Difference between revisions of "LFI design, qualification, and performance"

From Planck PLA Wiki
Jump to: navigation, search
(Feed Horns (FH))
(Spectral Response)
 
(135 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[Category:Instruments]]
+
==<span id="LFIDescription">Instrument description</span>==
== Overview ==  
+
The LFI instrument (see Fig. 1 in the [[LFI overview]]) consists of a 20 K focal plane unit hosting the corrugated feed horns, the orthomode transducers (OMTs) and the receiver front-end modules (FEMs). Forty four composite waveguides{{BibCite|darcangelo2009a}} are interfaced with three conical thermal shields and connect the front-end modules to the warm (~300 K) back-end unit (BEU) containing a further radio frequency amplification stage, detector diodes and all the electronics for data acquisition and bias supply.  
 
 
The Planck-LFI instrument is an array of 11 radiometric receivers in the Ka, Q and V bands, with centre frequencies close to 30, 44 and 70 GHz. The exact centre frequencies for each receiver are reported in <cite>#planck2011-1-4</cite> [{{PEarly|3|link=Planck early results. First assessment of the Low Frequency Instrument in-flight performance}}]; for simplicity, here we will refer to the three channels using their nominal centre frequency. A detailed description of the LFI instrument is given in <cite>#bersanelli2010</cite> [{{PPreLaunch|4|link=Planck pre-launch status: Design and description of the Low Frequency Instrument}}], and  references therein. 
 
 
 
== The LFI description ==
 
 
 
The LFI instrument (see Figure 1 below) consists of a 20 K focal plane unit hosting the corrugated feed horns, the orthomode transducers (OMTs) and the receiver front-end modules (FEMs). Forty four composite waveguides <cite>#darcangelo2009a</cite> are interfaced with three conical thermal shields and connect the front-end modules to the warm (~300 K) back-end unit (BEU) containing a further radio frequency amplification stage, detector diodes and all the electronics for data acquisition and bias supply.  
 
 
 
[[File:lfi_instrument.jpg|thumb|center|600px|Figure 1. Left Panel: the LFI instrument with main thermal stages, focal plane, waveguides and sorption cooler piping highlighted. Right Panel: Labelling of feed horns on the LFI focal plane.]]
 
  
 
Best LFI noise performance is obtained with receivers based on InP High Electron Mobility Transistor (HEMT) low noise amplifiers (LNAs) for minimal power dissipation and best performance. To further minimise power consumption in the focal plane, the radiometers are split into two sub-assemblies connected by waveguides, one located at the telescope focal area, the other on the 300 K portion of the Planck satellite. These design features allow the entire front-end LNAs dissipation to be <0.55 W, which enables the active cooling of the focal assembly. This is achieved with a vibration-less hydrogen sorption cooler, which also provides 18 K pre-cooling to the HFI helium J-T cooler. Two sorption cooler units are included in the flight hardware.
 
Best LFI noise performance is obtained with receivers based on InP High Electron Mobility Transistor (HEMT) low noise amplifiers (LNAs) for minimal power dissipation and best performance. To further minimise power consumption in the focal plane, the radiometers are split into two sub-assemblies connected by waveguides, one located at the telescope focal area, the other on the 300 K portion of the Planck satellite. These design features allow the entire front-end LNAs dissipation to be <0.55 W, which enables the active cooling of the focal assembly. This is achieved with a vibration-less hydrogen sorption cooler, which also provides 18 K pre-cooling to the HFI helium J-T cooler. Two sorption cooler units are included in the flight hardware.
  
As shown schematically in Figure 2 below, the LFI consists of the following subsystems:
+
As shown schematically in Fig. 1 below, the LFI consists of the following subsystems:
 
* Radiometer Array Assembly (RAA)
 
* Radiometer Array Assembly (RAA)
 
* Sorption Cooler Subsystem (SCS)
 
* Sorption Cooler Subsystem (SCS)
 
* Radiometer Electronics Box Assembly (REBA)
 
* Radiometer Electronics Box Assembly (REBA)
  
The RAA includes the Front End Unit (FEU) and the Back End Unit (BEU), connected via waveguides. The FEU is located at the focus of the telescope, as one component of the joint LFI/HFI focal assembly (see sections below). The BEU is mounted on the top of the Planck SVM.
+
The RAA includes the Front End Unit (FEU) and the Back End Unit (BEU), connected via waveguides. The FEU is located at the focus of the telescope, as one component of the joint LFI/HFI focal assembly (see sections below). The BEU is mounted on the top of the Planck service module (SVM).
The REBA and the warm parts of the Sorption Cooler System (SCS) is located on one of the lateral panels of the service module (SVM). The FEU and the Sorption Cooler Compressor (SCC) are connected by concentric stainless steel tubes. The smaller tube carries hydrogen at ∼60 atmospheres from the cooler compressors to the FEU, while the larger tube returns the hydrogen at ∼0.3 atmospheres. These units are described in detail in following sections, the SCS is described in details in the satellite section dedicated to the [[Thermal design#Active cooling|Sorption Cooler]].
+
The REBA (Radiometer Electronics Box Assembly) and the warm parts of the Sorption Cooler System (SCS) are located on one of the lateral panels of the SVM. The FEU and the Sorption Cooler Compressor (SCC) are connected by concentric stainless steel tubes. The smaller tube carries hydrogen at ∼60 atmospheres from the cooler compressors to the FEU, while the larger tube returns the hydrogen at ∼0.3 atmospheres. These units are described in following sections and in the [[LFIAppendix|Annexes]], the SCS is described in details in the [[LFI design, qualification, and performance#The Sorption Cooler|Sorption Cooler]] section.
 
All LFI units are linked together by the LFI harness, which also connects to the spacecraft interface.
 
All LFI units are linked together by the LFI harness, which also connects to the spacecraft interface.
  
[[File:schema.jpg|thumb|center|500px|Figure 2. Block Diagram of LFI]]
+
[[File:schema.jpg|thumb|center|500px|'''Figure 1. Block Diagram of LFI''']]
  
 
=== ''Radiometer Array Assembly (RAA)'' ===
 
=== ''Radiometer Array Assembly (RAA)'' ===
Line 31: Line 23:
  
 
The time scale of the stability of the receiver is driven by the 1 rpm rotation speed of the spacecraft, which requires a very low 1/f-noise or gain variation of the low noise amplifiers and other components.
 
The time scale of the stability of the receiver is driven by the 1 rpm rotation speed of the spacecraft, which requires a very low 1/f-noise or gain variation of the low noise amplifiers and other components.
The LFI uses a pseudo-correlation receiver concept (Figure 3 below). This radiometer concept is chosen to maximise the stability of the instrument by reducing the effect of non-white noise generated in the radiometer itself. In this scheme, the difference between the inputs to each of the chains (the signal from the telescope and that from a reference black body respectively) is continuously being observed. To remove the effect of instability in the back-end amplifiers and detector diodes, it is necessary to switch the signal detected at the diodes at high rate.
+
The LFI uses a pseudo-correlation receiver concept (Fig. 2 below). This radiometer concept is chosen to maximise the stability of the instrument by reducing the effect of non-white noise generated in the radiometer itself. In this scheme, the difference between the inputs to each of the chains (the signal from the telescope and that from a reference black body respectively) is continuously being observed. To remove the effect of instability in the back-end amplifiers and detector diodes, it is necessary to switch the signal detected at the diodes at high rate.
 
The signals from the sky and from a reference load are combined by a hybrid coupler, amplified in two independent amplifier chains, and separated out by another hybrid. The sky and the reference load power can then be measured and differenced. Since the reference signal has been subject to the same gain variations in the two amplifier chains as the sky signal, the true sky power can be recovered.
 
The signals from the sky and from a reference load are combined by a hybrid coupler, amplified in two independent amplifier chains, and separated out by another hybrid. The sky and the reference load power can then be measured and differenced. Since the reference signal has been subject to the same gain variations in the two amplifier chains as the sky signal, the true sky power can be recovered.
 
The differencing receiver greatly improves the stability if the two input signals are almost equal, at
 
The differencing receiver greatly improves the stability if the two input signals are almost equal, at
 
a cost of a factor of <math>\sqrt 2 \; </math> in sensitivity compared to a perfectly stable total-power radiometer with the same noise temperature and bandwidth. This radiometer concept is capable of greatly reducing the knee frequency.
 
a cost of a factor of <math>\sqrt 2 \; </math> in sensitivity compared to a perfectly stable total-power radiometer with the same noise temperature and bandwidth. This radiometer concept is capable of greatly reducing the knee frequency.
We define as Radiometer Chain Assembly (RCA, see Figure 3) each functional unit from the feed horn to the BEM. The RAA therefore includes a set of 11 RCAs and the Data Acquisition Electronics, all mounted on a suitable mechanical structure (see also Figure 2 above). Although there are differences in the details of the radiometer chains at different frequencies, their overall configuration is similar, and a general description of its design is provided in this section.
+
We define as Radiometer Chain Assembly (RCA, see Fig. 2) each functional unit from the feed horn to the BEM. The RAA therefore includes a set of 11 RCAs and the Data Acquisition Electronics (see also Fig. 1 above), all mounted on a suitable mechanical structure. Although there are differences in the details of the radiometer chains at different frequencies, their overall configuration is similar, and a general description of its design is provided in this section.
 
Planck LFI has 11 Radiometer Chain Assembly (RCA). Each RCA is constituted by feed horn and FEM in the FEU (at 20 K), BEM (at 300 K) in the BEU and four waveguides that connect each FEM-BEM couple. The frequency distribution of the RCA is the following:
 
Planck LFI has 11 Radiometer Chain Assembly (RCA). Each RCA is constituted by feed horn and FEM in the FEU (at 20 K), BEM (at 300 K) in the BEU and four waveguides that connect each FEM-BEM couple. The frequency distribution of the RCA is the following:
 
* 2 RCAs at 30 GHz;
 
* 2 RCAs at 30 GHz;
Line 41: Line 33:
 
* 6 RCAs at 70 GHz.
 
* 6 RCAs at 70 GHz.
  
[[File:rca_schematic.jpg|thumb|center|600px|Figure 3. A complete RCA from feed-horn to analog voltage output. The insets show the OMT, the details of the 20 K pseudo-correlator and of the back-end radio-frequency amplification, low-pass filtering, detection and DC amplification.]]
+
[[File:rca_schematic.jpg|thumb|center|640px|'''Figure 2. A complete RCA from feed-horn to analog voltage output. The insets show the OMT, the details of the 20 K pseudo-correlator and of the back-end radio-frequency amplification, low-pass filtering, detection and DC amplification.''']]
  
 
==== ''Radiometer Chain Assembly (RCA)''====
 
==== ''Radiometer Chain Assembly (RCA)''====
  
Every RCA consists of two radiometers, each feeding two diode detectors (see Figure 3 above), for a total of 44 detectors. The 11 RCAs are labelled by a numbers from 18 to 28 as outlined in Figure 1, right panel.
+
Every RCA consists of two radiometers, each feeding two diode detectors (see Fig. 2 above), for a total of 44 detectors. The 11 RCAs are labelled by a numbers from 18 to 28 as outlined in Fig. 1 in [[LFI overview]], right panel.
  
