HFI operations
The following list (version 11/09/2012) gives some known events and activities that have affected or might have affected the HFI data.
The time information is the start time of the event in On Board Time.
14/05/2009 13:12:00 launch 15/05/2009 19:17:06 slew: OCM LEOP (MAN-01a) 02/06/2009 16:48:36 Change of REU mode (STANDBY to CONFIGURATION) 02/06/2009 17:24:19 Change of REU mode (STANDBY to CONFIGURATION) 04/06/2009 11:32:00 SCS switched ON 05/06/2009 17:28:18 slew: OCM-z (MAN-02a) 09/06/2009 22:28:02 HFI Single Event Upset 17/06/2009 16:46:58 slew: OCM-z touch-up (MAN-02b) 02/07/2009 11:15:46 slew: OCM Insertion (MAN-03a) 02/07/2009 13:52:08 Change of REU mode (OPTIM) 03/07/2009 11:55:57 Change of REU mode (OPTIM) 03/07/2009 12:56:43 Change of REU mode (OPTIM) 03/07/2009 22:00:02 test: pre-RAW72 03/07/2009 23:13:02 Change of REU mode (RAW72) 04/07/2009 02:00:00 aphelion 04/07/2009 22:30:02 Change of REU mode (COMPRESSION-VALIDATION) 04/07/2009 23:05:10 Change of REU mode (COMPRESSION-VALIDATION) 04/07/2009 23:40:18 Change of REU mode (COMPRESSION-VALIDATION) 05/07/2009 00:10:20 Change of REU mode (COMPRESSION-VALIDATION) 05/07/2009 00:15:27 Change of REU mode (COMPRESSION-VALIDATION) 05/07/2009 00:45:26 Change of REU mode (COMPRESSION-VALIDATION) 05/07/2009 00:50:35 Change of REU mode (COMPRESSION-VALIDATION) 05/07/2009 01:25:43 Change of REU mode (COMPRESSION-VALIDATION) 10/07/2009 00:00:00 2100009:Start of CPV phase [21|00000001] 12/07/2009 00:34:38 HFI Single Event Upset 12/07/2009 01:00:02 test: RAW72 12/07/2009 07:00:04 test: end of RAW72 12/07/2009 11:53:20 DPU is rebooted 15/07/2009 09:16:02 slew: OCM Insertion touch-up (MAN-03b) 27/07/2009 01:56:42 HFI Single Event Upset 05/08/2009 10:36:27 HFI save REU then DPU final configuration 06/08/2009 17:31:31 4K CRU anomalous shutdown 09/08/2009 03:58:53 star tracker switchover #1 12/08/2009 13:24:59 Change of REU mode (OPTIM) 12/08/2009 14:13:45 DPC survey#1 (ring#240) 14/08/2009 12:30:10 slew: orbit maintenance manoeuvre #1 18/08/2009 11:43:42 long ring #440 for CDMU patch 18/08/2009 12:39:09 sat: CDMU patch (day 1) 18/08/2009 12:39:20 sat: CDMU patch (end of day 1) 19/08/2009 11:49:40 long ring #474 for CDMU patch 19/08/2009 12:45:31 sat: CDMU patch (day 2) 19/08/2009 12:45:34 sat: CDMU patch (end of day 2) 20/08/2009 11:53:46 long ring #509 for CDMU patch 20/08/2009 12:45:32 sat: CDMU patch (day 3) 20/08/2009 12:45:36 sat: CDMU patch (end of day 3) 21/08/2009 11:56:03 long ring #544 for CDMU patch 21/08/2009 14:18:48 HFI clock resynchronisation 22/08/2009 09:36:51 dtcp: transition to 3 h DTCP duration 31/08/2009 12:09:14 long ring #897 to allow the execution of the ACMS warm reset 31/08/2009 13:40:00 thrusters catbed heaters are switched off by error 31/08/2009 13:40:01 sat: FOG telemetry is disabled by error 31/08/2009 13:41:05 long ring #898 to allow the execution of the ACMS warm reset 04/09/2009 15:01:00 thurster under/over performed 11/09/2009 21:00:41 slew: orbit maintenance manoeuvre #2 16/09/2009 13:40:00 1700000:Temporary increase of the HFI TM band...