scanning directions are at least 5 over 16
 
Some of these numbers are NOT strong requirements: they are marked with ** in the table.
 
  
See Planck/PSO/2006-009 section 4.2.2 for more details on these quantities.
+
Data were acquired in the normal way during the above two periods, but were not used in the generation of products.
The tables below present:
 
- the survey requirements for each detector row: the values in the table are valid for every detector in a given row
 
- the survey requirements for each frequency: the values in the table are from the co-added map of all detectors of a given frequency – the mean is presented as if there were one detector
 
  
 +
The scientific lifetime of the HFI bolometers ended on 13 January 2012 when the supply of 3He needed to cool them to 0.1K ran out. LFI continued to operate and acquire scientific data until 3 October 2013.
 +
On 4 October 2013 Planck ended its routine operations, after executing its last observation of the Crab Nebula, and started its decommissioning activities.
 +
On 19 October 2013, the sorption cooler and the two instruments (LFI and HFI) were switched off.
 +
The final command to the Planck satellite was sent on 23 October 2013, marking the end of operations.
  
Row Mean %p=0 %<1/2 ** %>4 ** Deep ** Sharp grs Sc dir >5
+
Add something regarding the final orbit.
LFI 44 762 0 0.62 1.0 0.39 1.6 0.27
 
143 – 5-8 762 0 1.8 0.95 0.44 1.5 0.09
 
143 – 1-4 762 0 1.8 1.0 0.43 1.6 0.12
 
545-857 762 0 3.2 1.1 0.38 1.6 0.11
 
HFI 353 762 0 3.3 1.2 0.39 1.6 0.10
 
217 – 5-8 762 0 3.2 1.3 0.38 1.6 0.11
 
217 – 1-4 762 0 3.4 1.3 0.37 1.7 0.15
 
100 – 1/4 762 0 0.87 1.4 0.38 1.0 0.27
 
100 – 2/3 762 0 0.86 1.4 0.38 1.7 0.22
 
70 - 18/23 762 0 0.72 1.5 0.39 1.0 0.34
 
70 - 19/22 762 0 0.72 1.5 0.38 1.8 0.35
 
70 - 20/21 762 0 0.72 1.5 0.38 1.8 0.37
 
LFI 30 762 0 0.65 1.6 0.42 1.8 0.80
 
  
 +
Operations were extremely smooth throughout the mission. The total observation time lost due to a few anomalies is about 5 days, spread over the 15.5 months of the nominal mission.
  
Frequency Mean %p=0 %<1/2** %>4** Deep ** Sharp grs Sc dir >5
 
LFI 30 762 0 0.65 1.6 0.42 1.8 0.80
 
LFI 44 762 0 0.72 1.5 0.28 1.4 3.7
 
LFI 70 762 0 0.74 1.7 0.44 1.2 1.2
 
HFI 100 762 0 0.76 1.5 0.43 1.1 0.61
 
HFI 143 762 0 1.2 1.1 0.49 1.0 0.47
 
HFI 217 762 0 2.1 1.4 0.41 1.1 0.69
 
HFI 353 762 0 3.3 1.2 0.39 1.6 0.10
 
545-857 762 0 3.2 1.1 0.38 1.6 0.11
 
  
 +
The figure below shows the actual path of the spin axis of Planck during its entire lifetime.
  
 +
[[File:Scanning.pdf|thumb|center|500px|Top two panels: path of the spin axis of Planck (in ecliptic longitude and latitude) over the period 12 August 2009 (91 days after launch) to 13 January 2012, the “0.1 K mission” period (Table 1). Bottom panel: evolution of the dwell time during the same period. Intervals of accelera- tion/deceleration (e.g., around observations of the Crab) are clearly visible as symmetric temporary increases and reductions of dwell time. Survey boundaries are indicated by vertical dashed lines in the upper plot. The change in cycloid phase is clearly visible at operational day (OD) 807. The disturbances around OD 950 are due to the “spin-up campaign”.]]
  
 +
=== Sky coverage ===
  
Meaning of these requirements:
+
As an example, the maps below exhibits the progress of sky coverage during the first months of survey (black colour = unobserved areas).
- mean: the integration time averaged over the sky at the end of the mission should be at least the one mentioned in the table, for each row / frequency
 
- the precentile of sky not observed should be zero
 
- (no strong requirement from the three central columns)
 
- the precentile of sky suffering from sharp gradients should be at most the value indicated in the table, for each row / frequency (TBC)
 
- the percentile of the sky for which scanning directions probed are at least 5 over 16 should be at least the value indicated in the table
 
  
  
5.2 The survey goals
+
<gallery widths=330 perrow=3 caption="HFI 353-GHz integration time after <i>N</i> months of survey. The units here are seconds per square degree, normalized to one detector.">
 +
File:353_1month.png|After 1 month
 +
File:353_2month.png|After 2 months
 +
File:353_3month.png|After 3 months
 +
File:353_4month.png|After 4 months
 +
File:353_5month.png|After 5 months
 +
File:353_6month.png|After 6 months
 +
File:353_7month.png|After 7 months
 +
File:353_8month.png|After 8 months
 +
File:353_9months.png|After 9 months
 +
File:353_10months.png|After 10 months
 +
File:353_11months.png|After 11 months
 +
File:353_12months.png|After 12 months
 +
</gallery>
  
Survey goals are numbers which are wished to be achieved at the end of the Planck nominal mission.  
+
A dynamic visualization of sky coverage by the Planck scanning strategy can be found [http://www.youtube.com/watch?v=WwFXuZ0B3B8 here] and [http://www.youtube.com/watch?v=7Zu-aiEiDtY here].
Survey goals correspond to the values obtained after a complete nominal mission (15 months of survey with nominal noise – as predicted from ground, and no gaps).
 
The survey goals are the same quantities as the survey requirements.
 
The tables below present these quantities the same way as for the survey requirements.
 
  
  
 +
As an additional example, the following figures illustrate the distribution of integration time over the sky for the nominal and “0.1-K” (i.e., until the 3He ran out, see Table) missions, for the 353-GHz frequency channel.
  
 +
[[File:Integration_time_353GHz_nominalmission.pdf|thumb|center|500px]]
  
Row Mean %p=0 %<1/2 ** %>4 ** Deep ** Sharp grs Sc dir >5
+
[[File:Integration_time_353GHz_coldmission.pdf|thumb|center|500px| Survey coverage for the nominal (top) and 0.1 K (bottom) missions (see Table). The colour scale represents total integration time (varying between 50 and 8000 s deg−2 ) for the 353-GHz channel. The maps are at <i>N</i><sub>side</sub> = 1024.]]
LFI 44 953 0 3.9 1.0 0.40 1.0 0.27
 
143 – 5-8 953 0 4.1 1.0 0.42 1.0 0.09
 
143 – 1-4 953 0 4.1 1.1 0.41 1.1 0.12
 
545-857 953 0 4.2 1.2 0.37 1.1 0.11
 
HFI 353 953 0 4.3 1.2 0.37 1.1 0.10
 
217 – 5-8 953 0 4.3 1.3 0.36 1.1 0.11
 
217 – 1-4 953 0 4.3 1.4 0.36 1.1 0.15
 
100 – 1/4 953 0 4.3 1.4 0.37 1.1 0.27
 
100 – 2/3 953 0 4.4 1.5 0.36 1.2 0.23
 
70 - 18/23 953 0 4.4 1.5 0.37 1.2 0.35
 
70 - 19/22 953 0 4.5 1.5 0.37 1.2 0.36
 
70 - 20/21 953 0 4.4 1.6 0.38 1.2 0.37
 
LFI 30 953 0 4.5 1.7 0.42 1.2 0.80
 
  
 +
The total integration time after the end of HFI operations (January 2012) is shown in the following maps. Units are seconds per square degree, normalized to one detector, for all maps. The projection is full-sky Mollweide centred on the Galactic centre.
  
