Difference between revisions of "HFI operations"

From Planck PLA 2015 Wiki
Jump to: navigation, search
Line 1: Line 1:
 
The following list (version 11/09/2012) gives some known events and activities that have affected or might have affected the HFI data. The time information is the start time of the event in On Board Time. The label contains few keywords:
 
The following list (version 11/09/2012) gives some known events and activities that have affected or might have affected the HFI data. The time information is the start time of the event in On Board Time. The label contains few keywords:
  
 +
* '''dtcp''' : (for Daily Tele-Communication Period) refers to extended pass
 
* '''solar flare''' : refers to all solar events as detected by a thermal fluctuation on the HFI bolometer plate
 
* '''solar flare''' : refers to all solar events as detected by a thermal fluctuation on the HFI bolometer plate
 
* '''HFI''' : refer to HFI instrument operations (when during the Commissioning of the Calibration and Performance Verification phases, labels are usually followed bu the activity label)
 
* '''HFI''' : refer to HFI instrument operations (when during the Commissioning of the Calibration and Performance Verification phases, labels are usually followed bu the activity label)

Revision as of 12:44, 9 January 2013

The following list (version 11/09/2012) gives some known events and activities that have affected or might have affected the HFI data. The time information is the start time of the event in On Board Time. The label contains few keywords:

  • dtcp : (for Daily Tele-Communication Period) refers to extended pass
  • solar flare : refers to all solar events as detected by a thermal fluctuation on the HFI bolometer plate
  • HFI : refer to HFI instrument operations (when during the Commissioning of the Calibration and Performance Verification phases, labels are usually followed bu the activity label)
  • test : refers to End Of Life tests executed on the HFI
  • therm : refers to satellite events that might have a thermal impact on the HFI
  • slew : refers to thruster activity