Figure 3 provides a more detailed description of each radiometric receiver. In each RCA, the two perpendicular linear polarisation components split by the OMT propagate through two independent pseudo-correlation differential radiometers, labelled as ''M'' or ''S'' depending on the arm of the OMT they are connected to (''Main'' or ''Side'', see lower-left inset of Figure 3).
+
Fig. 2 provides a more detailed description of each radiometric receiver. In each RCA, the two perpendicular linear polarisation components split by the OMT propagate through two independent pseudo-correlation differential radiometers, labelled as ''M'' or ''S'' depending on the arm of the OMT they are connected to (''Main'' or ''Side'', see lower-left inset of Fig. 2).
  
In each radiometer the sky signal coming from the OMT output is continuously compared with a stable 4 K blackbody reference load mounted on the external shield of the HFI 4 K box <cite>#valenziano2009</cite>. After being summed by a first hybrid coupler, the two signals are amplified by ~30 dB, see upper-left inset of Figure 3. The amplifiers were selected for best operation at low drain voltages and for gain and phase match between paired radiometer legs, which is crucial for good balance. Each amplifier is labelled with codes ''1'', ''2'' so that the four outputs of the LNAs can be named with the sequence: ''M1'', ''M2'' (radiometer ''M'') and ''S1'', ''S2'' (radiometer ''S'').  
+
In each radiometer the sky signal coming from the OMT output is continuously compared with a stable 4 K blackbody reference load mounted on the external shield of the HFI 4 K box{{BibCite|valenziano2009}}. After being summed by a first hybrid coupler, the two signals are amplified by ~30 dB, see upper-left inset of Fig. 2. The amplifiers were selected for best operation at low drain voltages and for gain and phase match between paired radiometer legs, which is crucial for good balance. Each amplifier is labelled with codes ''1'', ''2'' so that the four outputs of the LNAs can be named with the sequence: ''M1'', ''M2'' (radiometer ''M'') and ''S1'', ''S2'' (radiometer ''S'').  
 
Tight mass and power constraints called for a simple design of the Data Acquisition Electronics (DAE) box so that power bias lines were divided into five common-grounded power groups with no bias voltage readouts; only the total drain current flowing through the front-end amplifiers is measured and is available to the house-keeping telemetry (this design has important implications for front-end bias tuning, which depends critically on the satellite electrical and thermal configuration and was repeated at all integration stages, during on-ground and in-flight satellite tests).
 
Tight mass and power constraints called for a simple design of the Data Acquisition Electronics (DAE) box so that power bias lines were divided into five common-grounded power groups with no bias voltage readouts; only the total drain current flowing through the front-end amplifiers is measured and is available to the house-keeping telemetry (this design has important implications for front-end bias tuning, which depends critically on the satellite electrical and thermal configuration and was repeated at all integration stages, during on-ground and in-flight satellite tests).
A phase shift alternating between <math> 0^\circ \; </math> and <math>180^\circ \; </math> at the frequency of 4096 Hz is applied in one of the two amplification chains and then a second hybrid coupler separates back the sky and reference load components that are further amplified and detected in the warm BEU, with a voltage output ranging from -2.5 V to +2.5 V.
+
A phase shift (or phase switch) alternating between <math> 0^\circ \; </math> and <math>180^\circ \; </math> at the frequency of 4096 Hz is applied in one of the two amplification chains and then a second hybrid coupler separates back the sky and reference load components that are further amplified and detected in the warm BEU, with a voltage output ranging from -2.5 V to +2.5 V.
  
 
Each radiometer has two output diodes which are labelled with binary codes ''00'', ''01'' (radiometer ''M'') and ''10'', ''11'' (radiometer ''S''), so that the four outputs of each radiometric chain can be named with the sequence: ''M-00'', ''M-01'', ''S-10'', ''S-11''.
 
Each radiometer has two output diodes which are labelled with binary codes ''00'', ''01'' (radiometer ''M'') and ''10'', ''11'' (radiometer ''S''), so that the four outputs of each radiometric chain can be named with the sequence: ''M-00'', ''M-01'', ''S-10'', ''S-11''.
  
After detection, an analog circuit in the DAE box removes a programmable offset in order to obtain a nearly null DC output voltage and a programmable gain is applied to increase the signal dynamics and optimally exploit the ADC input range. After the ADC, data are digitally down-sampled, re-quantised and compressed in the REBA according to a scheme described in <cite>#herreros2009, maris2009</cite>, before preparing telemetry packets. On ground, telemetry packets are converted to sky and reference load time ordered data after calibrating the ADU samples into volt considering the applied offset and gain factors.
+
After detection, an analog circuit in the DAE box removes a programmable offset in order to obtain a nearly null DC output voltage and a programmable gain is applied to increase the signal dynamics and optimally exploit the ADC input range. After the ADC, data are digitally down-sampled, re-quantised and compressed in the REBA according to a scheme described in{{BibCite|herreros2009}}{{BibCite|maris2009}}, before preparing telemetry packets. On ground, telemetry packets are converted to sky and reference load time ordered data after calibrating the ADU samples into volt considering the applied offset and gain factors.
  
To first order, the mean differential power output for each of the four receiver diodes can be written as follows <cite>#seiffert2002, mennella2003, bersanelli2010</cite> [{{PEarly|4|link=Planck pre-launch status: Design and description of the Low Frequency Instrument}}]:
+
To first order, the mean differential power output for each of the four receiver diodes can be written as follows{{BibCite|seiffert2002}}{{BibCite|mennella2003}}{{PlanckPapers|bersanelli2010}}::
  
 
<math> \label{eq:power}
 
<math> \label{eq:power}
Line 66: Line 58:
 
where <math>G_{\rm tot} \;</math> is the total gain, <math>k \;</math> is the Boltzmann constant, <math>\beta \;</math> the receiver bandwidth and <math>a \;</math> is the diode constant. <math>T_{\rm sky} \;</math> and <math>T_{\rm ref}\; </math> are the average sky and reference load antenna temperatures at the inputs of the first hybrid and <math>T_{\rm noise} \;</math> is the receiver noise temperature.
 
where <math>G_{\rm tot} \;</math> is the total gain, <math>k \;</math> is the Boltzmann constant, <math>\beta \;</math> the receiver bandwidth and <math>a \;</math> is the diode constant. <math>T_{\rm sky} \;</math> and <math>T_{\rm ref}\; </math> are the average sky and reference load antenna temperatures at the inputs of the first hybrid and <math>T_{\rm noise} \;</math> is the receiver noise temperature.
  
The gain modulation factor <cite>#mennella2003, planck2011-1-6 </cite> [{{PEarly|3|link=Planck early results. The Low Frequency Instrument data processing}}], <math>r</math>, is defined by:
+
The gain modulation factor{{BibCite|mennella2003}}{{PlanckPapers|planck2011-1-6}}, <math>r</math>, is defined by:
  
 
<math> \label{eq:erre1}  
 
<math> \label{eq:erre1}  
Line 85: Line 77:
 
</math>
 
</math>
  
If the front-end components are not perfectly balanced, then the separation of the sky and reference load signals after the second hybrid is not perfect and the outputs are mixed. First-order deviations in white noise sensitivity from the ideal behaviour are caused mainly by noise temperature and phase-switch amplitude mismatches. Following the notation used in <cite>#seiffert2002</cite>, we define <math>\epsilon_{Tn} \; </math>, the imbalance in front end noise temperature, and <math>\epsilon_{A1} \; </math> and <math> \epsilon_{A2} \;</math> , the imbalance in signal attenuation in the two states of the phase switch. Equation above for the two diodes of a slightly imbalanced radiometer then becomes
+
If the front-end components are not perfectly balanced, then the separation of the sky and reference load signals after the second hybrid is not perfect and the outputs are mixed. First-order deviations in white noise sensitivity from the ideal behaviour are caused mainly by noise temperature and phase-switch amplitude mismatches. Following the notation used in{{BibCite|seiffert2002}}, we define <math>\epsilon_{Tn} \; </math>, the imbalance in front end noise temperature, and <math>\epsilon_{A1} \; </math> and <math> \epsilon_{A2} \;</math> , the imbalance in signal attenuation in the two states of the phase switch. Equation above for the two diodes of a slightly imbalanced radiometer then becomes
  
 
<math> \label{eq:dt2} (\Delta T^{diode} )^2 ≈ (\Delta T_0^{diode})^2 ( 1± \frac{\epsilon_{A1}- \epsilon_{A2}}{2}  
 
<math> \label{eq:dt2} (\Delta T^{diode} )^2 ≈ (\Delta T_0^{diode})^2 ( 1± \frac{\epsilon_{A1}- \epsilon_{A2}}{2}  
Line 97: Line 89:
 
V^{rad}_{out} = w_1 V^{diode\,1}_{out} +w_2 V^{diode\,2}_{out} </math>
 
V^{rad}_{out} = w_1 V^{diode\,1}_{out} +w_2 V^{diode\,2}_{out} </math>
  
where <math>w_1 </math> and <math>w_2</math> are inverse-variance weights calculated from the data as discussed in <cite>#planck2011-1-6</cite>. This way, the diode-diode anti-correlation is cancelled, and the radiometer white noise becomes
+
where <math>w_1 </math> and <math>w_2</math> are inverse-variance weights calculated from the data as discussed in {{PlanckPapers|planck2011-1-6}}. This way, the diode-diode anti-correlation is cancelled, and the radiometer white noise becomes
  
 
<math> \label{eq:dt3}
 
<math> \label{eq:dt3}
Line 112: Line 104:
 
See [[TOI processing LFI|Diode Combination]] section for the details of the diode combination procedure.  
 
See [[TOI processing LFI|Diode Combination]] section for the details of the diode combination procedure.  
  
In Figure 4 below we show a close-up of the two front end modules of an RCA with the four phase switches which are labelled with the four letters ''A'' and ''B'' (main arm), ''C'' and ''D'' (side arm). Each phase switch is characterised by two states: state 0 (no phase shift applied to the incoming wave) and state 1 (<math>180^\circ</math> phase shift applied) and can either stay fixed in a state or switch at 4 kHz between the two states.
+
In Fig. 3 below we show a close-up of the two front end modules of an RCA with the four phase switches which are labelled with the four letters ''A'' and ''B'' (main arm), ''C'' and ''D'' (side arm). Each phase switch is characterised by two states: state 0 (no phase shift applied to the incoming wave) and state 1 (<math>180^\circ</math> phase shift applied) and can either stay fixed in a state or switch at 4 kHz between the two states.
 
      
 
      
 
Phase switches are clocked and biased by the DAE and their configuration can be programmed via telecommand. In order to simplify the instrument electronics, phase switches are configured and operated in pairs: ''A/C'' and ''B/D''. This means that if phase switches ''A'' and ''C'' are switching at 4 kHz then ''B'' and ''D'' are fixed both in the same state (either 0 or 1). This simplification, required during the design phase to comply with mass and power budgets, comes at the price of loosing some setup redundancy.
 