Frequency Mean %p=0 %<1/2** %>4** Deep ** Sharp grs Sc dir >5
+
<gallery widths=330px perrow=3 caption="Integration time after the end of HFI operations (January 2012). The units here are seconds per square degree, normalized to one detector.">
LFI 30 953 0 4.5 1.7 0.42 1.2 0.80
+
File:HFI_fullmission_100GHz1-4.png|HFI 100 GHz 1,4
LFI 44 953 0 3.3 1.5 0.28 1.5 3.7
+
File:HFI_fullmission_100GHz2-3.png|HFI 100 GHz 2,3
LFI 70 953 0 4.3 1.7 0.42 1.3 1.2
+
File:HFI_fullmission_143GHz1-4.png|HFI 143 GHz 1-4
HFI 100 953 0 4.3 1.5 0.41 1.2 0.61
+
File:HFI_fullmission_143GHz5-8.png|HFI 143 GHz 5-8
HFI 143 953 0 4.0 1.1 0.44 1.1 0.47
+
File:HFI_fullmission_217GHz1-4.png|HFI 217 GHz 1-4
HFI 217 953 0 4.2 1.4 0.38 1.2 0.69
+
File:HFI_fullmission_217GHz5-8.png|HFI 217 GHz 5-8
HFI 353 953 0 4.3 1.2 0.37 1.1 0.10
+
File:HFI_fullmission_353GHz.png|HFI 353 GHz
545-857 953 0 4.2 1.2 0.37 1.1 0.11
+
File:HFI_fullmission_545-857GHz.png|HFI 545 GHz / 857 GHz
 +
File:LFI25_coldmission.png|LFI-25 (44 GHz)
 +
File:LFI27_coldmission.png|LFI 30 GHz
 +
</gallery>
  
 +
=== Special Observations ===
  
 +
During routine scanning, the Planck instruments naturally observe objects of special interest for calibration. These include Mars, Jupiter, Saturn, Uranus, Neptune, and the Crab nebula. Different types of observations of these objects were performed, as summarised below.
 +
* Normal scans on solar system objects and the Crab nebula. The complete list of observing dates for these objects can be found in Planck Collaboration (2013).
 +
* “Deep rings”. These special scans are performed on observations of Jupiter and the Crab nebula from January 2012 onward. They comprise deeply and finely sampled (step size 0.′5) observations with the spin axis along the Ecliptic plane, lasting typically two to three weeks. Since the Crab is crucial for calibration of both instruments, the average longitudinal speed of the pointing steps was increased before scanning the Crab, to improve operational margins and ease recovery in case of problems.
 +
* “Drift scans”. These special observations are performed on Mars, making use of its proper motion. They allow finely-sampled measurements of the beams, particularly for HFI. The rarity of Mars observations during the mission gives them high priority.
  
5.3 Start and end of surveys
 
  
The completion of a given “survey” will be declared when the logical AND of all frequency-coverage maps is greater than 95 %, OR the sky has been surveyed over a consecutive period of 7.5 months.
+
Below is a list of these observations, with the ''deep rings'' (Jupiter and the Crab) and ''drift scans'' (Mars only) in '''boldface'''.
  
 +
* Crab: 16-22 September 2009
  
Survey 1: starts August 13, 2009
+
* Mars: 17-29 October 2009
ends Feb. 10, 2010
 
  
Survey 2: starts Feb. 10, 2010
+
* Jupiter: 25 October – 1 November 2009
ends Aug. 14, 2010
 
  
Survey 3: starts Aug. 14, 2010 (assuming no mini-CPV)
+
* Neptune: 1-8 November 2009
ends Feb. 12, 2011
 
  
Survey 4: starts Feb. 12, 2011
+
* Uranus: 6-16 December 2009
ends Aug. 16, 2011
 
  
5.4 Planets and calibrators during surveys
+
* Saturn: 2-8 January 2010
  
Crab
+
* Crab: 6-12 March 2010
Sept. 16, 2009 – Sept. 22, 2009
 
  
Mars
+
* Mars: 9-18 April 2010
Oct. 17, 2009 – Oct. 29, 2009
 
  
Jupiter
+
* Neptune: 15-23 May 2010
Oct. 25, 2009 – Nov. 1, 2009
 
  
Neptune
+
* Saturn: 13-22 June 2010
Nov. 1, 2009 – Nov. 8, 2009
 
  
Uranus
+
* Uranus: 27 June 5 July 2010
Dec. 6, 2009 Dec. 16, 2009
 
  
Saturn
+
* Jupiter: 1-9 July 2010
Jan. 2, 2010 – Jan. 8, 2010
 
  
Crab
+
* Crab: 15-21 September 2010
March 6, 2010 – March 12, 2010
 
  
Mars
+
* Neptune: 3-11 November 2010
April 9, 2010 – April 18, 2010
 
  
Neptune
+
* Jupiter: 9-18 December 2010
May 15, 2010 – May 23, 2010
 
  
Saturn
+
* Uranus: 12-21 December 2010
June 13, 2010 – June 22, 2010
 
  
Uranus
+
* Saturn: 15-22 January 2011
June 27, 2010 – July 5, 2010
 
  
Jupiter
+
* Crab: 7-12 March 2011
July 1, 2010 – July 9, 2010
 
  
Crab
+
* Neptune: 18-26 May 2011
Sept. 15, 2010 – Sept. 21, 2010
 
  
Neptune
+
* Saturn: 30 June - 9 July 2011
Nov. 3, 2010 – Nov. 11, 2010
 
  
Jupiter
+
* Uranus: 3-11 July 2011
Dec. 9, 2010 – Dec. 18, 2010
 
  
Uranus
+
* Jupiter: 9-15 August 2011
Dec. 12, 2010 – Dec. 21, 2010
 
  
Saturn
+
* Crab: 10-18 September 2011 (performed with the 250&deg; phase cycloidal strategy)
Jan. 15, 2011 – Jan. 22, 2011
 
  
Crab
+
* Crab: 20-23 September 2011 (performed with the 340&deg; phase cycloidal strategy)
March 7, 2011 – March 12, 2011
 
  
Neptune
+
* '''Mars''': 8-16 December 2011 ("drift scan", Mars allowed to move through the Planck focal plane via its proper motion)
May 18, 2011 – May 26, 2011
 
  
Saturn
+
* Mars: 17-26 December 2011 (normal scanning)
June 30, 2011 – July 9, 2011
 
  
Uranus
+
* '''Jupiter''': 8-30 January 2012 (deep ring)
July 3, 2011 – July 11, 2011
 
  
Jupiter
+
* '''Crab''': 26 February - 16 March 2012 (deep ring)
Aug. 9, 2011 – Aug. 15, 2011
 
  
 +
* '''Jupiter''': 1-14 September 2012 (deep ring)
  
 +
* '''Crab''': 14 September - 1 October 2012 (deep ring)
  
 +
* Neptune: 19-27 November 2012
  
 +
* Uranus: 24-30 December 2012
  
 +
* Saturn: 30 January - 5 February 2013
  
 +
* '''Jupiter''': February 2013 (deep ring)
  
 +
* '''Crab''': Feb. 28th - March 15th, 2013 (deep ring)
  
 +
* Neptune: June 4th - June 12th, 2013
  
[[Category:Ground Segment and Operations]]
+
* Uranus: July 9-16th, 2013
 +
 
 +
* Saturn: July 20-26th, 2013
 +
 
 +
* '''Crab''': Sept. 10th - Oct. 3rd, 2013 (deep ring)
 +
 
 +
Note that on Sept. 14-16th, 2013, LFI also performed a special dipole calibration observation.
 +
 