14/05/2009 13:12:00	launch
15/05/2009 19:17:06	slew: OCM LEOP (MAN-01a)
02/06/2009 16:48:36	Change of REU mode (STANDBY to CONFIGURATION) 
02/06/2009 17:24:19	Change of REU mode (STANDBY to CONFIGURATION) 
04/06/2009 11:32:00	SCS switched ON
05/06/2009 17:28:18	slew: OCM-z (MAN-02a)
09/06/2009 22:28:02	HFI Single Event Upset
17/06/2009 16:46:58	slew: OCM-z touch-up (MAN-02b)
02/07/2009 11:15:46	slew: OCM Insertion (MAN-03a)
02/07/2009 13:52:08	Change of REU mode (OPTIM)
03/07/2009 11:55:57	Change of REU mode (OPTIM)
03/07/2009 12:56:43	Change of REU mode (OPTIM)
03/07/2009 22:00:02	test: pre-RAW72
03/07/2009 23:13:02	Change of REU mode (RAW72)
04/07/2009 02:00:00	aphelion
04/07/2009 22:30:02	Change of REU mode (COMPRESSION-VALIDATION)
04/07/2009 23:05:10	Change of REU mode (COMPRESSION-VALIDATION)
04/07/2009 23:40:18	Change of REU mode (COMPRESSION-VALIDATION)
05/07/2009 00:10:20	Change of REU mode (COMPRESSION-VALIDATION)
05/07/2009 00:15:27	Change of REU mode (COMPRESSION-VALIDATION)
05/07/2009 00:45:26	Change of REU mode (COMPRESSION-VALIDATION)
05/07/2009 00:50:35	Change of REU mode (COMPRESSION-VALIDATION)
05/07/2009 01:25:43	Change of REU mode (COMPRESSION-VALIDATION)
10/07/2009 00:00:00	2100009:Start of CPV phase                      [21|00000001]
12/07/2009 00:34:38	HFI Single Event Upset
12/07/2009 01:00:02	test: RAW72
12/07/2009 07:00:04	test: end of RAW72
12/07/2009 11:53:20	DPU is rebooted
15/07/2009 09:16:02	slew: OCM Insertion touch-up (MAN-03b)
27/07/2009 01:56:42	HFI Single Event Upset
05/08/2009 10:36:27	HFI save REU then DPU final configuration     
06/08/2009 17:31:31	4K CRU anomalous shutdown
09/08/2009 03:58:53	star tracker switchover #1
12/08/2009 13:24:59	Change of REU mode (OPTIM)
12/08/2009 14:13:45	DPC survey#1 (ring#240)
14/08/2009 12:30:10	slew: orbit maintenance manoeuvre #1
18/08/2009 11:43:42	long ring #440 for CDMU patch
18/08/2009 12:39:09	sat: CDMU patch (day 1)
18/08/2009 12:39:20	sat: CDMU patch (end of day 1)
19/08/2009 11:49:40	long ring #474 for CDMU patch
19/08/2009 12:45:31	sat: CDMU patch (day 2)
19/08/2009 12:45:34	sat: CDMU patch (end of day 2)
20/08/2009 11:53:46	long ring #509 for CDMU patch
20/08/2009 12:45:32	sat: CDMU patch (day 3)
20/08/2009 12:45:36	sat: CDMU patch (end of day 3)
21/08/2009 11:56:03	long ring #544 for CDMU patch
21/08/2009 14:18:48	HFI clock resynchronisation
22/08/2009 09:36:51	dtcp: transition to 3 h DTCP duration
31/08/2009 12:09:14	long ring #897 to allow the execution of the ACMS warm reset
31/08/2009 13:40:00	thrusters catbed heaters are switched off by error
31/08/2009 13:40:01	sat: FOG telemetry is disabled by error
31/08/2009 13:41:05	long ring #898 to allow the execution of the ACMS warm reset
04/09/2009 15:01:00	thurster under/over performed
11/09/2009 21:00:41	slew: orbit maintenance manoeuvre #2
16/09/2009 13:40:00	1700000:Temporary increase of the HFI TM band...[17|00000010]
16/09/2009 20:31:41	thrusters catbed heaters are switched back on
18/09/2009 19:06:15	planet: HFI Crab scan#1
20/09/2009 00:00:00	1200000:SCS unexpected compressor temperature   [12|00000100]
20/09/2009 19:36:00	dtcp: extra pass CEB
09/10/2009 09:00:00	1200001:SCS T rises on sensors on VG3 pre-coo...[12|00000100]
20/10/2009 23:44:24	therm: HFI elephant LONG deltaT>10uK
22/10/2009 19:34:56	planet: HFI Mars scan#1
24/10/2009 11:01:39	therm: HFI elephant LONG deltaT>10uK
25/10/2009 10:30:00	1200002:SCS T rises on sensors on VG3 pre-coo...[12|00000100]
25/10/2009 15:30:49	planet: HFI Jupiter scan#1
28/10/2009 23:06:00	thurster under/over performed