Phase switches are clocked and biased by the DAE and their configuration can be programmed via telecommand. In order to simplify the instrument electronics, phase switches are configured and operated in pairs: ''A/C'' and ''B/D''. This means that if phase switches ''A'' and ''C'' are switching at 4 kHz then ''B'' and ''D'' are fixed both in the same state (either 0 or 1). This simplification, required during the design phase to comply with mass and power budgets, comes at the price of loosing some setup redundancy.
  
[[File:phase_switch_operation.jpg|thumb|center|460px|Figure 4. Close-up of the two front-end modules of an RCA. There are four phase switches, labelled A, B, C and D. Each switch can be fixed in one of its two positions (labelled as 0, 1) or switch at 4 kHz between 0 and 1. Phase switches are clocked and biased by the DAE in pairs: A/C and B/D.]]
+
[[File:phase_switch_operation.jpg|thumb|center|460px|'''Figure 3. Close-up of the two front-end modules of an RCA. There are four phase switches, labelled A, B, C and D. Each switch can be fixed in one of its two positions (labelled as 0, 1) or switch at 4 kHz between 0 and 1. Phase switches are clocked and biased by the DAE in pairs: A/C and B/D.''']]
  
 
==== ''Feed Horns (FH)''====
 
==== ''Feed Horns (FH)''====
  
 
Dual profiled corrugated horns have been selected at all LFI frequencies as the best design in terms of shape of the main lobe, level of the side lobes, control of the phase centre, and compactness.  
 
Dual profiled corrugated horns have been selected at all LFI frequencies as the best design in terms of shape of the main lobe, level of the side lobes, control of the phase centre, and compactness.  
For the details of the LFI Feed Horns design,m see corresponding [[LFIAppendix|Appendix]] [[LFIAppendix#Feed Horns|Appendix]] section.
+
Details of the design, flight model and tests of Planck-LFI feed horns can be found in{{BibCite|villa2009}} and in the corresponding [[LFIAppendix#Feed Horns (FH)|Annex]] section.
 
 
Dual profiled LFI horns are composed by a Sine Squared profiled section, and an exponential profile near the aperture plane.
 
In order to optimise the optical matching of the feeds phase centres to the telescope focal surface, while preventing obscuration between horns, LFI has 6 different feed horn designs. For each frequency, the number of feeds and the number of different designs are reported in Table 1 below.
 
 
 
{| border="1" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 1. Number of LFI feed horns and number of different feed horn designs'''
 
|-
 
!scope="col"| Frequency (GHz)
 
!scope="col"| Number of Horns
 
!scope="col"| Number of designs
 
|-
 
|width="150" |30
 
|width="120" |2
 
|width="120" |1
 
|-
 
|width="150" |44
 
|width="120" |3
 
|width="120" |2
 
|-
 
|width="150" |70
 
|width="120" |6
 
|width="120" |3
 
|-
 
|}
 
 
 
 
 
LFI feed horn design specifications are reported in the table 2 below.
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 2. LFI feed horn design specifications. The edge taper is the taper used to optimize the optical response; the return loss and the cross polarization are the maximum design values over the whole bandwidth; The phase center location is defined as the distance between the horn flange and the focal surface of the telescope.'''
 
|-
 
|width="700" | [[File:fh1.jpg|thumb|center|500px|]]
 
|-
 
|}
 
 
 
The design process  led to a corrugation profile composed by a mixture of a sine-squared section, starting from the throat, and an exponential section near the aperture plane. The length of this last has a direct impact on the location of the phase center. The analytical expression of the corrugation profile, <math>R(z)</math>, is the following
 
 
 
<math> \label{eq:fh1}
 
R(z) = R_{th} +(R_s −R_{th}) ((1−A) \frac{z}{L_s} + A \, sin^\beta \, (\frac{\pi \, z}{2 \, L_s})) </math>
 
: <math> 0 ≤ z ≤ L_s
 
</math>
 
 
 
in the sine section, and
 
 
 
<math> \label{eq:fh2}
 
R(z)= R_s+e^{\alpha(z−L_s)}−1; \; \alpha = \frac{1}{L_e} ln(R_{ap}−R_s) </math>
 
: <math> L_s ≤ z ≤ L_e + L_s
 
</math>
 
 
 
in the exponential region. Here, <math>R_{th}</math> is the throat radius, <math>R_s</math> is the sine squared region end radius (or exponential region initial radius), <math>R_{ap}</math> is the aperture radius, <math>L_s</math> is the sine squared region length and <math>L_e</math> is the exponential region length. The parameter <math>A (0 ≤ A ≤ 1)</math> modulates the first region profile between linear and pure sine squared type. The parameters <math>L_e/(L_e + L_s)</math>, <math>A</math> and <math>R_s</math> can be used to control, as far as possible, the position and frequency stability of the phase center and the compactness of the structure. The feed horn parameters are reported in table 3 below.
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 3. LFI feed horn parameters. <math>R_{th}</math>: Throat radius; <math>N_s</math>: Number of corrugation of the <math>sin^\beta </math> section; <math>R_s</math>: end radius of <math>sin^\beta</math> section; <math>A</math>: tapering coefficient; <math>N_e</math>: number of corrugation of the exponential section; <math>R_{ap}</math>: final aperture diameter.'''
 
|-
 
|width="500" | [[File:fh2.jpg|thumb|center|360px|]]
 
|-
 
|}
 
 
 
The qualification campaign, mainly focused on RF return loss and pattern (amplitude and phase) measurements, was successfully concluded. The agreement between the pattern measurements and the expected performances (simulated using nominal corrugation profile) is excellent both in amplitude and in phase. Moreover reflection measurements show a good impedance match for all the horns, the return loss being better than -30 dB over the whole 20% of operational bandwidth.
 
 
 
Details of the design, flight model and tests of Planck-LFI feed horns can be found in <cite>#villa2009</cite>.
 
  
 
==== ''OrthoMode Transducers (OMT)''====
 
==== ''OrthoMode Transducers (OMT)''====
  
The Ortho–Mode Transducer (OMTs) separates the radiation collected by the feed horn in two orthogonal polarisation components. It consists of a circular to square waveguide transition (directly connected to the FH), a square waveguide section and two separate rectangular waveguide (the through and side arms, which separate and pick up the orthogonal polarisation, connected with the FEU). On the side arms is always present a 90 degrees bend, while a twist is also necessary on the main (30 and 44 GHz) and side (70GHz) arm, in order to math the FEU polarisation.
+
The Ortho–Mode Transducer (OMTs) separates the radiation collected by the feed horn in two orthogonal polarisation components. It consists of a circular to square waveguide transition (directly connected to the FH), a square waveguide section and two separate rectangular waveguide (the through and side arms, which separate and pick up the orthogonal polarisation, connected with the FEU). On the side arms is always present a 90 degrees bend, while a twist is also necessary on the main (30 and 44 GHz) and side (70 GHz) arm, in order to math the FEU polarisation.
 
 
The required and measured performances for the LFI OMTs at all frequencies are reported in the following tables 4 and 5:
 
 
 
{| border="1" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 4. Performance Characteristics of the LFI OMTs based on measurements. The values are the worst values over the entire 20% of bandwidth.'''
 
|-
 
!scope="col"| OMT ID
 
!scope="col"| Bandwidth [GHz]
 
!scope="col"| X–Pol [dB] (Main)
 
!scope="col"| X–Pol [dB] (Side)
 
!scope="col"| Return–Loss [dB] (Main)
 
!scope="col"| Return–Loss [dB] (Side)
 
|-
 
|width="80" |18
 
|width="100" |14
 
|width="100" |<29
 
|width="100" |<30
 
|width="100" |-15.0
 
|width="100" |-20.0
 
|-
 
|width="80" |19
 
|width="100" |14
 
|width="100" |<26
 
|width="100" |<28
 
|width="100" |-15.0
 
|width="100" |-20.0
 
|-
 
|width="80" |20
 
|width="100" |14
 
|width="100" |<32
 
|width="100" |<35
 
|width="100" |-15.0
 
|width="100" |-20.0
 
|-
 
|width="80" |21
 
|width="100" |14
 
|width="100" |<32
 
|width="100" |<37
 
|width="100" |-15.0
 
|width="100" |-18.0
 
|-
 
|width="80" |22
 
|width="100" |14
 
|width="100" |<26
 
|width="100" |<28
 
|width="100" |-15.0
 
|width="100" |-18.0
 
|-
 
|width="80" |23
 
|width="100" |14
 
|width="100" |<26
 
|width="100" |<28
 
|width="100" |-15.0
 
|width="100" |-20.0
 
|-
 
|width="80" |24
 
|width="100" |8.8
 
|width="100" |<38
 
|width="100" |<40
 
|width="100" |-13.0
 
|width="100" |-18.0
 
|-
 
|width="80" |25
 
|width="100" |8.8
 
|width="100" |<31
 
|width="100" |<32
 
|width="100" |-13.0
 
|width="100" |-18.0
 
|-
 
|width="80" |26
 
|width="100" |8.8
 
|width="100" |<27
 
|width="100" |<25
 
|width="100" |-13.0
 
|width="100" |-17.0
 
|-
 
|width="80" |27
 
|width="100" |6
 
|width="100" |<38
 
|width="100" |<44
 
|width="100" |-16.0
 
|width="100" |-23.0
 
|-
 
|width="80" |28
 
|width="100" |6
 
|width="100" |<36
 
|width="100" |<38
 
|width="100" |-16.0
 
|width="100" |-22.0
 
|-
 
|}
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 5. Mean value of the IL over LFI bandwidth estimated at 20K and measured at room temperature.'''
 
|-
 
|width="400" | [[File:omt.jpg|thumb|center|320px|]]
 
|-
 
|}
 
  
The details of the flight models and measurements of the Planck LFI ortho-mode transducers can be found in <cite>#darcangelo2009b</cite>.  
+
The details of the flight models and measurements of the Planck LFI ortho-mode transducers can be found in{{BibCite|darcangelo2009b}} and in the corresponding [[LFIAppendix#OrthoMode Transducers (OMT)|Annex]] section.
  
 
==== ''Front End Modules (FEM)''====
 
==== ''Front End Modules (FEM)''====
  
 
Front End Modules are located in the FPU, just in cascade of the Feed Horn and the Ortho Mode Transducers. 70 GHz FEMs are mounted onto the inner wall of the mainframe (the wall facing HFI instrument) from the HFI side. 44 and 30 GHz FEMs are inserted into the mainframe from the WG side and fixed to the bottom plate. Screws to bottom plate are inserted from WG side.
 