 +
=== Unplanned events ===
 +
 
 +
The main unplanned events included the following.
 +
 
 +
* Very minor deviations from the scanning law included occasional (on the average about once every two months) under-performance of the 1-<i>N</i> thrusters used for regular manoeuvres, which implied that the corresponding pointings were not at the intended locations. These deviations had typical amplitudes of 30 arcsec, and had no significant impact on the coverage map.
 +
 
 +
* The thruster heaters were unintentionally turned off between 31 August and 16 September 2009 (the so-called “catbed” event).
 +
 
 +
* An operator error in the upload of the on-board command timeline led to an interruption of the normal sequence of manoeuvres and therefore to Planck pointing to the same location on the sky for a period of 29 h between 20 and 21 November 2009 (“the day Planck stood still”). Observations of the nominal scanning pattern resumed on 22 November, and on 23 November a recovery operation was applied to survey the previously missed area. During the recovery period the duration of pointing was decreased to allow the nominal law to be caught up with. As a side effect, the RF transmitter was left on for longer than 24 h, which had a significant thermal impact on the warm part of the satellite.
 +
 
 +
* As planned, the RF transmitter was initially turned on and off every day in synchrony with the daily visibility window, in order to reduce potential interference by the transmitter on the scientific data. The induced daily temperature variation had a measurable effect throughout the satellite. An important effect was on the temperature of the 4He-JT cooler compressors, which caused variations of the levels of the interference lines that they induce on the bolometer data (Planck HFI Core Team 2011a). Therefore the RF transmitter was left permanently on starting from 25 January 2010 (257 days after launch), which made a noticeable improvement on the daily temperature variations.
 +
 
 +
* During the coverage period, the operational star tracker switched autonomously to the redundant unit on two occasions (11 January 2010 and 26 February 2010); the nominal star tracker was restored a short period later (3.37 and 12.75 h, respectively) by manual power-cycling. Although the science data taken during this period have normal quality, they have not been used, because the redundant star tracker’s performance is not fully characterized.
 +
 
 +
For more information, see {{BibCite|planck2011-1-1}}. For a complete list of operational events, including contigencies, see the [[Planck operational state history | POSH]] (Planck operational state history).
 +
 
 +
 
 +
<!---
 +
 
 +
== Data gap recoveries ==
 +
 
 +
Gaps in the data flow can occur for various reasons.
 +
 
 +
Anomalies may occur at spacecraft or instrument level, but also due to failures in the ground-to-spacecraft link or the ground segment itself. The adverse effects of such anomalies may be the loss of scientific data corresponding to one or several planned pointings, which have not been acquired and/or stored in memory.
 +
 
 +
Failure to acquire proper scientific data may occur to one or both instruments.
 +
 
 +
When a gap occurred, scientific criteria were applied to decide whether to recover the data through the Small-Gap Recovery procedure.
 +
 
 +
[[File:AHF_353_OD389.png|thumb|400px|Integration time of the 353-GHz detectors ({{PlanckPapers|lamarre2010}}) after 389 Operational Days (the unit is seconds per square degree, normalized to one detector). The first significant data gap and recovery are clearly visible.]]
 +
 
 +
The Small-Gap Recovery (SGR) procedure could be applied by MOC or PSO.
 +
 
 +
* '''MOC-triggered SGR''': Within its nominal scheduling procedure for an OD, the MOC searches the PPL for PREF corresponding to the OD being processed and any pointings which are the subject of a Small Gap Recovery. As the PREF are sorted in chronological order according to their nominal start time, those corresponding to a small gap will naturally be the earliest. After checking attitude constraints, all observable pointings are listed and their dwell times reduced (initially) to the Minimum Dwell Time (MDT), as given in the PPL.
 +
Having included all valid PREF the required slew times are calculated. With the required slew times and minimum dwell times for all pointings, the OD schedule may be under-populated; in this case the dwell times of all scheduled pointings will be increased equally to make use of all available time in the OD. If the resulting schedule is over-populated, even with MDT for all pointings, the recovery cannot be constrained to a single OD. The sequence of pointings for the ODs involved is optimized in PREF scheduling and dwell times determined in order to effect the recovery and revert to the nominal timeline as quickly as possible.
 +
 
 +
* '''PSO-triggered SGR''':
 +
PSO declares a small gap when pointings that have been executed result in data of insufficient quality or inadequate frequency coverage. This assessment is based on data quality and instrument health information provided by the DPCs. The algorithm that was used by the PSO to check the scientific validity of a pointing was implemented within the SPPT software tool. The SPPT ingested on a weekly basis a Weekly Health Report (WHR) for the HFI and LFI containing information on the working status of each detector and their expected condition over the following four weeks. On a daily basis, a Daily Quality Report (DQR) provided by the DPCs for both instruments, included a set of parameters that described the quality of the detection achieved by each individual detector for every pointing executed.
 +
 
 +
The scheme for declaring a Small-Gap Recovery from PSO is the following.
 +
 
 +
- If a pointing fails to meet the chosen requirement, it becomes an SGR candidate.
 +
 
 +
- If there are at least 12 consecutive pointings which are declared SGR candidates, and the problem has been identified and solved, then an SGR is triggered.
 +
Recoveries are only carried out if the recovery slewing is guaranteed to be in OCM. MOC carried out this analysis and decided whether they should perform the SGR accordingly.
 +
 
 +
- The start and end times of the gap and the list of the pointing numbers (or just the numbers of the first and last pointings to be recovered) were then sent to MOC by E-mail, with the notification to start a Small-Gap Recovery.
 +
 
 +
- MOC implemented the Small-Gap Recovery, provided the pointings could still be scheduled with respect to their latest start time, using the same scheme as described in the MOC-triggered SGR section
 +
 
 +
Throughout the Planck mission, data losses were very rare. In fact Small-Gap Recovery was applied only a couple of times.
 +
 
 +
 
 +
--->
 +
 
 +
== Satellite environment ==
 +
 
 +
The thermal and radiation environment of the satellite during the routine phase is illustrated in the figure below.
 +
 
 +
[[File:ThermalEnvironment.pdf|thumb|center|500px|Thermal and radiation environment of Planck. Vertical lines indicate boundaries between Surveys. Top panel: cosmic ray flux as measured by the onboard SREM; its decrease over time is due to the corresponding increase in solar activity, indicated by the sunspot number5. Solar flares show up as spikes in the proton flux. Second and third panels: temperature variation at two representative locations in the room-temperature SVM, i.e., on one of the (HFI) helium tanks and on one of the LFI back-end modules (BEMs). The sine-wave modulation tracks the variation of distance from the Sun. Bottom panel: temperature evolution of VG3, the coldest of three V-grooves, to which the sorption cooler is heat-sunk. The disturbances on the curve are due to adjustments of the operational parameters of this cooler.]]
 +
 
 +
[[File:EarlyFig7.pdf|thumb|center|500px|A zoom of a seven-day period on the temperature of the Helium tank is shown before (top panel) and after (middle panel) the RF transponder was left permanently on, and illustrates the reduction in the daily temperature variations achieved by this operation. Smaller variations remain, due to thermal cycling of other elements (in this case the LFI Data Processing Unit), and are clearly visible in the middle panel. The bottom panel shows the typical effecto of weekly updates of the operational parameters of the Sorption Cooler (marked as vertical lines) on the temperature of the third V-groove.]]
 +
 