[17|00000010] 16/09/2009 20:31:41 thrusters catbed heaters are switched back on 18/09/2009 19:06:15 planet: HFI Crab scan#1 20/09/2009 00:00:00 1200000:SCS unexpected compressor temperature [12|00000100] 20/09/2009 19:36:00 dtcp: extra pass CEB 09/10/2009 09:00:00 1200001:SCS T rises on sensors on VG3 pre-coo...[12|00000100] 20/10/2009 23:44:24 therm: HFI elephant LONG deltaT>10uK 22/10/2009 19:34:56 planet: HFI Mars scan#1 24/10/2009 11:01:39 therm: HFI elephant LONG deltaT>10uK 25/10/2009 10:30:00 1200002:SCS T rises on sensors on VG3 pre-coo...[12|00000100] 25/10/2009 15:30:49 planet: HFI Jupiter scan#1 28/10/2009 23:06:00 thurster under/over performed 01/11/2009 00:41:04 planet: HFI Neptune scan# 1 20/11/2009 18:52:25 long ring #3589 (29 hours) : no slew due to MTL uplink problem 21/11/2009 23:39:54 slew : resumption of SL after the MTL problem 22/11/2009 19:48:41 slew to SGR position 23/11/2009 08:47:54 slew to catchup 23/11/2009 19:48:10 SGR (end): back to nominal scanning law 25/11/2009 05:56:00 HFI 1.6K stage event 26/11/2009 14:32:00 thurster under/over performed 04/12/2009 17:49:29 slew: orbit maintenance manoeuvre #3 05/12/2009 09:43:53 planet: HFI Uranus scan# 1 16/12/2009 20:42:11 sat: FOG telemetry is enabled back 21/12/2009 19:59:54 HFI compression settings change 22/12/2009 11:46:18 dtcp: extra pass 03/01/2010 00:00:00 perihelia 04/01/2010 00:25:49 planet: HFI Saturn scan#1 11/01/2010 19:16:32 star tracker switchover #2 15/01/2010 21:57:45 slew: orbit maintenance manoeuvre #4 25/01/2010 21:16:41 sat: transponder always on 08/02/2010 20:51:32 DPC survey#2 (ring#5721) 26/02/2010 12:43:37 star tracker switchover #3 26/02/2010 23:02:49 slew: orbit maintenance manoeuvre #5 06/03/2010 05:04:43 planet: HFI Crab scan#2 01/04/2010 06:41:00 thurster under/over performed 02/04/2010 13:48:21 therm: major elephant 05/04/2010 10:00:00 solar flare: geomagnetic storm 10/04/2010 10:36:35 planet: HFI Mars scan#2 26/04/2010 17:55:37 slew: orbit maintenance manoeuvre #6 29/04/2010 17:34:58 SCS TSA setpoint increase 06/05/2010 17:02:08 SCS TSA setpoint increase 13/05/2010 16:30:13 SCS TSA setpoint increase 17/05/2010 17:51:09 planet: HFI Neptune scan# 2 26/05/2010 16:06:43 2900042:SCS cycletime change (P-ICR-0067) [29|00100000] 28/05/2010 15:48:09 2900043:SCS cycletime and heatup power update...[29|01100000] 01/06/2010 15:52:04 2900044:SCS gas-gap ON delay times change (P-...