Front End Modules are located in the FPU, just in cascade of the Feed Horn and the Ortho Mode Transducers. 70 GHz FEMs are mounted onto the inner wall of the mainframe (the wall facing HFI instrument) from the HFI side. 44 and 30 GHz FEMs are inserted into the mainframe from the WG side and fixed to the bottom plate. Screws to bottom plate are inserted from WG side.
The LFI FEMs are the first active stage of amplification of the radiometer chain. Each FEM contains four amplification paths. Each path is composed by several cascaded LNAs followed by a phase switch. Two passive hybrids, at the input and output of the FEM, are used to mix couples of signals of the same radiometer (see Figure 4). This makes the instabilities of each chain to be applied to both the sky and load signals.
+
The LFI FEMs are the first active stage of amplification of the radiometer chain. Each FEM contains four amplification paths. Each path is composed by several cascaded LNAs followed by a phase switch. Two passive hybrids, at the input and output of the FEM, are used to mix couples of signals of the same radiometer (see Fig. 3). This makes the instabilities of each chain to be applied to both the sky and load signals.
  
 
The passive hybrid coupler (magic-tee) combines the signals from the sky and cold load with a fixed phase offset of either 90 deg or 180 deg between them. It has a 20% bandwidth, low loss, and amplitude balance needed at the output to ensure adequate signal isolation.
 
The passive hybrid coupler (magic-tee) combines the signals from the sky and cold load with a fixed phase offset of either 90 deg or 180 deg between them. It has a 20% bandwidth, low loss, and amplitude balance needed at the output to ensure adequate signal isolation.
  
The FEM LNAs (InP MMIC) are biased providing 1 drain line per channel (that is 4 per FEM) and 2 gate lines per channel (that is 8 per FEM). The FEM Phase switches are biased providing 2 lines per channel (that is 8 per FEM) each capable of providing a direct bias current or a reverse bias voltage.
+
The details of the design, development and verification of the 70 GHz front-end modules for the Planck Low Frequency Instrument can be found in{{BibCite|varis2009}} and in the corresponding [[LFIAppendix#Front End Modules (FEM)|Annex]] section.
 
 
The LFI FEM parameters necessary to meet the science objectives at 30 and 44 GHz were given as requirements and goals and are summarised in table 6 below where they are compared with the values actually achieved. The FEM units meet the requirements, within the measurement errors, for most parameters and in particular the noise temperature. The units come close to the more stringent goals in several parameters. Of particular note are the noise temperatures achieved; these along with the wide bandwidths are critical for the high sensitivity required for the Planck mission. Some LNAs within the FEMs met the goals at 30 GHz and 44 GHz within the measurements errors and reached 3 and 5 times the theoretical quantum limit respectively at the band centres. Furthermore, a range of tests showed that LNAs and FEMs achieved the stability levels required to meet the observing strategy of Planck. In particular, the 1/f noise knee frequency ≤29 mHz, close to the goal, met the conditions imposed by the 60 second rotation period of the spacecraft.
 
The linear polarization performance of the FEMs exceeded the requirements of the mission. The isolation between the E- and H- polarizations was measured to be between 51 and 58 dBs for the various FEMs. The LFI radiometers have very well determined position angle precision, being determined by the accuracy of the waveguide engineering. The 30 and 44 GHz geometry is accurate to ∼ <math>0.1^\circ \, </math> ; the corresponding precision is ∼ <math>1^\circ \, </math> in the HFI polarimeters. The temperature stability requirement values are also given in the table 6 below.
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 6. Summary of the FEM goals, requirements and mean achieved performances.'''
 
|-
 
|width="300" | [[File:fem1.jpg|thumb|center|500px|]]
 
|-
 
|}
 
 
 
The details of the design, development and verification of the 30 and 44 GHz front-end modules for the Planck Low Frequency Instrument can be found in <cite>#davis2009</cite>.
 
 
 
For what regards the 70 GHz channels, for the LNA selection of the FEMs, nine different wafers from various  processing runs were evaluated, only the LNAs with the best performance were assembled as the first stage amplifiers in the FEM ACAs. For the phase switch selection, four different wafers were evaluated. When the signal is passed to an output, the gain is 35 dB or higher for almost the entire required range, and on average, the Planck requirement was fulfilled. In all FEMs, the average channel gains ranged from 34.0-40.0 dB (uncertainty ±0.1 dB). When the signal is isolated from an output, the gain is 20 dB lower or more at all frequencies. This difference in gain is used as the measure for isolation. In all the six FEMs, the channel isolation values ranged from 11.3-22.1 dB (uncertainty ±0.1 dB).
 
 
 
Table 7 below summarises the best, the worst and the average values of the key performance parameters. The shown uncertainties are based on worst case estimates.
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 7. Summary of the 70 GHz Protoflight Model radiometer performance.'''
 
|-
 
|width="300" | [[File:fembem70.jpg|thumb|center|580px|]]  
 
|-
 
|}
 
 
 
The details of the design, development and verification of the 70 GHz front-end modules for the Planck Low Frequency Instrument can be found in <cite>#varis2009</cite>.  
 
  
 
==== ''Waveguides''====
 
==== ''Waveguides''====
  
The LFI Front End Unit (FEU) is connected to the Back End Unit (BEU) by 44 rectangular waveguides approximately 1.5-2.0 meter long. Each waveguide exhibits low VSWR, low thermal conductivity, low insertion loss, and low mass. In addition, the waveguide path shall permit the LFI/HFI integration and the electrical bonding between FPU and BEU. Because of the Focal Plane Unit arrangement, the waveguides are in general twisted and bended in different planes and with different angles, depending on the particular waveguide. From the thermal point of view the waveguides have to connect 2 systems (BEM and FEM) that are at very different temperatures. At BEM level the waveguides are at a temperature of 300K while at FEM level the temperature is 20K. The waveguides have to reduce the thermal flow from 300K to 20K. In Figure 1 (left panel) a conceptual sketch of the LFI configuration is shown.
+
The LFI Front End Unit (FEU) is connected to the Back End Unit (BEU) by 44 rectangular waveguides approximately 1.5-2.0 meter long. Each waveguide exhibits low voltage standing wave ratio, low thermal conductivity, low insertion loss, and low mass. In addition, the waveguide path shall permit the LFI/HFI integration and the electrical bonding between FPU and BEU. Because of the Focal Plane Unit arrangement, the waveguides are in general twisted and bended in different planes and with different angles, depending on the particular waveguide. From the thermal point of view the waveguides have to connect 2 systems (BEM and FEM) that are at very different temperatures. At BEM level the waveguides are at a temperature of 300K while at FEM level the temperature is 20K. The waveguides have to reduce the thermal flow from 300K to 20K. In Fig. 1 in [[LFI overview]] (left panel) a conceptual sketch of the LFI configuration is shown.  
 
 
All the required characteristics cannot be realized with single material waveguide configuration; a composite waveguide configuration is needed. The WGs can be considered divided in three sections: 1. 400 mm of Stainless Steel (gold plated) straight waveguide section, attached to the BEU, ending after the 3rd V–groove;
 
2. 300 mm of non–plated Stainless Steel (SS). The SS-sections are identical for all the channels except for internal dimensions, depending on frequency. These guides are connected to all the V-grooves in order to dissipate the heat produced at BEU level.
 
3. bended and twisted 400 microns thin electroformed copper waveguide starting at the end of the SS–section and attached to the FEU, whose length varying from around 800 mm to 1300 mm, with 2 to 4 Cu-joints. The copper waveguides section is connected to a mechanical support structure in five points in order to increase the stiffness of the waveguide.  
 
  
The performance for the LFI waveguides at all frequencies are reported in the following table 8:
+
Details of the Planck-LFI flight model of the composite waveguides can be found in{{BibCite|darcangelo2009a}} and in the corresponding [[LFIAppendix#Waveguides|Annex]] section.
 
 
{| border="1" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 8. Number of LFI waveguides and performances. The Insertion Loss (IL), Return Loss (RL) and Electrical Resistance (R) values are the requirements. In between parenthesis the goal is reported also. Note that the RL value includes possible degradation due to presence of flanges.'''
 
|-
 
!scope="col"| Frequency
 
!scope="col"| <math> \nu </math> band [GHz] 
 
!scope="col"| Number
 
!scope="col"| IL [dB] @20 K
 
!scope="col"| RL [dB]
 
!scope="col"| Isolation [dB]
 
!scope="col"| R [mΩ] @20 K
 
!scope="col"| R [mΩ] @300 K
 
|-
 
|width="80" | 30
 
|width="100" | 27-33
 
|width="100" |8
 
|width="100" |<2.5 (1.0)
 
|width="100" |<-25
 
|width="100" |<-30
 
|width="100" |11.8
 
|width="100" |27.3
 
|-
 
|width="80" | 44
 
|width="100" | 39.6-48.4
 
|width="100" |12
 
|width="100" |<3.0 (1.5)
 
|width="100" |<-25
 
|width="100" |<-30
 
|width="100" |14.7
 
|width="100" |34.1
 
|-
 
|width="80" | 70
 
|width="100" | 63-77
 
|width="100" |24
 
|width="100" |<5.0 (3.5)
 
|width="100" |<-25
 
|width="100" |<-30
 
|width="100" |26.2
 
|width="100" |60.5
 
|-
 
|}
 
 
 
From the thermal point of view the waveguides have to connect 2 systems (BEM and FEM) that are at different temperatures. At BEM level the waveguides are at a temperature of 300K while at FEM level the temperature is 20K. Along the Stainless Steel section the waveguides have to reduce the thermal flow from 300K to 20K. The Stainless Steel waveguide is connected to all the V-grooves in order to dissipate the heat produced at BEU level.
 
 
 
Details of the Planck-LFI flight model of the composite waveguides can be found in <cite>#darcangelo2009a</cite>.  
 
  
 
==== ''Back End Modules (BEM)''====
 
==== ''Back End Modules (BEM)''====
  
 
The BEMs are composed by four identical channels each made of Low Noise Amplifiers (LNA), RF Band Pass Filter, RF to DC diode detector and DC amplifiers.
 
The BEMs are composed by four identical channels each made of Low Noise Amplifiers (LNA), RF Band Pass Filter, RF to DC diode detector and DC amplifiers.
 
+
The FEM output signals are connected by waveguide from the Focal Plane Unit (FPU) assembly to the Back End Modules (BEM’s) housed adjacent to the Data Acquisition Electronics (DAE) assembly. To maintain compatibility with the FEM’s, each BEM accommodates four receiver channels from the four waveguide outputs of each FEM. The BEM internal signal routes are not cross coupled and can be regarded as four identical parallel circuits.
In the 30 GHz BEM, each LNA consists of two cascaded MMIC amplifiers. The Band Pass Filter is based on microstrip coupled line structure. Its design is a three order Chebyshev response band pass filter.
 
The detector is composed by a hybrid reactive/passive matching network, and a Schottky diode. A commercial Agilent beam-lead and zero-bias diode was selected.
 
The detector diode is followed by a low noise operational amplifier that provides most of the DC amplification. A second stage is implemented using an operational amplifier to provide a balanced bipolar output.
 