 +
 
 +
The dominant long-timescale thermal modulation is driven by variations in Solar power absorbed by the satellite in its elliptical orbit around Sun. The thermal environment is sensitive to various satellite operations. For example, before day 257, the communications trans- mitter was turned on only during the daily data transmission period, causing a daily temperature variation clearly visible at all locations in the Service Module (Fig. 6). Some operational events4 had a significant thermal impact as shown in the above figure and detailed in Planck Collaboration (2013): Most notably: a) the “catbed” event between 110 and 126 days after launch; b) the “day Planck stood still” 191 days after launch; c) the sorption cooler switchover (OD 460); d) the change in the thermal control loop (OD 540) of the LFI radiometer electronics assembly box; and e) the spin-up campaign around OD 950.
 +
 
 +
 
 +
The sorption cooler dissipates a large amount of power and drives temperature variations at multiple levels in the satellite. The bottom panel of the above figure shows the temperature evolution of the coldest of the three stacked conical structures or V-grooves that thermally isolate the warm service module (SVM) from the cold payload module. Most variations of this structure are due to quasi-weekly power input adjustments of the sorption cooler, whose tube-in-tube heat-exchanger supplying high pressure gas to the 20K Joule-Thomson valve and returning low pressure gas to the compressor assembly is heat-sunk to it. Many adjustments are seen in the roughly three months leading up to switchover. After switchover to the redundant cooler , thermal instabilities were present in the newly operating sorption cooler, which required frequent adjustment, until they reduced significantly around day 750.
 +
 
 +
The figure  also shows the radiation environment history. As Planck started operations, Solar activity was extremely low, and Galactic cosmic rays (which produce sharp “glitches” in the HFI bolometer signals) were more easily able to enter the heliosphere and hit the satellite. As Solar activity increased the cosmic ray flux measured by the onboard standard radiation environment monitor (SREM; Planck Collaboration 2013) decreased correspondingly, but Solar flares increased.
 +
 
 +
== Satellite pointing performance ==
 +
 
 +
Redundant star trackers on board Planck (co-aligned within 0.2&deg; with the instrument field-of-view) provide absolute attitude mea- surements at a frequency of 8 Hz. These measurements are used by the attitude control computer on board Planck to execute the commanded reorientations of the satellite.
 +
The star-tracker data were further reprocessed daily on the ground, to provide the following.
 +
* Filtered attitude information at  afrequency of 4Hz during the stable observation periods. The filtering algorithm basically suppresses high-frequency components of the measurement noise (i.e., at frequencies well above the nutation frequency);
 +
* Reconstructed attitude parameters averaged over each spin period (60 s) and each stable observation period (or dwell, typically of 50 min length).
 +
 
 +
The result was a daily attitude history file (AHF), which contained the filtered attitude of the three coordinate axes based on the star trackers every 0.125 s during stable observations (“rings”) and every 0.25 s during re-orientation slews. The production of the AHF was the first step in the determination of the pointing of each detector on the sky. The attitude data during the periods that the satellite is slewing are not filtered on the ground and are therefore much noisier.
 +
 
 +
 
 +
The AHF was used by the data processing centres to estimate the location of each detector beam with respect to the satellite reference frame, based mainly on observations of planets (as described in Planck HFI Core Team 2011a).
 +
 
 +
 
 +
Planck rotates about its principal axis of inertia at 1 rpm, with a precision of &plusmn;0.1% (see the figure).
 +
 
 +
[[File:EarlyM_Fig9.pdf|thumb|center|300px| The top panel shows the measured spin rate over the coverage period, which is always within &plusmn;0.1% of 1 rpm. The spin rate typically adopts one of three values as can be seen in the middle panel, which is a zoom into a period of several days. In the bottom panel we show the typical drift of the spin rate within a dwell, due to small residual torques applied to the satellite.]]
 +
 
 +
The observed variation of the spin rate was very systematic due to the following operational features.
 +
* The thruster used for a manoeuvre is selected depending on whether the spin rate preceding the manoeuvre is below or above its nominal value. Each thruster has a slightly different “minimum thrust level”, which determines the spin rate actually achieved. Therefore, the spin rate after each manoeuvre will toggle between two different spin rate states which bound the nominal value. If one of these states is very close to the nominal value, drift during the dwell period (see next item) could cause it to change from one side to the other of the nominal value, and thus to toggle on the next manoeuvre to a “third” spin rate state.
 +
* Within a dwell period, the spin rate drifts slightly (typically 10<sup>−6</sup> deg s<sup>−1</sup> per minute) due to residual torques on the satellite, caused by solar radiation pressure and exhaust of helium from the dilution cooler system.
 +
 
 +
 
 +
The principal axis of inertia, about which Planck rotates, is off- set from the geometric axis by ∼28.6′ (see the figure). The time evolution of the measured offset angle shows a long-timescale variation which is clearly linked to the seasonal power input vari- ations on the solar array; this effect is not a real variation of the offset angle but is instead due to a thermoelastic deformation of the SVM panel that holds the star trackers (However, it appears as real in the filtered attitude). Other thermoelastic deformations that give rise to similar effects are related to specific operations which have a thermal impact (see Fig. 10). The dominant (false) offset angle variation before 25 January 2010 is due to the daily thermal impact of the RF transponder being switched on and off, and after that date it is related to thermal control cycles in electronic units located near the star trackers; the peak-to-peak amplitude of the effect is of order 0.15′ before and 0.08′ after 25 January. These effects can be correlated to the temperature of the units responsible. They easily mask the real variation of the offset angle, which is due to gradual depletion of the fuel and helium tanks, and is of order 2.5′′ per month
 +
(The variation is approximately 5′ per 50 kg of fuel expended. About 170 g month<sup>−1</sup> are expended in scanning manoeuvres and about 50 g in each orbital maintenance manoeuvre, currently performed once every 8 weeks. Approximately 215 g month<sup>−1</sup> of helium are vented to space by the HFI dilution cooler.)
 +
. This real variation of the wobble causes a corresponding change over time of the radius of the circle which each detector traces on the sky.
 +
 
 +
[[File:EarlyM_Fig10.pdf|thumb|center|300px| Top: evolution of the measured offset between the principal axis of inertia and the geometric axis of the satellite (one point is plotted for each dwell period of approximately 50 min). The time variations observed are not real changes in the offset angle, but are instead due to thermoelastic deformations in the panel that supports the star trackers. Bottom: zooming in on short periods of time before (left) and after (right) the RF transponder was turned permanently on, reveals periodic variations (before, dominated by the daily RF On-Off switching; after, dominated by thermal control cycling of nearby units with typically one hour periodicity).]]
 +
 
 +
As described in Tauber et al. (2010a), Planck’s spin axis is displaced by 2′ approximately every 50 min. A typical sequence of manoeuvres and dwells is illustrated below.
 +
 
 +
[[File:EarlyM_Fig11.pdf|thumb|center|300px| Left panels: motion of the spin axis (i.e., the direction of the principal axis of inertia) in latitude (top) and longitude (bottom) as a function of time, over a typical period of 70 min, including two manoeuvres clearly identified by the large excursions in latitude and longitude. The dwell periods show the much smaller amplitude motions due to nutation and drift arising from solar radiation pressure. Top right: motion of the spin axis in Galactic latitude and longitude for a sequence of three manoeuvres and dwells. The attitude measurements during the slew are not filtered and are therefore very noisy; the measurements during each dwell are strongly clustered and show up as dense spots. Bottom right: zoom on a portion (about 30 min) of a dwell showing clearly the periodic motions which are a combination of the drift and residual nutation (period around 5.4 min).]]
 +
 
 +
Each manoeuvre is carried out as a sequence of three thrusts spaced over three minutes (1st impulse – two minutes wait – 2nd impulse – one minute wait – 3rd impulse), designed to cancel nutation as much as possible. Each manoeuvre lasts an average of about 220 s, as defined by on-board software mode transitions9, which are used on the ground to trigger the end and start times of attitude filtering.
 +
 
 +
The pointing achieved after each reorientation is of course not exactly the commanded one; the difference, which varies between 2 and 8′′ during the coverage period, is shown in Fig. 12.
 +
 