[29|00000010] 12/06/2010 01:00:00 solar flare 12/06/2010 01:57:16 planet: HFI Saturn scan#2 24/06/2010 18:31:09 SCS TSA setpoint increase 30/06/2010 19:00:53 planet: HFI Uranus scan#2 03/07/2010 20:01:43 planet: HFI Jupiter scan#2 06/07/2010 11:00:00 aphelion 14/07/2010 20:45:50 dtcp: extra pass 15/07/2010 18:13:43 SCS TSA setpoint increase 18/07/2010 04:28:00 thurster under/over performed 21/07/2010 21:08:44 planet: moon transit 22/07/2010 00:42:59 planet: moon transit (end) 24/07/2010 16:36:11 therm: HFI elephant LONG deltaT>10uK 29/07/2010 17:45:52 SCS TSA setpoint increase 03/08/2010 19:00:00 solar flare: possible geomagnetic storm 06/08/2010 17:55:23 2900056:Bed2 removal from SCS cycle [29|00001000] 10/08/2010 23:16:00 2900057:Disable FM2 TSA [29|00001000] 11/08/2010 10:14:37 long ring #11149 for SCS switchover 11/08/2010 11:00:00 SCS switchover 11/08/2010 21:34:10 dtcp: extra pass CEB 12/08/2010 00:07:00 1700006:Adjustment of 4K PID Margin [17|00000010] 12/08/2010 17:22:00 2900059:Enable FM1 TSA [29|00001000] 12/08/2010 19:27:28 DPC survey#3 (ring#11195) 13/08/2010 18:00:00 2900060:Temporary raising of TSA set-point on...[29|00001001] 13/08/2010 23:59:21 slew to interleaved pointings for survey#3 14/08/2010 11:00:00 solar flare 16/08/2010 18:00:09 slew: orbit maintenance manoeuvre #7 18/08/2010 08:35:00 solar flare 24/08/2010 18:00:00 2800003:Update of spacecraft mass properties [28|00000000] 18/09/2010 18:28:04 planet: HFI Crab scan#3 04/10/2010 04:25:00 HFI 1.6K stage event 04/10/2010 04:57:05 therm: HFI elephant SHORT deltaT>10uK 06/10/2010 13:25:00 2900071:WR test for LFI temperature fluctuations[29|00001000] 06/10/2010 19:00:46 dtcp: extra pass CEB 07/10/2010 13:10:00 2900072:WR temperature control reset to nominal [29|00001000] 11/10/2010 13:26:47 long ring #13333: manoeuvre failed 27/10/2010 23:06:00 1300032:Incorrect Pointing coordinates for po...[13|00000000] 03/11/2010 08:11:34 planet: HFI Neptune scan#3 04/11/2010 13:20:14 therm: change of the DPU2 thermal control 04/11/2010 19:19:00 dtcp: extra pass NNO 11/11/2010 12:45:00 SCS TSA setpoint increase 21/11/2010 03:02:51 therm: HFI elephant LONG deltaT>10uK 24/11/2010 11:23:01 long ring #14627 for star tracker tests 24/11/2010 12:29:29 star tracker switchover for intercalibration test (STR1->STR2) 24/11/2010 20:23:53 slew back 25/11/2010 17:02:45 long ring #14653 for star tracker tests 25/11/2010 17:59:37 star tracker switchover STR2->STR1 26/11/2010 01:55:21 slew back to nominal scanning strategy 27/11/2010 20:20:00 solar flare 02/12/2010 13:21:13 slew: orbit maintenance manoeuvre #8 06/12/2010 20:38:00 planet: HFI Jupiter scan#3 10/12/2010 14:55:44 planet: HFI Uranus scan#3 15/12/2010 08:19:00 thurster under/over performed 15/12/2010 10:30:00 thurster under/over performed 22/12/2010 16:33:14 HFI Single Event Upset 23/12/2010 15:44:53 SCS TSA setpoint increase 03/01/2011 19:00:00 perihelia 18/01/2011 05:25:24 planet: HFI Saturn scan#3 24/01/2011 13:20:09 SCS warm radiator warming 24/01/2011 17:28:00 dtcp: extra pass CEB 28/01/2011 02:00:00 solar flare 31/01/2011 