 
 
In the 44 GHz BEM, each LNA consists of self designed MMIC amplifiers manufactured with the process ED02AH from OMMIC which employs a 0.2 μm gate length Pseudomorphic-High Mobility Transistor (P-HEMT) on GaAs.
 
The topology chosen for the band-pass filter is a third order Chebyshef band pass filter made on a PTFE substrate, based on microstrip coupled line structure.
 
The detector is composed by a hybrid reactive/passive matching network and a Schottky diode. A commercial Agilent beam-lead and zero-bias diode was selected.
 
The detector diode is followed by a low noise operational amplifier that provides most of the DC amplification. A second stage is implemented using an operational amplifier to provide a balanced bipolar output.
 
 
 
Table 9 below shows the values of the equivalent noise temperature for each flight model BEM at three different temperatures in the range of possible operating temperature. The large variability of the equivalent noise temperature of 44 GHz BEM units was due to their large dependence on the input matching network result, which was observed to be a very critical parameter, not easy to control during the assembly process of MMIC.
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 9. Equivalent noise temperature of the BEM Flight models in Kelvin. (One unit of each band is a Flight Spare). Estimated error: ± 20 K.'''
 
|-
 
|width="500" | [[File:bem1.jpg|thumb|center|500px|]]
 
|-
 
|}
 
 
 
The raw measurements of the output spectrum are used for the determination of the 1/f knee frequency. The results for the four channels of a 30 GHz BEM unit are given in the table below.
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 10. 1/f knee frequency (Hz) of 30 GHz BEM unit.'''
 
|-
 
|width="400" | [[File:bem2.jpg|thumb|center|160px|]]
 
|-
 
|}
 
 
 
The details of the design, development and verification of the 30 and 44 GHz back-end modules for the Planck Low Frequency Instrument can be found in  <cite>#artal2009</cite>.
 
 
 
The 70 GHz BEM is constructed of machined aluminium with separate filter, amplifier/detector assemblies and an overall housing for other circuits and components.
 
The FEM output signals are connected by waveguide from the Focal Plane Unit (FPU) assembly to the Back End Modules (BEM’s) housed adjacent to, the Data Acquisition Electronics (DAE) assembly. To maintain compatibility with the FEM’s, each BEM will accommodate, four receiver channels, from the four, waveguide outputs of each FEM. The BEM internal signal routes are not cross coupled and can be regarded as four identical parallel circuits.
 
 
Each BEM is constructed as two mirror halves. The two amplifier/detector assemblies each contain two amplifier/detector circuits. Each is supplied from one of a pair of printed circuit boards which also house two DC output amplifiers.
 
Each BEM is constructed as two mirror halves. The two amplifier/detector assemblies each contain two amplifier/detector circuits. Each is supplied from one of a pair of printed circuit boards which also house two DC output amplifiers.
  
The BEM filter characteristics hold very accurately for every channel in the six BEMs. The -3 dB pass band, 62-81 GHz, was the same in every filter within 0.5 GHz. The BEM frequency response was measured as a function of input microwave power. Also, the pass bands roll at almost exactly 63 GHz and 77 GHz. The linearity of the channel is very good as well, especially from -57 dBm upwards. The dynamic range was at least 15 dB from -57 dBm to -42 dBm.
+
The details of the design, development and verification of the 30 and 44 GHz back-end modules for the Planck Low Frequency Instrument can be found in{{BibCite|artal2009}}.  
In three cases, the BEMs fulfilled the power consumption requirement, while the limit was exceeded for the other three. For the total six BEMs, the limit, 3.6 W, was exceeded by approximately 140 mW.
+
The details of the design, development and verification of the 70 GHz back-end modules for the Planck Low Frequency Instrument can be found in{{BibCite|varis2009}}.
Table 7 above summarises the best, the worst and the average values of the key performance parameters. The shown uncertainties are based on worst case estimates.
+
Details are reported also in the corresponding [[LFIAppendix#Back End Modules (BEM)|Annex]] section.
 
 
The details of the design, development and verification of the 70 GHz back-end modules for the Planck Low Frequency Instrument can be found in <cite>#varis2009</cite>.  
 
  
 
==== ''4K Load'' ====
 
==== ''4K Load'' ====
  
The purpose of the 4 K reference load is to provide the radiometer with a stable reference signal. Reducing the input offset (the radiometric temperature difference between the sky and the reference load) reduces the minimum achievable radiometer 1/f noise knee frequency for a given amplifier fluctuation spectrum. A reference load temperature that matches the sky temperature (approximately 2.7 K) would be ideal.
+
The purpose of the 4 K reference load is to provide the radiometer with a stable reference signal. Reducing the input offset (the radiometric temperature difference between the sky and the reference load) reduces the minimum achievable radiometer 1/f noise knee frequency for a given amplifier fluctuation spectrum. A reference load temperature that matches the sky temperature (approximately 2.7 K) would be ideal.  
In the 4KRL design, the reference temperature is provided by the HFI outer radiation shield, at a temperature around 4K.
 
The 4KRL performance are reported in Table 11 below.
 
  
{| border="0" cellspacing="0" cellpadding="2" align="center"
+
Details of the design, characteristics and performance of the LFI 4K reference load units are given in{{BibCite|valenziano2009}} and in the corresponding section of the [[LFIAppendix#4K Load|Annexes]].
|+ '''Table 11. RF measured performance for the 4KRL: RH (+WaveGuide) Insertion Loss, RH (+WG) RL, RH (+WG) + RT Return Loss. 70 GHz performance have been measured using a representative Reference Horn and waveguide, since RHs are internal to FEMs: this value is reported in the table. RCAs 24-26 are the LFI 44 GHz channels, 27 and 28 the 30 GHz ones. M and S refer to Main and Side OMT arm, respectively.
 
<math>∗</math> Measured on the FM RTs and a representative Reference Horn.'''
 
|-
 
|width="600" | [[File:4krl.jpg|thumb|center|300px|]]
 
|-
 
|}
 
 
 
The 4K reference load unit is formed by single targets, one for each radiometer (two for each FEM). The horns used to couple to the 4 K reference load targets need to be relatively small because the targets themselves are small. An optimisation process produced a different horn design for each LFI band: their dimensions increase with reducing frequency. Due to the LFI Focal Plane design, where higher frequency radiometers (70 GHz) are placed around the HFI cryostat and the lower frequency radiometers (30 and 44 GHz) in a second row, the target mounting structure is separated in two parts, see Figure 5 below.
 
The upper one is located around the conical part of the HFI outer shield. Reference targets are mounted on a supporting structure, thermally and mechanically connected to the HFI outer shield. Each target faces a reference horn, two for each FEM. This ensemble is fixed to a support structure on the HFI 4K shield. Thermal link between the mounting structure and the HFI is obtained via fixation point only. Thermal washers are interposed to damp temperature fluctuations on targets induced by the HFI outer shield temperature oscillations.
 
The lower part is fixed in the cylindrical part. It is made with the same target geometry of the upper part, and it is fixed on the HFI shield. The reference horns face the loads and are connected to the FEMs through WGs.
 
Reference WGs and RH (Reference Horns) are either included in the FEM (70 GHz) or external to FEM (30 and 44
 
GHz).
 
 
 
[[File:4kload.jpg|thumb|center|400px|Figure 5. 4K reference load targets mounted on the HFI 4K shield]]  
 
 
 
Targets are formed of a back section, made of ECCOSORB CR117, which shows higher RF absorption but also high reflectivity. To reduce the target global reflectivity, a front section, assembled with an ECCOSORB specific cement to the back one, faces the radiometer Reference Horn. This last is casted from ECCOSORB CR110, whose RF reflectivity is lower than that of CR117. Target design is optimised to further reduce both reflectivity and leakage. Each target is metal backed and it is mounted in a metal enclosure.
 
 
 
Thermal tests were performed in the IASF-Bo 4K cryo facility, equipped with a GM cooler, with an heat lift up to 1.5 W at 4K. The setup simulated the real environment in the payload, where targets are mounted on the HFI 4K shield in front of the quasi-cylindrical LFI main frame at about 20 K. It was also used to test the susceptibility to fluctuations of the LFI.
 
  
The thermo-mechanical damping was evaluated from the transient test, inducing sinusoidal temperature fluctuation with periods of 60, 600, 667 (typical Sorption Cooler period) and 1000 seconds at the level of the attachment point of the loads on the support structures. The fluctuation at the level of the targets is then acquired and the transfer function (amplitude and phase) are estimated by the ratio of the amplitudes. The final results are summarized in the table 12.
+
=== Naming Convention ===
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 12. Thermal fluctuation damping measured for the reference loads at different frequencies.'''
 
|-
 
|width="800" | [[File:4krl_t.jpg|thumb|center|400px|]]
 
|-
 
|}
 
 
 
Details of the design and performance of the LFI 4K reference load units are given in <cite>#valenziano2009</cite>.
 
 
 
=== LFI Naming Convention ===
 
  
 
The naming of all the LFI elements is described in the previous sections but here is summarized again for clarity.  
 
The naming of all the LFI elements is described in the previous sections but here is summarized again for clarity.  
  
The 11 RCAs are labelled by a numbers from 18 to 28 as outlined in Figure 1, right panel. In each RCA, the two perpendicular linear polarisation components are labelled as ''M'' or ''S'' according to the arm of the OMT they are connected to (''Main'' or ''Side'', see lower-left inset of Figure 3).  
+
The 11 RCAs are labelled by a numbers from 18 to 28 as outlined in Fig. 1 in [[LFI overview]], right panel. In each RCA, the two perpendicular linear polarisation components are labelled as ''M'' or ''S'' according to the arm of the OMT they are connected to (''Main'' or ''Side'', see lower-left inset of Fig. 2).  
  
Each front-end amplifier (see upper-left inset of Figure 3) is labelled with codes ''1'', ''2'' so that the four outputs of the FEM LNAs can be named with the sequence: ''M1'', ''M2'' (radiometer ''M'') and ''S1'', ''S2'' (radiometer ''S'').  
+
Each front-end amplifier (see upper-left inset of Fig. 2) is labelled with codes ''1'', ''2'' so that the four outputs of the FEM LNAs can be named with the sequence: ''M1'', ''M2'' (radiometer ''M'') and ''S1'', ''S2'' (radiometer ''S'').  
  
Each radiometer has two output diodes (see upper-right inset of Figure 3) which are labelled with binary codes ''00'', ''01'' (radiometer ''M'') and ''10'', ''11'' (radiometer ''S''), so that the four outputs of each radiometric chain can be named with the sequence: ''M-00'', ''M-01'', ''S-10'', ''S-11''.
+
Each radiometer has two output diodes (see upper-right inset of Fig. 2) which are labelled with binary codes ''00'', ''01'' (radiometer ''M'') and ''10'', ''11'' (radiometer ''S''), so that the four outputs of each radiometric chain can be named with the sequence: ''M-00'', ''M-01'', ''S-10'', ''S-11''.
  