 +
[[File:EarlyM_Fig12.pdf|thumb|center|300px| The plot shows the difference between the achieved and com- manded pointing after each 2′ manoeuvre; the difference is correlated with the duration of the previous dwell (see text). The vertical lines correspond to the very few occasions when the manoeuvre sequence did not execute as planned, resulting in anomalously high pointing errors.]]
 +
 
 +
This variation is systematically related to the duration of the dwell preceding the manoeuvre, since the preceding pointing drifts due to solar radiation pressure, and the angular amplitude of the following manoeuvre changes correspondingly. The thrust sequence required for each manoeuvre is computed on-board based on the known mass properties of the satellite and known thruster response functions; the error made on each manoeuvre is mainly driven by the (imperfect) on-board knowledge of these properties, and therefore depends systematically on the amplitude of the manoeuvre. On very few occasions (visible in Fig. 12), the thruster sequence performance did not execute as planned, and resulted in a much larger manoeuvre error.
 +
 
 +
Although the thruster sequence is designed to damp nutation, it does not do so perfectly. The peak amplitude of the residual nutation is typically 3′′ and does not vary significantly in time (see Fig. 13).
 +
 
 +
 
 +
[[File:EarlyM_Fig13.pdf|thumb|center|300px| The peak amplitude of the residual nutation averaged within each dwell time, over the coverage period.]]
 +
 
 +
The period of the nutation is 5.425 ± 0.010 min, determined by the inertial properties of the satellite. Neither the amplitude nor the period of the nutation are observed to drift during a dwell period.
 +
 
 +
The last major characteristic of pointing within dwells is the drift due to solar radiation pressure. The total amplitude of the drift within each dwell varies between 5 and 12′′, depending on the duration of each dwell (see Fig. 14). The rate of drift varies between 4 and 10′′ h<sup>−1</sup>, weakly correlated with the Solar Aspect Angle (which varies by very small amounts throughout the mission).
 +
 
 +
[[File:EarlyM_Fig14.pdf|thumb|center|300px| The total drift due to solar radiation pressure within each dwell, which depends on the time length of the dwell (see Fig. 3). The drift rate (shown in the lower panel) is approximately constant at approximately 9′′ h<sup>−1</sup> .]]
 +
 
 +
The pointing characteristics at AHF level are summarized in the table below.
 +
 
 +
[[File:Pointing_perfo.png|thumb|center|500px| Pointing performance over the nominal mission]]
 +
 
 +
A detailed description of the AHF algorithm and its performance in flight can be found in {{PlanckPapers|Tuttlebee_Gienger2012}}.
 +
 
 +
 
 +
 
 +
=== Improvements on the AHF ===
 +
 
 +
Early on it was realized that there were some problems with the pointing solutions. First, the attitude determination during slews was poorer than during periods of stable pointing. Second, the solutions were affected by thermoelastic deformations in the satellite driven by temperature variations resulting from imperfect thermal control loops, the sorption cooler, and the thermally- driven transfer of helium from one tank to another.
 +
 
 +
A significant effort was made to improve ground processing capability to address the above issues. As a result, three different versions of the attitude history were produced for the whole mission:
 +
* the AHF, based on an optimized version of the initial (pre-launch) algorithm;
 +
* the Gyro-based attitude history hile (GHF), based on an algorithm that uses, in addition to the star tracker data, angular rate measurements derived from the on-board fibre-optic gyro (note that it was not initially planned to use its data for computation of the attitude over the whole mission)
 +
* the Dynamical attitude history file (DHF), based on an algorithm that uses the star tracker data in conjunction with a dynamical model of the satellite, and which accounts for the existence of disturbances at known sorption cooler operation frequencies.
 +
 
 +
Both the GHF and DHF algorithms significantly improve the recovery of attitude during slews. Due to the deadlines involved, the optimised AHF algorithm has been used in the production of the Planck products. Use the improved algorithms could enable the use of the scientific data acquired during slews (9.2% of the total).
 +
 
 +
{{PlanckPapers|Tuttlebee_Gienger2012}} also includes an analysis of the performance of GHF and DHF.
 +
 
 +
==References==
 +
<references />
 +
 
 +
 
 +
[[Category:PSOBook]]

Latest revision as of 09:23, 10 July 2018

Scanning strategy[edit]

Planck spins at 1 rpm about the symmetry axis of the spacecraft. The boresight of the telescope is 85° from the spin axis. As Planck spins, the instrument beams cover nearly great circles in the sky. The spin axis remains fixed (except for a small drift due to Solar radiation pressure) for between 39 and 65 spins (corresponding to the dwell times given above), depending on which part of its orbit Planck is in. To high accuracy, any one beam covers precisely the same sky between 39 and 65 times. The set of observations made during a period of fixed spin axis pointing is often referred to as a “ring”. This redundancy plays a key role in the analysis of the data, and is an important feature of the scan strategy.

Planck focal plane showing the direction of scanning. Polarization-sensitive detectors are drawn with crosses indicating the polarization orientation.
Simplified illustration of the Planck scanning strategy, showing a "ring" traced as Planck spins by the focal plane on the sky.


As the Earth and Planck orbit the Sun, the nearly-great circles that are observed rotate about the ecliptic poles. The amplitude of the spin-axis cycloid is chosen so that all beams of both instruments cover the entire sky in one year. In effect, Planck tilts to cover first one Ecliptic pole, then tilts the other way to cover the other pole six months later. If the spin axis stayed exactly on the ecliptic plane, the telescope boresight were perpendicular to the spin axis, the Earth were in a precisely circular orbit, and Planck had only one detector with a beam aligned precisely with the telescope boresight, that beam would cover the full sky in six months. In the next six months, it would cover the same sky, but with the opposite sense of rotation on a given great circle. However, since the spin axis is steered in a cycloid, the telescope is 85° to the spin axis, the focal plane is several degrees wide, and the Earth’s orbit is slightly elliptical, the symmetry of the scanning is (slightly) broken. Thus the Planck beams scan the entire sky exactly twice in one year, but scan only 93% of the sky in six months.


Routine operations[edit]

Planck's orbit during routine operations traced a Lissajous path around the L2 point, as shown below.

Trajectory of Planck from launch until 13 January 2012, in Earth-centred rotating coordinates (X is in the Sun-Earth direction; Z points to the north ecliptic pole). Symbols indicate the start of routine operations (circle), the end of the nominal mission (triangle), and the end of HFI data acquisition (diamond). The orbital periodicity is 6 months. The distance from the Earth-Moon barycentre is shown in the bottom right panel, together with Survey boundaries.


Routine operations started on 12 August 2009. For convenience, we call an approximately six month period one “survey”, and use that term as an inexact shorthand for one coverage of the sky. Nine numbered “Surveys” are defined precisely in the Table below, which also shows the fraction of the sky covered by all frequencies. The fourth Survey was shortened somewhat so that the slightly different scanning strategy adopted for Surveys 5–8 (see below) could be started before the Crab nebula, an important polarization calibration source, was observed. The coverage of the fifth Survey is smaller than the others because several weeks of integration time were dedicated to “deep rings” (defined below) covering sources of special importance.

Definition of the Planck Surveys


The spin axis was commanded to follow the cycloidal path across the sky in step-wise displacements of 2′ (Fig. 4). To maintain a steady advance of the projected position of the spin axis along the ecliptic plane, the time interval between two manoeuvres varied between 2360 s and 3904 s. The fraction of time used by the manoeuvres themselves (typical duration of five minutes) varied between 6% and 12%, depending on the phase of the cycloid. The data taken during manoeuvres are not used in the analysis. Over the nominal mission, the total reduction of scientific data due to manoeuvres was 9.2%.