14:06:49 slew: orbit maintenance manoeuvre #9 01/02/2011 13:31:33 SCS TSA setpoint increase 08/02/2011 20:55:48 DPC survey#4 (ring#16692) 10/02/2011 02:48:02 HFI 1.6K stage event 15/02/2011 06:00:00 solar flare: X ray solar flare 18/02/2011 00:00:00 solar flare: X ray solar flare 24/02/2011 14:05:28 SCS TSA setpoint increase 28/02/2011 23:20:41 slew: acceleration for Crab scan 06/03/2011 04:12:44 planet: HFI Crab scan#4 07/03/2011 21:00:00 solar flare: coronal mass ejection 10/03/2011 19:44:00 dtcp: extra pass CEB 15/03/2011 17:42:31 SCS desorption power gap jump 15/03/2011 20:35:00 dtcp: extra pass 18/03/2011 15:15:00 dtcp: long pass (5h30mn) 21/03/2011 03:30:00 solar flare: radiation event 21/03/2011 21:10:17 slew: orbit maintenance manoeuvre #10 31/03/2011 21:02:52 SCS TSA setpoint increase 07/04/2011 20:38:16 SCS TSA setpoint increase 14/04/2011 21:03:33 SCS TSA setpoint increase 21/04/2011 20:33:20 SCS TSA setpoint increase 10/05/2011 16:48:13 SCS TSA setpoint decrease 19/05/2011 10:13:28 2900098:FM1 Powers and Times change [29|10000000] 20/05/2011 14:18:21 planet: HFI Neptune scan#4 04/06/2011 22:00:00 solar flare: geomagnetic storm 07/06/2011 07:00:00 solar flare: solar proton enhancement 23/06/2011 04:55:03 thurster under/over performed 29/06/2011 17:03:39 planet: HFI Saturn scan#4 04/07/2011 15:00:00 aphelion 05/07/2011 22:00:17 planet: HFI Uranus scan#4 25/07/2011 17:38:00 slew: orbit maintenance manoeuvre #11 27/07/2011 16:51:00 on board mass properties update 29/07/2011 17:13:00 slew to survey#5 29/07/2011 17:43:32 DPC survey#5 (ring#21721) 02/08/2011 07:00:00 solar flare: M1 class 03/08/2011 21:09:40 planet: HFI Jupiter scan#4 04/08/2011 04:30:00 solar flare 04/08/2011 15:55:38 SCS TSA setpoint increase 08/08/2011 16:53:00 SGR: scanning law is interrupted 08/08/2011 17:32:00 slew back 08/08/2011 18:00:00 solar flare: X7 class 08/08/2011 18:44:00 planet: HFI Jupiter scan#4 (bis) 09/08/2011 01:54:00 slew to the catchup position 09/08/2011 08:00:00 solar flare 09/08/2011 17:23:00 SGR (end): back to nominal scanning law 06/09/2011 02:20:00 solar flare: M5.3 06/09/2011 23:00:00 solar flare: X2.1 13/09/2011 09:34:22 planet: HFI Crab scan#5 17/09/2011 08:00:00 solar flare: magnetic storm 20/09/2011 09:43:00 slew setting-up the second crab scan 20/09/2011 10:41:38 planet: HFI Crab scan#5 (bis) 21/09/2011 16:43:41 planet: HFI Crab scan#6 21/09/2011 18:33:00 dtcp: extra pass 22/09/2011 12:00:00 solar flare: complexe event 24/09/2011 00:42:34 slew back to survey 5 scanning strategy 26/09/2011 12:29:45 slew : station keeping manoeuvre half failed 04/10/2011 12:35:07 slew: orbit maintenance manoeuvre #12 bis 11/10/2011 12:35:13 test: Temperature steps on bolometer PID 12/10/2011 10:30:00 test: EOL-Fast IV at 100mK 22/10/2011 14:00:00 solar flare: small event 27/10/2011 12:38:38 SCS TSA setpoint increase 