 
=== ''REBA'' ===
 
=== ''REBA'' ===
Line 472: Line 167:
 
There are two REBA boxes, one nominal and one redundant. The redundancy concept is cold, which means that both boxes are never ON at the same time; the operation of each unit shall be managed by the spacecraft switching-on the corresponding unit. The REBA ASW (Application SoftWare) is the same in each REBA box.
 
There are two REBA boxes, one nominal and one redundant. The redundancy concept is cold, which means that both boxes are never ON at the same time; the operation of each unit shall be managed by the spacecraft switching-on the corresponding unit. The REBA ASW (Application SoftWare) is the same in each REBA box.
  
Each REBA consists of the following subunits:
+
A detailed description of the Planck LFI REBA can be found in{{BibCite|herreros2009}} and in the corresponding section of the [[LFIAppendix#REBA|Annexes]].
* The Power Supply Unit (PSU) which feeds the REBA unit. It consists of a DC/DC converter that converts the primary power received from the spacecraft PDU to the secondary regulated voltages required only by the REBA and provides galvanic isolation towards the spacecraft side of the interface. The PSU DC/DC converter also receives the On-Board Clock (OBC) from the CDMS that is used to increment the internal On Board Time register. There is no software interface with the REBA ASW.
 
* The Data Acquisition Unit (DAU) performs the analogue to digital conversion of the analogue housekeeping data of the REBA itself (temperatures and voltages). The REBA ASW collects from the DAU the HK data.
 
* The Signal Processing Unit (SPU) is a computing subunit in charge of the reduction and compression of the science data and implements part of the REBA ASW, the SPU ASW (stored in the EEPROM located in the DPU board and transferred to the SPU by the DPU ASW). It receives the science data from the DAE through a IEEE 1355 link implemented in a SMCS chip. A second IEEE 1355 link is used to control by link the remote DAE SMCS chip. The third IEEE 1355 link communicates with the DPU. A “Data Ready” electrical signal is connected between DAE and the SPU, this signal produces an interruption in the SPU when the DAE is ready to transfer data.
 
* The Digital Processing Unit (DPU) is a computing subunit and implements part of the REBA ASW, the DPU ASW. The DPU is in charge of the control and monitoring of the instrument as well as the communication with the spacecraft (CDMS). It contains another SMCS chip with 3 IEEE 1355 links that communicate with the SPU, and the DAE. A MIL-STD 1553B link is used to communicate with the CDMS. One IEEE 1355 link is used by the DPU ASW to communicate with the DAE to control by link the SMCS chip of DAE, the second one is used to communicate with the DAE to transfer commands and HK and the third one is used by DPU ASW to communicate with the SPU (commands and TM). Two Reset electrical lines are provided by the DPU to reset each of the two SMCS chips of DAE. The DPU ASW is stored in the EEPROM.
 
 
 
A detailed description of the Planck LFI REBA can be found in <cite>#herreros2009</cite>.  
 
  
 
=== ''Instrument On-board Software'' ===
 
=== ''Instrument On-board Software'' ===
  
The REBA software is the on board software of LFI. It is installed in the two computing subunits of REBA: the DPU, responsible of the control and monitoring of the instrument and the interface with the spacecraft and; the SPU, responsible of the data reduction and compression.
+
The REBA software is the on board software of LFI. It is installed in the two computing subunits of REBA: the DPU (Digital Processing Unit), responsible of the control and monitoring of the instrument and the interface with the spacecraft and; the SPU (Signal Processing Unit), responsible of the data reduction and compression.
The REBA software can be classified (see Figure 6) into:
 
: 1. the REBA Start-up Software (SUSW), installed in the PROM memories, which is the bootstrap code to switch on both the subunits;
 
: 2. the Application Software (ASW), which performs the nominal operations of the REBA;
 
: 3. the REBA Low Level Software Drivers (LLSWDRV) which are functions provided to the ASW to access the hardware capabilities.
 
  
[[File:OBS.jpg|thumb|center|400px|Figure 6. REBA Software, high level product tree]]
+
Details can be found in the corresponding section of the [[LFIAppendix#Instrument On-board Software|Annexes]].  
 
 
The SPU SUSW and DPU SUSW, located in the PROM memories of SPU and DPU, respectively, are in charge of the booting of the subunits.
 
 
 
The REBA ASW performs the following main functions:
 
* SPU ASW reduction and compression of the scientific data;
 
* DPU ASW: control and monitoring of the instrument, interface with the spacecraft to transfer data and receive commands to/from ground, communication with the SPU SUSW during the start-up procedure to load the SPU ASW.
 
 
 
The REBA ASW checks periodically the following parameters:
 
:− Science TM rate produced on board in order to control the filling of the spacecraft mass memory;
 
:− CPU load of the SPU;
 
:− Focal Plane temperature sensors;
 
:− The communication links between REBA and DAE.
 
 
 
In case of deviations from nominal values, the REBA ASW activates autonomy functions that put the instrument in a safe state or recover from non-nominal situations. Autonomy functions allows to:
 
:- Re-enable, in some cases, previously disabled science processing;
 
:- Switch-off the Front End Unit by sending Disable RCA DC/DC commands to the DAE;
 
:- Try to resume the communication between REBA and DAE or ask the CDMS to switch off the RAA.
 
 
 
The DPU ASW reports the activation of any autonomous function by sending to the CDMS an event report.
 
The REBA monitors some LFI HK parameters in order to manage to some extent the safety of the instrument.
 
  
 
==== ''Reduction and Compression of Science Data'' ====
 
==== ''Reduction and Compression of Science Data'' ====
  
To asses stability against 1/f noise, the Low Frequency Instrument (LFI) on-board the Planck mission will acquire data at a rate much higher than the data rate allowed by the science telemetry bandwidth of 35.5 kbps. The data are processed by an on-board pipeline, followed on-ground by a decoding and reconstruction step, to reduce the volume of data to a level compatible with the bandwidth while minimizing the loss of information. The on-board processing of the scientific data used by Planck/LFI to fit the allowed data-rate is an intrinsically lossy process which distorts the signal in a manner which depends on a set of five free parameters (<math> N_{aver}, r_1, r_2, q, O \,</math>) for each of the 44 LFI detectors.  
+
To asses stability against 1/f noise, the Low Frequency Instrument (LFI) on-board the Planck mission will acquire data at a rate much higher than the data rate allowed by the science telemetry bandwidth of 35.5 kbps. The data are processed by an on-board pipeline, followed on-ground by a decoding and reconstruction step, to reduce the volume of data to a level compatible with the bandwidth while minimizing the loss of information. The on-board processing of the scientific data used by Planck/LFI to fit the allowed data-rate is an intrinsically lossy process which distorts the signal in a manner which depends on a set of five free parameters (<math> N_{aver}, r_1, r_2, q, O \,</math>) for each of the 44 LFI detectors.
Here we briefly describe the characteristics of this algorithm and the level of distortion introduced by the on-board processing as a function of these parameters.
+
A brief description of the characteristics of this algorithm and the level of distortion introduced by the on-board processing as a function of these parameters can be found in the corresponding section of the [[LFIAppendix#Reduction and Compression of Science Data|Annexes]], a full description of the Planck LFI on-board data handling system and the tuning and optimization method of the on-board processing chain in{{BibCite|maris2009}}.
A full description of the Planck LFI on-board data handling system and the tuning and optimization method of the on-board processing chain can be found in <cite>#maris2009</cite>.  
 
  
The strategy adopted to fit into the bandwidth relies on three on-board processing steps: downsampling, pre-processing the data to ensure loss-less compression, and loss-less compression itself. To demonstrate these steps, a model of the input signal shall be used. It has to be noted that while the compression is loss-less, the pre-processing is not, due to the need to rescale the data and convert them in integers, (a process named data re-quantizzation). However, the whole strategy is designed to asses a strict control of the way in which lossy operations are done, of the amount of information loss in order to asses optimal compression rate with minimal information loss.
+
The strategy adopted to fit into the bandwidth relies on three on-board processing steps: downsampling, pre-processing the data to ensure loss-less compression, and loss-less compression itself. To demonstrate these steps, a model of the input signal shall be used. It has to be noted that while the compression is loss-less, the pre-processing is not, due to the need to rescale the data and convert them in integers, (a process named data re-quantization). However, the whole strategy is designed to asses a strict control of the way in which lossy operations are done, of the amount of information loss in order to asses optimal compression rate with minimal information loss.
 
 
A schematic representation of the sequence in which these steps are applied on-board and whenever possible reversed on-ground is given in figure 7 below.
 
 
 
[[File:compression.jpg|thumb|center|600px|Figure 7. Schematic representation of the scientific onboard and ground processing for the Planck/LFI. Cyan boxes represent REBA operations, yellow boxes ground operations. Green pads specify the parameters needed by each operation. TOI could be produced both in undifferentiated form (<math> T_{sky}, \, T_{load} \, </math> stored separately) or in differentiated form.]]
 
 
 
The figure refers to a single radiometer chain and is ideally splitted into two parts: the upper part depicts the on-board processing with cyan boxes denoting the main steps. The corresponding on-ground processing is depicted in the lower part with the main steps colored in yellow. Green pads represents the processing parameters. The first four of them are referred to as REBA parameters, and they are applied both on-board and on-ground. The parameters are: the number of ADC raw samples to be coadded to form an instrumental sample, <math>N_{aver}</math>, the two mixing parameters <math>r_1, r_2 </math>, the offset <math> O</math> to be added to data after mixing and prior to re-quantization, and the re-quantization step <math>q</math>. It is important to note that the on-board parameters are set by telecommands and are stamped in each scientific packet. The gain modulation factor, <math>r</math> (see Eq. \ref{eq:erre1} in [[LFI design, qualification, and performance#Radiometer Chain Assembly (RCA)|RCA]] section above), is a parameter of the ground processing and is computed from the total power data received on ground. The final products in the form of Time Ordered Data (TOI) either in total power or differentiated are stored in an archive represented by the light-blue cylinder.
 
 
 
All the needed optimization steps are performed by an automated software tool, the Onboard Computing Analysis (OCA), which simulates the on-board processing, explores the space of possible combinations of parameters, and produces a set of statistical indicators, among them: the compression rate <math>C_r</math> and the processing noise <math>\epsilon_Q</math>. For Planck/LFI it is required that <math>C_r = 2.4</math> while, as for other systematics, <math>\epsilon_Q \,</math> would have to be less than 10% of rms of the instrumental white noise.
 
An analytical model is developed that is able to extract most of the relevant information on the processing errors and the compression rate as a function of the signal statistics and the processing parameters to be tuned. This model is of interest for the instrument data analysis to asses the level of signal distortion introduced in the data by the on-board processing.
 
 
 
Once the instrument is completed tuned and stable, a tuning process is applied in order to optimize the REBA parameters. The procedure foresees to acquire chunks of about 15 minutes of ''averaged data'' to be analyzed by OCA. After setting the (optimized) REBA parameters, another session of 15 minutes of acquisition is applied, this time with the nominal processing.
 