The path followed by the Planck spin axis was defined with respect to the Ecliptic plane. It corresponded to a motion in longitude which maintained an anti-Sun pointing (about one degree per day), to which was added a cycloidal motion (precession) of the spin axis around the anti-Sun position (fiducial point). The cycloidal path was defined by the functions

[math]\lambda = \theta \sin((-1)^n ω (t-t_0)+\phi) [/math]   (eq. 1),

[math]\beta = -\theta \cos((-1)^n ω(t-t_0) + \phi) [/math]   (eq. 2),

where λ is the angular distance from the fiducial point in Ecliptic longitude, β the angular distance from the fiducial point in Ecliptic latitude, θ the spin axis precession amplitude, ω the pulsation of the precession, φ its phase, n the parameter which controls the motion direction of the precession, t is the time, and t0 is the first time during the Planck survey at which the fiducial point crosses the Ecliptic longitude =0 line.


The reasons to decide to use such a precession of the spin axis are that: (a) an excursion of the spin axis from the anti-Sun direction is required to fully observe the whole sky (no excursion would leave a large area unobserved around the Ecliptic poles); (b) the precession motion keeps the Sun aspect angle constant during the whole survey, therefore minimizing the thermal constraint variations on the spacecraft.

The following precession parameters were chosen for the scanning strategy of Planck:

  • Amplitude θ = 7.5°. (this value is the lowest possible which allows the entire sky to be covered with all detectors).
  • n = 1 (anti-clockwise motion as seen from the Sun).
  • Pulsation ω = 2π / 6 months (a faster precession was considered, and has interesting advantages, but was not possible given the need to keep a 7.5° amplitude in order to cover the whole sky).
  • The phase of the precession was decided according to a set of criteria (in order of importance): (a) respecting the operational constraints; (b) allowing the largest possible angle between two scans on the Crab Nebula (a polarization calibrator); (c) avoiding null dipole amplitude for the whole mission; (d) optimizing the position of the planets in the beginning of the survey and with respect to the feasibility of their recovery; (e) placing the two “deep fields” where Galactic foregrounds are minimum; (f) allowing a reasonable survey margin (i.e. the time allowed to recover lost pointings if a problem occurs). The phase selected was 340° for Surveys 1 to 4, and 250° for Surveys 5 to 8. The cycloid phase was shifted by 90° for Surveys 5–8 to optimize the range of polarization angles on key sources in the combination of Surveys 1–8, thereby helping in the treatment of systematic effects and improving polarization calibration.

The scanning strategy for the second year of Routine Operations (i.e. Surveys 3 and 4) was exactly the same as for the first year, except that all pointings were shifted by 1 arcmin along the cross-scanning direction, in order to provide finer sky sampling for the highest frequency detectors when combining two years of observations.

Routine operations were significantly modified twice more:

  • The sorption cooler switchover from the nominal to the redundant unit took place on 11 August 2010, leading to an interruption of acquisition of useful scientific data for about two days (one for the operation itself, and one for re-tuning of the cooling chain).
  • The satellite’s rotation speed was increased to 1.4 rpm between 8 and 16 December 2011 for observations of Mars, to measure possible systematic effects on the scientific data linked to the spin rate.

Data were acquired in the normal way during the above two periods, but were not used in the generation of products.

The scientific lifetime of the HFI bolometers ended on 13 January 2012 when the supply of 3He needed to cool them to 0.1K ran out. LFI continued to operate and acquire scientific data until 3 October 2013. On 4 October 2013 Planck ended its routine operations, after executing its last observation of the Crab Nebula, and started its decommissioning activities. On 19 October 2013, the sorption cooler and the two instruments (LFI and HFI) were switched off. The final command to the Planck satellite was sent on 23 October 2013, marking the end of operations.

Add something regarding the final orbit.

Operations were extremely smooth throughout the mission. The total observation time lost due to a few anomalies is about 5 days, spread over the 15.5 months of the nominal mission.


The figure below shows the actual path of the spin axis of Planck during its entire lifetime.

Top two panels: path of the spin axis of Planck (in ecliptic longitude and latitude) over the period 12 August 2009 (91 days after launch) to 13 January 2012, the “0.1 K mission” period (Table 1). Bottom panel: evolution of the dwell time during the same period. Intervals of accelera- tion/deceleration (e.g., around observations of the Crab) are clearly visible as symmetric temporary increases and reductions of dwell time. Survey boundaries are indicated by vertical dashed lines in the upper plot. The change in cycloid phase is clearly visible at operational day (OD) 807. The disturbances around OD 950 are due to the “spin-up campaign”.

Sky coverage[edit]

As an example, the maps below exhibits the progress of sky coverage during the first months of survey (black colour = unobserved areas).


A dynamic visualization of sky coverage by the Planck scanning strategy can be found here and here.


As an additional example, the following figures illustrate the distribution of integration time over the sky for the nominal and “0.1-K” (i.e., until the 3He ran out, see Table) missions, for the 353-GHz frequency channel.

Integration time 353GHz nominalmission.pdf
Survey coverage for the nominal (top) and 0.1 K (bottom) missions (see Table). The colour scale represents total integration time (varying between 50 and 8000 s deg−2 ) for the 353-GHz channel. The maps are at Nside = 1024.

The total integration time after the end of HFI operations (January 2012) is shown in the following maps. Units are seconds per square degree, normalized to one detector, for all maps. The projection is full-sky Mollweide centred on the Galactic centre.

Special Observations[edit]

During routine scanning, the Planck instruments naturally observe objects of special interest for calibration. These include Mars, Jupiter, Saturn, Uranus, Neptune, and the Crab nebula. Different types of observations of these objects were performed, as summarised below.

  • Normal scans on solar system objects and the Crab nebula. The complete list of observing dates for these objects can be found in Planck Collaboration (2013).
  • “Deep rings”. These special scans are performed on observations of Jupiter and the Crab nebula from January 2012 onward. They comprise deeply and finely sampled (step size 0.′5) observations with the spin axis along the Ecliptic plane, lasting typically two to three weeks. Since the Crab is crucial for calibration of both instruments, the average longitudinal speed of the pointing steps was increased before scanning the Crab, to improve operational margins and ease recovery in case of problems.
  • “Drift scans”. These special observations are performed on Mars, making use of its proper motion. They allow finely-sampled measurements of the beams, particularly for HFI. The rarity of Mars observations during the mission gives them high priority.


Below is a list of these observations, with the deep rings (Jupiter and the Crab) and drift scans (Mars only) in boldface.

  • Crab: 16-22 September 2009
  • Mars: 17-29 October 2009
  • Jupiter: 25 October – 1 November 2009
  • Neptune: 1-8 November 2009
  • Uranus: 6-16 December 2009
  • Saturn: 2-8 January 2010
  • Crab: 6-12 March 2010
  • Mars: 9-18 April 2010
  • Neptune: 15-23 May 2010
  • Saturn: 13-22 June 2010
  • Uranus: 27 June – 5 July 2010
  • Jupiter: 1-9 July 2010
  • Crab: 15-21 September 2010
  • Neptune: 3-11 November 2010
  • Jupiter: 9-18 December 2010
  • Uranus: 12-21 December 2010
  • Saturn: 15-22 January 2011
  • Crab: 7-12 March 2011
  • Neptune: 18-26 May 2011
  • Saturn: 30 June - 9 July 2011
  • Uranus: 3-11 July 2011
  • Jupiter: 9-15 August 2011
  • Crab: 10-18 September 2011 (performed with the 250° phase cycloidal strategy)
  • Crab: 20-23 September 2011 (performed with the 340° phase cycloidal strategy)
  • Mars: 8-16 December 2011 ("drift scan", Mars allowed to move through the Planck focal plane via its proper motion)
  • Mars: 17-26 December 2011 (normal scanning)
  • Jupiter: 8-30 January 2012 (deep ring)
  • Crab: 26 February - 16 March 2012 (deep ring)
  • Jupiter: 1-14 September 2012 (deep ring)
  • Crab: 14 September - 1 October 2012 (deep ring)
  • Neptune: 19-27 November 2012
  • Uranus: 24-30 December 2012
  • Saturn: 30 January - 5 February 2013
  • Jupiter: February 2013 (deep ring)
  • Crab: Feb. 28th - March 15th, 2013 (deep ring)
  • Neptune: June 4th - June 12th, 2013
  • Uranus: July 9-16th, 2013
  • Saturn: July 20-26th, 2013
  • Crab: Sept. 10th - Oct. 3rd, 2013 (deep ring)

Note that on Sept. 14-16th, 2013, LFI also performed a special dipole calibration observation.