01/11/2009 00:41:04	planet: HFI Neptune scan# 1
20/11/2009 18:52:25	long ring #3589 (29 hours) : no slew due to MTL uplink problem
21/11/2009 23:39:54	slew : resumption of SL after the MTL problem
22/11/2009 19:48:41	slew to SGR position
23/11/2009 08:47:54	slew to catchup
23/11/2009 19:48:10	SGR (end): back to nominal scanning law
25/11/2009 05:56:00	HFI 1.6K stage event
26/11/2009 14:32:00	thurster under/over performed
04/12/2009 17:49:29	slew: orbit maintenance manoeuvre #3
05/12/2009 09:43:53	planet: HFI Uranus scan# 1
16/12/2009 20:42:11	sat: FOG telemetry is enabled back
21/12/2009 19:59:54	HFI compression settings change
22/12/2009 11:46:18	dtcp: extra pass
03/01/2010 00:00:00	perihelia
04/01/2010 00:25:49	planet: HFI Saturn scan#1
11/01/2010 19:16:32	star tracker switchover #2
15/01/2010 21:57:45	slew: orbit maintenance manoeuvre #4
25/01/2010 21:16:41	sat: transponder always on
08/02/2010 20:51:32	DPC survey#2 (ring#5721)
26/02/2010 12:43:37	star tracker switchover #3
26/02/2010 23:02:49	slew: orbit maintenance manoeuvre #5
06/03/2010 05:04:43	planet: HFI Crab scan#2
01/04/2010 06:41:00	thurster under/over performed
02/04/2010 13:48:21	therm: major elephant
05/04/2010 10:00:00	solar flare: geomagnetic storm
10/04/2010 10:36:35	planet: HFI Mars scan#2
26/04/2010 17:55:37	slew: orbit maintenance manoeuvre #6
29/04/2010 17:34:58	SCS TSA setpoint increase
06/05/2010 17:02:08	SCS TSA setpoint increase
13/05/2010 16:30:13	SCS TSA setpoint increase
17/05/2010 17:51:09	planet: HFI Neptune scan# 2
26/05/2010 16:06:43	2900042:SCS cycletime change (P-ICR-0067)       [29|00100000]
28/05/2010 15:48:09	2900043:SCS cycletime and heatup power update...[29|01100000]
01/06/2010 15:52:04	2900044:SCS gas-gap ON delay times change (P-...[29|00000010]
12/06/2010 01:00:00	solar flare
12/06/2010 01:57:16	planet: HFI Saturn scan#2
24/06/2010 18:31:09	SCS TSA setpoint increase
30/06/2010 19:00:53	planet: HFI Uranus scan#2
03/07/2010 20:01:43	planet: HFI Jupiter scan#2
06/07/2010 11:00:00	aphelion
14/07/2010 20:45:50	dtcp: extra pass
15/07/2010 18:13:43	SCS TSA setpoint increase
18/07/2010 04:28:00	thurster under/over performed
21/07/2010 21:08:44	planet: moon transit
22/07/2010 00:42:59	planet: moon transit (end)
24/07/2010 16:36:11	therm: HFI elephant LONG deltaT>10uK
29/07/2010 17:45:52	SCS TSA setpoint increase
03/08/2010 19:00:00	solar flare: possible geomagnetic storm
06/08/2010 17:55:23	2900056:Bed2 removal from SCS cycle             [29|00001000]
10/08/2010 23:16:00	2900057:Disable FM2 TSA                         [29|00001000]
11/08/2010 10:14:37	long ring #11149 for SCS switchover
11/08/2010 11:00:00	SCS switchover
11/08/2010 21:34:10	dtcp: extra pass CEB
12/08/2010 00:07:00	1700006:Adjustment of 4K PID Margin             [17|00000010]
12/08/2010 17:22:00	2900059:Enable FM1 TSA                          [29|00001000]
12/08/2010 19:27:28	DPC survey#3 (ring#11195)
13/08/2010 18:00:00	2900060:Temporary raising of TSA set-point on...[29|00001001]
13/08/2010 23:59:21	slew to interleaved pointings for survey#3
14/08/2010 11:00:00	solar flare
16/08/2010 18:00:09	slew: orbit maintenance manoeuvre #7
18/08/2010 08:35:00	solar flare
24/08/2010 18:00:00	2800003:Update of spacecraft mass properties    [28|00000000]
18/09/2010 18:28:04	planet: HFI Crab scan#3
04/10/2010 04:25:00	HFI 1.6K stage event
04/10/2010 04:57:05	therm: HFI elephant SHORT deltaT>10uK
06/10/2010 13:25:00	2900071:WR test for LFI temperature fluctuations[29|00001000]
06/10/2010 19:00:46	dtcp: extra pass CEB