 
 
The values for the optimal REBA parameters are mainly determined by the frequency of the radiometric channel with some dispersion from detector to detector. Table 13 below gives representative median values for <math>r_1, \, r_2, \, q  \, </math> from on ground System Level tests (CSL) as well as for the quantities in figure 8 below and the resulting data rate. <math> O</math>  is omitted since it is the most variable parameter and it has no significant impact on <math>\epsilon_q</math> and <math>C_r</math>. Table 13 below reports also the number of detectors for each frequency channel, the <math>N_{aver}</math> values which are kept constant, the compressed data rate per detector, per frequency channel and for the instrument as a whole. Quantities are reported in the form <math>x ± \delta x</math> where <math>\delta x</math> represents the standard deviation taken as a measure of the internal dispersion of <math>x</math> within the given subset of detectors, this number must not be interpreted as an error and it must not be propagated.
 
 
 
The performance has been verified against the requirements with the result that the required data rate of 35.5 kbps has been achieved while keeping the processing error at a level of 3.8% of the instrumental white noise and well below the target 10% level.
 
 
 
[[File:compr1.jpg|thumb|center|500px|Figure 8. Results for a typical session of REBA parameters tuning during the CSL test campaign. From top to bottom the figure reports for each detector the mean <math>C_r, \, \epsilon_{q,sky}/\sigma_{sky}, \, \epsilon_{q,load}/\sigma_{load}, \, \epsilon_{q,diff}/\sigma_{diff} \, </math> where <math>\sigma_{diff}</math> is the r.m.s. of the differentiated data. The red line in background of the top frame denotes the target <math> C_r^{Tgt} = 2.4</math>. Values are represented by bars. Light-bars are the results from the calibration phase, where raw data from the instrument are processed by OCA. Dark-bars are results from the verification phase, where processing is performed on-board. The second frame from Top gives an example for detector 00 of Feed-Horn #19. Feed-horns are numbered according to the internal Planck/LFI convention assigning at Planck/LFI the Feed-Horns numbers from #18 to #28. Detectors belonging to the same Feed-Horn are grouped together as shown in the third frame from top.]]
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 13. Representative REBA Parameters, the measured <math>C_r</math> and relative processing errors from the CSL tests for Planck/LFI. Detectors are grouped by frequency channel, for each quantity x the table reports its group median and group standard deviation <math>\delta x</math> as a measure of the group internal dispersion, <math>\delta x</math> must be not considered as an error.'''
 
|-
 
|width="400" | [[File:compr2.jpg|thumb|center|500px|]]
 
|-
 
|}
 
 
 
In flight the procedure is to acquire continuously data by using the nominal processing. Short chunks of unprocessed data is daily acquired in turn from each detector. The comparison of unprocessed with processed data allows to monitor of the processing error. In addition the REBA tuning might be repeated daily on the chunk of unprocessed data in order to test whether some REBA parameters on-board the satellite should be changed or not.
 
  
 
=== ''Instrument Operations'' ===
 
=== ''Instrument Operations'' ===
  
==== ''LFI Operational Modes'' ====
+
==== ''Operational Modes'' ====
  
 
The operations of the LFI are designed to be automatic and require little if any intervention from the ground. A small amount of commands is required for operating the instrument and eventually for diagnostic and reconfiguration purposes.
 
The operations of the LFI are designed to be automatic and require little if any intervention from the ground. A small amount of commands is required for operating the instrument and eventually for diagnostic and reconfiguration purposes.
Line 552: Line 190:
 
Within the Normal Science Mode the instrument can be configured in order to fit with different science or diagnostic needs without changing the power consumption and thus the temperature in the FPU. Changes in power consumption in the FPU are minimised and should occur only in the case that failures in the radiometers that could create interference problems require an RCA to be switched off. Power adjustments on the first stage of the HEMT amplifiers which are contemplated, require extremely small power level variations.
 
Within the Normal Science Mode the instrument can be configured in order to fit with different science or diagnostic needs without changing the power consumption and thus the temperature in the FPU. Changes in power consumption in the FPU are minimised and should occur only in the case that failures in the radiometers that could create interference problems require an RCA to be switched off. Power adjustments on the first stage of the HEMT amplifiers which are contemplated, require extremely small power level variations.
  
[[File:LFI_OpsMode.jpg|thumb|center|400px| Figure 9. LFI Operating Modes and their nominal transitions]]
+
A brief summary of the LFI Operational Modes and the transitions between them is given in the corresponding section of the [[LFIAppendix#LFI Operational Modes|Annexes]].
 
 
A scheme of the nominal transitions between the LFI Operation Modes are shown in Figure 9, a brief summary is given below.
 
:1. OFF MODE: During this operating mode the instrument is completely off for example during the launch.
 
:2. STAND-BY: During this mode only the REBA can be operated. It is the first interface to the instrument whenever the LFI is switched on. When the instrument is in this mode the RAA must be OFF because no data can be received and no control is possible on the radiometer chains.
 
:3. DAE SET-UP: During this mode the REBA and the DAE are ON, but no radiometer chains are active. Nevertheless science data can be generated and contain only the background noise of the instrument.
 
:4. NORMAL SCIENCE: During this mode the RAA is seen by the REBA as a set of 44 independent instruments. This means that each instrument can be operated, by the same SW, in different modes without affecting the LFI modes. Science data from the DAE are continuously acquired by the REBA that decides, on the basis of the activation table, which packets (either science or diagnostic) have to be produced. The whole set of HK is continuously acquired and sent to ground. This mode is the nominal for the LFI observation operations.
 
:5. EXTENDED SCIENCE: This mode is similar to the previous except that for the total amount of telemetry sent to the ground. In fact this mode shall be used when, in particular cases, (e.g. calibration…) a larger telemetry rate is needed and made available by an agreement with HFI and the CDMS.
 
 
 
During launch, for contingency situations and/or to allow diagnostics of other spacecraft subsystems (e.g. HFI or others) LFI is in the OFF mode. When, upon a command from ground the REBA is powered on, the instrument is in its STAND-BY mode. A step-by-step bootstrap procedure commanded from ground documented by HK is initialized to turn the DAE on. This sets-up the internal communications, and allows the LFI subsystems to collect and deliver a full set of HK. The instrument is in DAE SET-UP mode. The following step is to upload from ground the DAE settings and processing parameters; then, to switch on the RCA on ground command. At this stage, on ground command, the acquisition of science data can start. A further step is needed to move to NORMAL SCIENCE, namely start processing and compressing the science raw data. When this is accomplished, science packets can be sent to ground.
 
  
 +
<!--
 
==== ''In-flight Operations'' ====
 
==== ''In-flight Operations'' ====
  
Line 571: Line 201:
  
 
TBW
 
TBW
 +
-->
  
 
+
==<span id="LFITests">Ground Tests</span>==
== LFI Ground Tests ==
+
During its development, the LFI flight model was calibrated and tested at various integration levels from sub-systems{{BibCite|davis2009}} to individual integrated receivers {{PlanckPapers|villa2010}} and the whole receiver array {{PlanckPapers|mennella2010}}. In every campaign we performed tests according to the following classification:
 
 
During its development, the LFI flight model was calibrated and tested at various integration levels from sub-systems <cite>#davis2009</cite> to individual integrated receivers <cite>#villa2010</cite> [{{PPreLaunch|6|link=[Planck pre-launch status: Calibration of the Low Frequency Instrument flight model radiometers}}] and the whole receiver array <cite>#mennella2010</cite> [{{PPreLaunch|5|link=Planck pre-launch status: Low Frequency Instrument calibration and expected scientific performance}}]. In every campaign we performed tests according to the following classification:
 
  
 
* ''Functionality tests'', performed to verify the instrument functionality.
 
* ''Functionality tests'', performed to verify the instrument functionality.
Line 582: Line 211:
 
* ''Susceptibility tests'', to characterise instrument susceptibility to thermal and electrical variations.
 
* ''Susceptibility tests'', to characterise instrument susceptibility to thermal and electrical variations.
  
Where possible, the same tests were repeated in several test campaigns, in order to ensure enough redundancy and confidence in the instrument behaviour repeatability. A matrix showing the instrument parameters measured in the various test campaigns is provided in Table 1 of <cite>#mennella2010</cite> [{{PPreLaunch|5|link=Planck pre-launch status: Low Frequency Instrument calibration and expected scientific performance}}].
+
Where possible, the same tests were repeated in several test campaigns, in order to ensure enough redundancy and confidence in the instrument behaviour repeatability. A matrix showing the instrument parameters measured in the various test campaigns is provided in Table 1 of {{PlanckPapers|mennella2010}}.
  
 
The ground test campaign was developed in three main phases: cryogenic tests on the individual RCAs, cryogenic tests on the integrated receiver array (the so-called radiometer array assembly, RAA) and system-level tests after the integration of the LFI and HFI instruments onto the satellite. The first two phases were carried out at the Thales Alenia Space - Italia laboratories located in Vimodrone (Milano, Italy) (note that receiver tests on 70 GHz RCAs were carried out in Finlad, at Yilinen laboratories), system level tests (SLT) were conducted in a dedicated cryofacility at the Centre Spatiale de Liege (CSL) located in Liege (Belgium).  
 
The ground test campaign was developed in three main phases: cryogenic tests on the individual RCAs, cryogenic tests on the integrated receiver array (the so-called radiometer array assembly, RAA) and system-level tests after the integration of the LFI and HFI instruments onto the satellite. The first two phases were carried out at the Thales Alenia Space - Italia laboratories located in Vimodrone (Milano, Italy) (note that receiver tests on 70 GHz RCAs were carried out in Finlad, at Yilinen laboratories), system level tests (SLT) were conducted in a dedicated cryofacility at the Centre Spatiale de Liege (CSL) located in Liege (Belgium).  
  
In Table 14 below we list the temperature of the main cold thermal stages during ground tests compared to in-flight nominal values. These values show that system-level tests were conducted in conditions that were as much as possible flight-representative, while results obtained during RCA and RAA tests needed to be extrapolated to flight conditions to allow comparison. Details about the RCA test campaign are discussed in <cite>#villa2010</cite> [{{PPreLaunch|6|link=Planck pre-launch status: Calibration of the Low Frequency Instrument flight model radiometers}}] while the RAA tests and the extrapolation methods are presented in <cite>#mennella2010</cite> [{{PPreLaunch|5|link=Planck pre-launch status: Low Frequency Instrument calibration and expected scientific performance}}].
+
In Table 1 below we list the temperature of the main cold thermal stages during ground tests compared to in-flight nominal values. These values show that system-level tests were conducted in conditions that were as much as possible flight-representative, while results obtained during RCA and RAA tests needed to be extrapolated to flight conditions to allow comparison. Details about the RCA test campaign are discussed in {{PlanckPapers|villa2010}} while the RAA tests and the extrapolation methods are presented in {{PlanckPapers|mennella2010}}}.
  