Unplanned events[edit]

The main unplanned events included the following.

  • Very minor deviations from the scanning law included occasional (on the average about once every two months) under-performance of the 1-N thrusters used for regular manoeuvres, which implied that the corresponding pointings were not at the intended locations. These deviations had typical amplitudes of 30 arcsec, and had no significant impact on the coverage map.
  • The thruster heaters were unintentionally turned off between 31 August and 16 September 2009 (the so-called “catbed” event).
  • An operator error in the upload of the on-board command timeline led to an interruption of the normal sequence of manoeuvres and therefore to Planck pointing to the same location on the sky for a period of 29 h between 20 and 21 November 2009 (“the day Planck stood still”). Observations of the nominal scanning pattern resumed on 22 November, and on 23 November a recovery operation was applied to survey the previously missed area. During the recovery period the duration of pointing was decreased to allow the nominal law to be caught up with. As a side effect, the RF transmitter was left on for longer than 24 h, which had a significant thermal impact on the warm part of the satellite.
  • As planned, the RF transmitter was initially turned on and off every day in synchrony with the daily visibility window, in order to reduce potential interference by the transmitter on the scientific data. The induced daily temperature variation had a measurable effect throughout the satellite. An important effect was on the temperature of the 4He-JT cooler compressors, which caused variations of the levels of the interference lines that they induce on the bolometer data (Planck HFI Core Team 2011a). Therefore the RF transmitter was left permanently on starting from 25 January 2010 (257 days after launch), which made a noticeable improvement on the daily temperature variations.
  • During the coverage period, the operational star tracker switched autonomously to the redundant unit on two occasions (11 January 2010 and 26 February 2010); the nominal star tracker was restored a short period later (3.37 and 12.75 h, respectively) by manual power-cycling. Although the science data taken during this period have normal quality, they have not been used, because the redundant star tracker’s performance is not fully characterized.

For more information, see [1]. For a complete list of operational events, including contigencies, see the POSH (Planck operational state history).


Satellite environment[edit]

The thermal and radiation environment of the satellite during the routine phase is illustrated in the figure below.

Thermal and radiation environment of Planck. Vertical lines indicate boundaries between Surveys. Top panel: cosmic ray flux as measured by the onboard SREM; its decrease over time is due to the corresponding increase in solar activity, indicated by the sunspot number5. Solar flares show up as spikes in the proton flux. Second and third panels: temperature variation at two representative locations in the room-temperature SVM, i.e., on one of the (HFI) helium tanks and on one of the LFI back-end modules (BEMs). The sine-wave modulation tracks the variation of distance from the Sun. Bottom panel: temperature evolution of VG3, the coldest of three V-grooves, to which the sorption cooler is heat-sunk. The disturbances on the curve are due to adjustments of the operational parameters of this cooler.
A zoom of a seven-day period on the temperature of the Helium tank is shown before (top panel) and after (middle panel) the RF transponder was left permanently on, and illustrates the reduction in the daily temperature variations achieved by this operation. Smaller variations remain, due to thermal cycling of other elements (in this case the LFI Data Processing Unit), and are clearly visible in the middle panel. The bottom panel shows the typical effecto of weekly updates of the operational parameters of the Sorption Cooler (marked as vertical lines) on the temperature of the third V-groove.


The dominant long-timescale thermal modulation is driven by variations in Solar power absorbed by the satellite in its elliptical orbit around Sun. The thermal environment is sensitive to various satellite operations. For example, before day 257, the communications trans- mitter was turned on only during the daily data transmission period, causing a daily temperature variation clearly visible at all locations in the Service Module (Fig. 6). Some operational events4 had a significant thermal impact as shown in the above figure and detailed in Planck Collaboration (2013): Most notably: a) the “catbed” event between 110 and 126 days after launch; b) the “day Planck stood still” 191 days after launch; c) the sorption cooler switchover (OD 460); d) the change in the thermal control loop (OD 540) of the LFI radiometer electronics assembly box; and e) the spin-up campaign around OD 950.


The sorption cooler dissipates a large amount of power and drives temperature variations at multiple levels in the satellite. The bottom panel of the above figure shows the temperature evolution of the coldest of the three stacked conical structures or V-grooves that thermally isolate the warm service module (SVM) from the cold payload module. Most variations of this structure are due to quasi-weekly power input adjustments of the sorption cooler, whose tube-in-tube heat-exchanger supplying high pressure gas to the 20K Joule-Thomson valve and returning low pressure gas to the compressor assembly is heat-sunk to it. Many adjustments are seen in the roughly three months leading up to switchover. After switchover to the redundant cooler , thermal instabilities were present in the newly operating sorption cooler, which required frequent adjustment, until they reduced significantly around day 750.

The figure also shows the radiation environment history. As Planck started operations, Solar activity was extremely low, and Galactic cosmic rays (which produce sharp “glitches” in the HFI bolometer signals) were more easily able to enter the heliosphere and hit the satellite. As Solar activity increased the cosmic ray flux measured by the onboard standard radiation environment monitor (SREM; Planck Collaboration 2013) decreased correspondingly, but Solar flares increased.

Satellite pointing performance[edit]

Redundant star trackers on board Planck (co-aligned within 0.2° with the instrument field-of-view) provide absolute attitude mea- surements at a frequency of 8 Hz. These measurements are used by the attitude control computer on board Planck to execute the commanded reorientations of the satellite. The star-tracker data were further reprocessed daily on the ground, to provide the following.

  • Filtered attitude information at afrequency of 4Hz during the stable observation periods. The filtering algorithm basically suppresses high-frequency components of the measurement noise (i.e., at frequencies well above the nutation frequency);
  • Reconstructed attitude parameters averaged over each spin period (60 s) and each stable observation period (or dwell, typically of 50 min length).

The result was a daily attitude history file (AHF), which contained the filtered attitude of the three coordinate axes based on the star trackers every 0.125 s during stable observations (“rings”) and every 0.25 s during re-orientation slews. The production of the AHF was the first step in the determination of the pointing of each detector on the sky. The attitude data during the periods that the satellite is slewing are not filtered on the ground and are therefore much noisier.


The AHF was used by the data processing centres to estimate the location of each detector beam with respect to the satellite reference frame, based mainly on observations of planets (as described in Planck HFI Core Team 2011a).


Planck rotates about its principal axis of inertia at 1 rpm, with a precision of ±0.1% (see the figure).

The top panel shows the measured spin rate over the coverage period, which is always within ±0.1% of 1 rpm. The spin rate typically adopts one of three values as can be seen in the middle panel, which is a zoom into a period of several days. In the bottom panel we show the typical drift of the spin rate within a dwell, due to small residual torques applied to the satellite.

The observed variation of the spin rate was very systematic due to the following operational features.