07/10/2010 13:10:00	2900072:WR temperature control reset to nominal [29|00001000]
11/10/2010 13:26:47	long ring  #13333: manoeuvre failed
27/10/2010 23:06:00	1300032:Incorrect Pointing coordinates for po...[13|00000000]
03/11/2010 08:11:34	planet: HFI Neptune scan#3
04/11/2010 13:20:14	therm: change of the DPU2 thermal control
04/11/2010 19:19:00	dtcp: extra pass NNO
11/11/2010 12:45:00	SCS TSA setpoint increase
21/11/2010 03:02:51	therm: HFI elephant LONG deltaT>10uK
24/11/2010 11:23:01	long ring  #14627 for star tracker tests
24/11/2010 12:29:29	star tracker switchover for intercalibration test (STR1->STR2)
24/11/2010 20:23:53	slew back
25/11/2010 17:02:45	long ring  #14653 for star tracker tests
25/11/2010 17:59:37	star tracker switchover STR2->STR1
26/11/2010 01:55:21	slew back to nominal scanning strategy
27/11/2010 20:20:00	solar flare
02/12/2010 13:21:13	slew: orbit maintenance manoeuvre #8
06/12/2010 20:38:00	planet: HFI Jupiter scan#3
10/12/2010 14:55:44	planet: HFI Uranus scan#3
15/12/2010 08:19:00	thurster under/over performed
15/12/2010 10:30:00	thurster under/over performed
22/12/2010 16:33:14	HFI Single Event Upset
23/12/2010 15:44:53	SCS TSA setpoint increase
03/01/2011 19:00:00	perihelia
18/01/2011 05:25:24	planet: HFI Saturn scan#3
24/01/2011 13:20:09	SCS warm radiator warming
24/01/2011 17:28:00	dtcp: extra pass CEB
28/01/2011 02:00:00	solar flare
31/01/2011 14:06:49	slew: orbit maintenance manoeuvre #9
01/02/2011 13:31:33	SCS TSA setpoint increase
08/02/2011 20:55:48	DPC survey#4 (ring#16692)
10/02/2011 02:48:02	HFI 1.6K stage event
15/02/2011 06:00:00	solar flare: X ray solar flare
18/02/2011 00:00:00	solar flare: X ray solar flare
24/02/2011 14:05:28	SCS TSA setpoint increase
28/02/2011 23:20:41	slew: acceleration for Crab scan
06/03/2011 04:12:44	planet: HFI Crab scan#4
07/03/2011 21:00:00	solar flare: coronal mass ejection
10/03/2011 19:44:00	dtcp: extra pass CEB
15/03/2011 17:42:31	SCS desorption power gap jump
15/03/2011 20:35:00	dtcp: extra pass
18/03/2011 15:15:00	dtcp: long pass (5h30mn)
21/03/2011 03:30:00	solar flare: radiation event
21/03/2011 21:10:17	slew: orbit maintenance manoeuvre #10
31/03/2011 21:02:52	SCS TSA setpoint increase
07/04/2011 20:38:16	SCS TSA setpoint increase
14/04/2011 21:03:33	SCS TSA setpoint increase
21/04/2011 20:33:20	SCS TSA setpoint increase
10/05/2011 16:48:13	SCS TSA setpoint decrease
19/05/2011 10:13:28	2900098:FM1 Powers and Times change             [29|10000000]
20/05/2011 14:18:21	planet: HFI Neptune scan#4
04/06/2011 22:00:00	solar flare: geomagnetic storm
07/06/2011 07:00:00	solar flare: solar proton enhancement
23/06/2011 04:55:03	thurster under/over performed
29/06/2011 17:03:39	planet: HFI Saturn scan#4
04/07/2011 15:00:00	aphelion
05/07/2011 22:00:17	planet: HFI Uranus scan#4
25/07/2011 17:38:00	slew: orbit maintenance manoeuvre #11
27/07/2011 16:51:00	on board mass properties update
29/07/2011 17:13:00	slew to survey#5
29/07/2011 17:43:32	DPC survey#5 (ring#21721)
02/08/2011 07:00:00	solar flare: M1 class
03/08/2011 21:09:40	planet: HFI Jupiter scan#4
04/08/2011 04:30:00	solar flare
04/08/2011 15:55:38	SCS TSA setpoint increase
08/08/2011 16:53:00	SGR: scanning law is interrupted
08/08/2011 17:32:00	slew back
08/08/2011 18:00:00	solar flare: X7 class
08/08/2011 18:44:00	planet: HFI Jupiter scan#4 (bis)
09/08/2011 01:54:00	slew to the catchup position
09/08/2011 08:00:00	solar flare
09/08/2011 17:23:00	SGR (end): back to nominal scanning law
06/09/2011 02:20:00	solar flare: M5.3
06/09/2011 23:00:00	solar flare: X2.1
13/09/2011 09:34:22	planet: HFI Crab scan#5