04/11/2011 00:00:00 solar flare: X2 class 07/11/2011 09:00:00 test : pre-EOL-LFER-1 (I_Bias steps) 08/11/2011 10:42:00 test: EOL-IBTU (slow VI) 14/11/2011 09:00:00 test: 2nd pre-EOL-LFER-1 (I_Bias steps) 14/11/2011 23:58:33 slew: beginning of dwell duration compression phase 18/11/2011 00:00:00 test: EOL-LFER-1 (I_Bias steps) 26/11/2011 07:00:00 solar flare: Radiation storm and Coronal Mass Ejection 28/11/2011 17:10:00 dtcp: extra pass 07/12/2011 17:00:00 test: spinup test 08/12/2011 10:00:00 planet: HFI Mars scan @ 1.4 RPM 09/12/2011 16:43:00 star tracker unhealthy 16/12/2011 18:35:00 slew: back to scanning law 17/12/2011 18:00:00 planet: HFI Mars scan#3 23/12/2011 15:10:06 He3 flow rate 0 -> 1 25/12/2011 14:45:16 test: Add 153.4 uW on the 1.6K stage redundant PID 25/12/2011 20:00:00 solar flare: C-class 27/12/2011 11:42:10 test: Temperature steps on the bolometer plate II 29/12/2011 14:24:29 He3 flow rate 1 -> 2 02/01/2012 13:58:00 He3 flow rate 2 -> 3 03/01/2012 14:20:19 test: Temperature steps on bolo plate III 04/01/2012 13:52:00 He3 flow rate 3 -> 4 07/01/2012 14:10:00 He3 flow rate 4 -> 5 08/01/2012 07:20:00 slew to Jupiter deep annuli scan 09/01/2012 14:23:00 He3 flow rate 5 -> 6 10/01/2012 04:20:00 planet: HFI Jupiter scan 11/01/2012 14:47:00 He3 flow rate 6 -> 7 14/01/2012 16:00:00 END OF NOMINAL OPERATIONS 15/01/2012 14:05:00 test: optimisation 16/01/2012 15:00:21 test: bolo plate ->110mK 16/01/2012 15:45:09 test: bolo plate ->300mK 18/01/2012 15:20:10 test: Adjust compression 18/01/2012 16:15:11 test: EOL-Fast IV at 300 mK 20/01/2012 19:58:08 test: EOL-RAW54 at 300mK 22/01/2012 00:18:00 therm: loss of satellite thermal control 22/01/2012 15:00:00 CDMU PM-A reset 22/01/2012 22:59:58 DPU is rebooted 23/01/2012 05:00:00 solar flare: major one 25/01/2012 14:45:00 test: Adjust compression 27/01/2012 19:00:00 solar flare 30/01/2012 21:53:00 slew to survey#6 06/02/2012 14:00:00 test: optimisation 07/02/2012 00:00:00 slew: large orbit correction manœuvre 10/02/2012 16:30:00 test: EOL-Fast IV at 600 mK 14/02/2012 14:20:00 CDMU PM-A switch over 20/02/2012 10:00:00 test: Adjust compression 20/02/2012 14:57:00 slew: touchup manœuvre 21/02/2012 15:00:00 test: Adjust compression 21/02/2012 15:16:00 test: Adjust compression 22/02/2012 16:50:00 test: Adjust compression 23/02/2012 15:20:00 test: Adjust compression
(Planck) High Frequency Instrument
Launch & Early Orbit Phase
Readout Electronic Unit
Sorption Cooler Subsystem (Planck)
Calibration and Performance Verification
Data Processing Unit
Data Processing Center
Command and Data Management Unit
Daily Tele-Communication Period
Attitude Control & Measurement Subsystem (AOCS)
Fiber Optic Gyroscope
Small Gap Recovery
hermal Stabilization Assembly
(Planck) Low Frequency Instrument
sudden change of the baseline level inside a ring
End Of Life
low frequency excess response