  • The thruster used for a manoeuvre is selected depending on whether the spin rate preceding the manoeuvre is below or above its nominal value. Each thruster has a slightly different “minimum thrust level”, which determines the spin rate actually achieved. Therefore, the spin rate after each manoeuvre will toggle between two different spin rate states which bound the nominal value. If one of these states is very close to the nominal value, drift during the dwell period (see next item) could cause it to change from one side to the other of the nominal value, and thus to toggle on the next manoeuvre to a “third” spin rate state.
  • Within a dwell period, the spin rate drifts slightly (typically 10−6 deg s−1 per minute) due to residual torques on the satellite, caused by solar radiation pressure and exhaust of helium from the dilution cooler system.


The principal axis of inertia, about which Planck rotates, is off- set from the geometric axis by ∼28.6′ (see the figure). The time evolution of the measured offset angle shows a long-timescale variation which is clearly linked to the seasonal power input vari- ations on the solar array; this effect is not a real variation of the offset angle but is instead due to a thermoelastic deformation of the SVM panel that holds the star trackers (However, it appears as real in the filtered attitude). Other thermoelastic deformations that give rise to similar effects are related to specific operations which have a thermal impact (see Fig. 10). The dominant (false) offset angle variation before 25 January 2010 is due to the daily thermal impact of the RF transponder being switched on and off, and after that date it is related to thermal control cycles in electronic units located near the star trackers; the peak-to-peak amplitude of the effect is of order 0.15′ before and 0.08′ after 25 January. These effects can be correlated to the temperature of the units responsible. They easily mask the real variation of the offset angle, which is due to gradual depletion of the fuel and helium tanks, and is of order 2.5′′ per month (The variation is approximately 5′ per 50 kg of fuel expended. About 170 g month−1 are expended in scanning manoeuvres and about 50 g in each orbital maintenance manoeuvre, currently performed once every 8 weeks. Approximately 215 g month−1 of helium are vented to space by the HFI dilution cooler.) . This real variation of the wobble causes a corresponding change over time of the radius of the circle which each detector traces on the sky.

Top: evolution of the measured offset between the principal axis of inertia and the geometric axis of the satellite (one point is plotted for each dwell period of approximately 50 min). The time variations observed are not real changes in the offset angle, but are instead due to thermoelastic deformations in the panel that supports the star trackers. Bottom: zooming in on short periods of time before (left) and after (right) the RF transponder was turned permanently on, reveals periodic variations (before, dominated by the daily RF On-Off switching; after, dominated by thermal control cycling of nearby units with typically one hour periodicity).

As described in Tauber et al. (2010a), Planck’s spin axis is displaced by 2′ approximately every 50 min. A typical sequence of manoeuvres and dwells is illustrated below.

Left panels: motion of the spin axis (i.e., the direction of the principal axis of inertia) in latitude (top) and longitude (bottom) as a function of time, over a typical period of 70 min, including two manoeuvres clearly identified by the large excursions in latitude and longitude. The dwell periods show the much smaller amplitude motions due to nutation and drift arising from solar radiation pressure. Top right: motion of the spin axis in Galactic latitude and longitude for a sequence of three manoeuvres and dwells. The attitude measurements during the slew are not filtered and are therefore very noisy; the measurements during each dwell are strongly clustered and show up as dense spots. Bottom right: zoom on a portion (about 30 min) of a dwell showing clearly the periodic motions which are a combination of the drift and residual nutation (period around 5.4 min).

Each manoeuvre is carried out as a sequence of three thrusts spaced over three minutes (1st impulse – two minutes wait – 2nd impulse – one minute wait – 3rd impulse), designed to cancel nutation as much as possible. Each manoeuvre lasts an average of about 220 s, as defined by on-board software mode transitions9, which are used on the ground to trigger the end and start times of attitude filtering.

The pointing achieved after each reorientation is of course not exactly the commanded one; the difference, which varies between 2 and 8′′ during the coverage period, is shown in Fig. 12.

The plot shows the difference between the achieved and com- manded pointing after each 2′ manoeuvre; the difference is correlated with the duration of the previous dwell (see text). The vertical lines correspond to the very few occasions when the manoeuvre sequence did not execute as planned, resulting in anomalously high pointing errors.

This variation is systematically related to the duration of the dwell preceding the manoeuvre, since the preceding pointing drifts due to solar radiation pressure, and the angular amplitude of the following manoeuvre changes correspondingly. The thrust sequence required for each manoeuvre is computed on-board based on the known mass properties of the satellite and known thruster response functions; the error made on each manoeuvre is mainly driven by the (imperfect) on-board knowledge of these properties, and therefore depends systematically on the amplitude of the manoeuvre. On very few occasions (visible in Fig. 12), the thruster sequence performance did not execute as planned, and resulted in a much larger manoeuvre error.

Although the thruster sequence is designed to damp nutation, it does not do so perfectly. The peak amplitude of the residual nutation is typically 3′′ and does not vary significantly in time (see Fig. 13).


The peak amplitude of the residual nutation averaged within each dwell time, over the coverage period.

The period of the nutation is 5.425 ± 0.010 min, determined by the inertial properties of the satellite. Neither the amplitude nor the period of the nutation are observed to drift during a dwell period.

The last major characteristic of pointing within dwells is the drift due to solar radiation pressure. The total amplitude of the drift within each dwell varies between 5 and 12′′, depending on the duration of each dwell (see Fig. 14). The rate of drift varies between 4 and 10′′ h−1, weakly correlated with the Solar Aspect Angle (which varies by very small amounts throughout the mission).

The total drift due to solar radiation pressure within each dwell, which depends on the time length of the dwell (see Fig. 3). The drift rate (shown in the lower panel) is approximately constant at approximately 9′′ h−1 .

The pointing characteristics at AHF level are summarized in the table below.

Pointing performance over the nominal mission

A detailed description of the AHF algorithm and its performance in flight can be found in Tuttlebee & Gienger 2012[2].


Improvements on the AHF[edit]

Early on it was realized that there were some problems with the pointing solutions. First, the attitude determination during slews was poorer than during periods of stable pointing. Second, the solutions were affected by thermoelastic deformations in the satellite driven by temperature variations resulting from imperfect thermal control loops, the sorption cooler, and the thermally- driven transfer of helium from one tank to another.

A significant effort was made to improve ground processing capability to address the above issues. As a result, three different versions of the attitude history were produced for the whole mission:

  • the AHF, based on an optimized version of the initial (pre-launch) algorithm;
  • the Gyro-based attitude history hile (GHF), based on an algorithm that uses, in addition to the star tracker data, angular rate measurements derived from the on-board fibre-optic gyro (note that it was not initially planned to use its data for computation of the attitude over the whole mission)
  • the Dynamical attitude history file (DHF), based on an algorithm that uses the star tracker data in conjunction with a dynamical model of the satellite, and which accounts for the existence of disturbances at known sorption cooler operation frequencies.

Both the GHF and DHF algorithms significantly improve the recovery of attitude during slews. Due to the deadlines involved, the optimised AHF algorithm has been used in the production of the Planck products. Use the improved algorithms could enable the use of the scientific data acquired during slews (9.2% of the total).

Tuttlebee & Gienger 2012[2] also includes an analysis of the performance of GHF and DHF.

References[edit]

  1. Planck early results. I. The Planck mission, Planck Collaboration I, A&A, 536, A1, (2011).
  2. 2.02.1 Planck On-Ground Attitude Estimation Algorithms, Tuttlebee, M., & Gienger, G. 2012

revolutions per minute

(Planck) High Frequency Instrument

(Planck) Low Frequency Instrument

Operation Day definition is geometric visibility driven as it runs from the start of a DTCP (satellite Acquisition Of Signal) to the start of the next DTCP. Given the different ground stations and spacecraft will takes which station for how long, the OD duration varies but it is basically once a day.

Space Radiation Environment Monitor

Service Module

Attitude History File