17/09/2011 08:00:00	solar flare: magnetic storm
20/09/2011 09:43:00	slew setting-up the second crab scan 
20/09/2011 10:41:38	planet: HFI Crab scan#5 (bis)
21/09/2011 16:43:41	planet: HFI Crab scan#6
21/09/2011 18:33:00	dtcp: extra pass
22/09/2011 12:00:00	solar flare: complexe event
24/09/2011 00:42:34	slew back to survey 5 scanning strategy 
26/09/2011 12:29:45	slew : station keeping manoeuvre half failed
04/10/2011 12:35:07	slew: orbit maintenance manoeuvre #12 bis
11/10/2011 12:35:13	test: Temperature steps on bolometer PID
12/10/2011 10:30:00	test: EOL-Fast IV at 100mK
22/10/2011 14:00:00	solar flare: small event
27/10/2011 12:38:38	SCS TSA setpoint increase
04/11/2011 00:00:00	solar flare: X2 class
07/11/2011 09:00:00	test : pre-EOL-LFER-1 (I_Bias steps)
08/11/2011 10:42:00	test: EOL-IBTU (slow VI)
14/11/2011 09:00:00	test: 2nd pre-EOL-LFER-1 (I_Bias steps) 
14/11/2011 23:58:33	slew: beginning of dwell duration compression phase 
18/11/2011 00:00:00	test: EOL-LFER-1 (I_Bias steps) 
26/11/2011 07:00:00	solar flare: Radiation storm and Coronal Mass Ejection
28/11/2011 17:10:00	dtcp: extra pass
07/12/2011 17:00:00	test: spinup test
08/12/2011 10:00:00	planet: HFI Mars scan @ 1.4 RPM
09/12/2011 16:43:00	star tracker unhealthy
16/12/2011 18:35:00	slew: back to scanning law
17/12/2011 18:00:00	planet: HFI Mars scan#3
23/12/2011 15:10:06	He3 flow rate 0 -> 1
25/12/2011 14:45:16	test: Add 153.4 uW on the 1.6K stage redundant PID
25/12/2011 20:00:00	solar flare: C-class
27/12/2011 11:42:10	test: Temperature steps on the bolometer plate II
29/12/2011 14:24:29	He3 flow rate 1 -> 2
02/01/2012 13:58:00	He3 flow rate 2 -> 3
03/01/2012 14:20:19	test: Temperature steps on bolo plate III
04/01/2012 13:52:00	He3 flow rate 3 -> 4
07/01/2012 14:10:00	He3 flow rate 4 -> 5
08/01/2012 07:20:00	slew to Jupiter deep annuli scan
09/01/2012 14:23:00	He3 flow rate 5 -> 6
10/01/2012 04:20:00	planet: HFI Jupiter scan
11/01/2012 14:47:00	He3 flow rate 6 -> 7
14/01/2012 16:00:00	END OF NOMINAL OPERATIONS
15/01/2012 14:05:00	test: optimisation
16/01/2012 15:00:21	test:  bolo plate ->110mK
16/01/2012 15:45:09	test:  bolo plate ->300mK
18/01/2012 15:20:10	test: Adjust compression
18/01/2012 16:15:11	test: EOL-Fast IV at 300 mK
20/01/2012 19:58:08	test: EOL-RAW54 at 300mK
22/01/2012 00:18:00	therm: loss of satellite thermal control
22/01/2012 15:00:00	CDMU PM-A reset
22/01/2012 22:59:58	DPU is rebooted
23/01/2012 05:00:00	solar flare: major one 
25/01/2012 14:45:00	test: Adjust compression
27/01/2012 19:00:00	solar flare
30/01/2012 21:53:00	slew to survey#6
06/02/2012 14:00:00	test: optimisation
07/02/2012 00:00:00	slew: large orbit correction manœuvre
10/02/2012 16:30:00	test: EOL-Fast IV at 600 mK
14/02/2012 14:20:00	CDMU PM-A switch over
20/02/2012 10:00:00	test: Adjust compression
20/02/2012 14:57:00	slew: touchup manœuvre
21/02/2012 15:00:00	test: Adjust compression
21/02/2012 15:16:00	test: Adjust compression
22/02/2012 16:50:00	test: Adjust compression
23/02/2012 15:20:00	test: Adjust compression

(Planck) High Frequency Instrument

Launch & Early Orbit Phase

Readout Electronic Unit

Sorption Cooler Subsystem (Planck)

Calibration and Performance Verification

Data Processing Unit

Data Processing Center

Command and Data Management Unit

Daily Tele-Communication Period

Attitude Control & Measurement Subsystem (AOCS)

Fiber Optic Gyroscope

Small Gap Recovery

hermal Stabilization Assembly

(Planck) Low Frequency Instrument

sudden change of the baseline level inside a ring

End Of Life

low frequency excess response