 
{| border="1" cellspacing="0" cellpadding="2" align="center"
 
{| border="1" cellspacing="0" cellpadding="2" align="center"
|+ '''Table 14. Temperatures of the main cold stages during the various ground test campaigns compared to in-flight nominal values'''
+
|+ '''Table 1. Temperatures of the main cold stages during the various ground test campaigns compared to in-flight nominal values'''
 
|-
 
|-
 
!scope="col"| Temperature  
 
!scope="col"| Temperature  
Line 616: Line 245:
 
|-
 
|-
 
|}
 
|}
 
Cryogenic system-level tests, performed at the cryo-facility of the Centre Spatial de Liège (CSL), were split into three parts:
 
:1. ''Thermal balance'', to validate the overall thermal mathematical model. The ground vacuum test equipment simulated the space environment.
 
:2. ''System cryogenic test'', to check and optimise the satellite and instrument performance working at nominal temperatures.
 
:3. ''Thermal cycling test'', to check the reliability of all electronics equipment and instruments to temperature variations (note that to allow the thermal control of the Service Vehicle Module (SVM), the warm part of the spacecraft was surrounded by a cryogenic shroud at a temperature lower than 100 K. The temperature of the shrouds was adjustable in order to allow the thermal cycling of the SVM during the tests. The temperature ranged between the two extreme values of <math>20^\circ</math>C to <math>100^\circ </math>C).
 
  
 
During the various test campaigns the instrument was switched off and moved several times in a time period of about three years. A series of functional tests were always repeated at each location and also in flight, in order to verify the instrument functionality and the response repeatability. No failures or major problems have been identified due to transport and integration procedures.
 
During the various test campaigns the instrument was switched off and moved several times in a time period of about three years. A series of functional tests were always repeated at each location and also in flight, in order to verify the instrument functionality and the response repeatability. No failures or major problems have been identified due to transport and integration procedures.
  
The expected Planck LFI scientific performance, resulting mainly from cryogenic system level tests, are described in <cite>#mennella2010</cite> [{{PPreLaunch|5|link=Planck pre-launch status: Low Frequency Instrument calibration and expected scientific performance}}].
+
The expected Planck LFI scientific performance, resulting mainly from cryogenic system level tests, are described in {{PlanckPapers|mennella2010}}.
 
 
== LFI In-flight Calibration ==
 
 
 
The Planck cryo-chain <cite>#planck2011-1-3</cite> [{{PEarly|2|link=Planck early results. The thermal performance of Planck}}] is composed by three coolers: a 20 K Hydrogen sorption cooler, which is passively pre-cooled by the <math>3^{\rm rd}</math> V-groove radiator, cools the LFI focal plane and pre-cools the HFI 4K cooler; a Stirling 4K cooler that cools the HFI box and feed-horns and provides a 4K blackbody reference signal to the LFI receivers; a 0.1 K dilution cooler, which is pre-cooled by the 4K cooler and cools the HFI bolometer filters to <math>\sim 1.6</math>K and the HFI bolometer detectors to ~0.1 K. The cooldown of the HFI 4K stage, in particular, was key during CPV for the LFI as it provided a variable input signal that was exploited during bias tuning.
 
 
 
The LFI CPV started on June, <math>4^{\rm th} \;</math> 2009 and lasted until August, <math>12^{\rm th} \;</math> when Planck started scanning the sky in nominal mode. At the onset of CPV, the active cooling started when the radiating surfaces on the payload module reached their working temperatures (~50 K on the <math>3^{\rm rd} \;</math> V-groove, and ~40 K on the reflectors) by passive cooling. This was achieved during the transfer phase. Nominal temperatures were achieved on July, <math>3^{\rm rd} \;</math> 2009, when the dilution cooler temperature reached 0.1 K <cite>#planck2011-1-3, meinhold2009</cite> [{{PEarly|2|link=Planck early results. The thermal performance of Planck}}] (see Figure 5 below).
 
 
 
The CPV was carried out in four phases (see Table 15 below for a summary of the overall CPV test campaign):
 
* LFI switch on and basic functionality verification,
 
* Tuning of front-end biases and back-end electronics,
 
* Preliminary calibration tests,
 
* Thermal tests.  
 
  
{| border="0" cellspacing="0" cellpadding="2" align="center"
+
== <span id="LFICalibration">In-flight Calibration</span>==
|+ '''Table 15. LFI CPV tests'''
 
|-
 
|width="300" | [[File:flighttest.jpg|thumb|center|500px|]]
 
|-
 
|}
 
  
 +
The LFI Commissioning and Calibration and Performance Verification (CPV) phases started on June, <math>4^{\rm th} \;</math> 2009 and lasted until August, <math>12^{\rm th} \;</math> when Planck started scanning the sky in nominal mode. At the onset of CPV, the active cooling started when the radiating surfaces on the payload module reached their working temperatures (~50 K on the <math>3^{\rm rd} \;</math> V-groove, and ~40 K on the reflectors) by passive cooling. This was achieved during the transfer phase. Nominal temperatures were achieved on July, <math>3^{\rm rd} \;</math> 2009, when the dilution cooler temperature reached 0.1 K {{PlanckPapers|planck2011-1-3}}{{BibCite|meinhold2009}}. The cooldown of the HFI 4K stage (see Fig. 4 below), was key during CPV for the LFI as it provided a variable input signal that was exploited during bias tuning.
  
[[File:FUNCT_tests_schedule_vs_K-eps-converted-to.jpg|thumb|center|500px|Figure 10. Functional tests performed during CPV against timeline. Curves from thermal sensors monitoring the 4K stage and the FPU temperature are superimposed.]]
+
The LFI Commissioning and CPV was carried out in four phases:  
 +
* LFI switch on and basic functionality verification (Commissioning),
 +
* Tuning of front-end biases and back-end electronics (CPV),
 +
* Preliminary calibration tests (CPV),
 +
* Thermal tests (CPV).  
  
<cite>#gregorio2013</cite>
+
[[File:FUNCT_tests_schedule_vs_K-eps-converted-to.jpg|thumb|center|460px|'''Figure 4. Functional tests performed during CPV against timeline. Curves from thermal sensors monitoring the 4K stage and the FPU temperature are superimposed.''']]
  
TBW
+
Details of the LFI Commissioning and CPV test campaign are given in{{BibCite|gregorio2013}}.
  
== LFI Performance ==
+
==<span id="LFIPerformance">Performance Summary</span>==
  
  
Line 662: Line 274:
 
To map the beam, each sample in the selected timelines was projected in the <math> (u, \, v)</math>-plane perpendicular to the nominal line-of-sight (LOS) of the telescope (and at 85◦ to the satellite spin axis). The <math> u</math>  and <math> v </math> coordinates are defined in terms of the usual spherical coordinates <math> (θ, φ)</math> :
 
To map the beam, each sample in the selected timelines was projected in the <math> (u, \, v)</math>-plane perpendicular to the nominal line-of-sight (LOS) of the telescope (and at 85◦ to the satellite spin axis). The <math> u</math>  and <math> v </math> coordinates are defined in terms of the usual spherical coordinates <math> (θ, φ)</math> :
  
: <math> u = sinθ \, cosφ, </math>  
+
: <math> u = \sin θ \, \cos φ, </math>  
: <math> v = sinθ \, sinφ. </math>  
+
: <math> v = \sin θ \, \sin φ. </math>  
  
To increase the signal-to-noise ratio, data were binned in an angular region of 2′ for the 70 GHz channels and 4′ for the 30 and 44 GHz channels. We recovered all beams down to −20 dB from the peak. An elliptical Gaussian was fit to each beam for both M and S radiometers. The FWHM given in table 16 is the square root of the product of the major axis and minor axis FWHMs of the individual beams, averaged between M and S radiometers. The uncertainties in Table 16 are the standard deviation of the mean of the 1σ statistical uncertainties of the fit. Differences between the M and S beams caused by optics and receiver non-idealities are inevitable at some level, but they appear to be well within the statistical uncertainties, and for the purposes of point-source extraction relevant for this paper, the beams may be considered identical. Table 16 (<cite>#planck2011-1-4 </cite> [{{PEarly|3|link=Planck early results. First assessment of the Low Frequency Instrument in-flight performance}}]) gives the typical FWHM and ellipticity averaged over each frequency channel. Exhaustive details on all LFI beam parameters are presented in the LFI data processing section - [[Beams LFI|Beams]].
+
To increase the signal-to-noise ratio, data were binned in an angular region of 2′ for the 70 GHz channels and 4′ for the 30 and 44 GHz channels. We recovered all beams down to −20 dB from the peak. An elliptical Gaussian was fit to each beam for both M and S radiometers. Differences between the M and S beams caused by optics and receiver non-idealities are inevitable at some level, but they appear to be well within the statistical uncertainties, and for the purposes of point-source extraction, the beams may be considered identical. For the details of the typical FWHM and ellipticity averaged over each frequency channel, refer to{{PlanckPapers|planck2011-1-4}}. Exhaustive details on all LFI beam parameters are presented in the LFI data processing section - [[Beams LFI|Beams]].
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 16. LFI beam FWHM and mean ellipticity measured in flight from the first Jupiter pass.'''
 
|-
 
|width="600" | [[File:beam.jpg|thumb|center|360px|]]
 
|-
 
|}
 
  
 
==== ''Photometric Calibration''====
 
==== ''Photometric Calibration''====
  
Photometric calibration, i.e., conversion from voltage to antenna temperature, is performed for each radiometer after total power data have been cleaned of 1 Hz frequency spikes (see the LFI data processing section - [[TOI processing LFI#Spikes Removal|Spikes Removal]] section and  <cite>#planck2011-1-6 </cite> [{{PEarly|3|link=Planck early results. The Low Frequency Instrument data processing}}]), and differenced. Here we report a brief overview of the photometric calibration, for the details see the LFI data processing section - [[TOI processing LFI#Photometric Calibration|Photometric Calibration]].
+
Photometric calibration, i.e., conversion from voltage to antenna temperature, is performed for each radiometer after total power data have been cleaned of 1 Hz frequency spikes (see the LFI data processing section - [[TOI processing LFI#Spikes Removal|Spikes Removal]] section and  {{PlanckPapers|planck2011-1-6 }}, and differenced. Here we report a brief overview of the photometric calibration, for the details see the LFI data processing section - [[TOI processing LFI#Photometric Calibration|Photometric Calibration]].
  
 
Our calibrator is the well-known dipole signal induced by Earth and spacecraft motions with respect to the CMB rest frame. The largest calibration uncertainty comes from the presence of the Galaxy and of the CMB anisotropies in the measured signal. We therefore use an iterative calibration procedure in which the dipole is fitted and subtracted, producing a sky map that is then removed from the original data to enhance the dipole signal for the next iteration. Typically, convergence is obtained after a few tens of iterations.
 
Our calibrator is the well-known dipole signal induced by Earth and spacecraft motions with respect to the CMB rest frame. The largest calibration uncertainty comes from the presence of the Galaxy and of the CMB anisotropies in the measured signal. We therefore use an iterative calibration procedure in which the dipole is fitted and subtracted, producing a sky map that is then removed from the original data to enhance the dipole signal for the next iteration. Typically, convergence is obtained after a few tens of iterations.
Line 685: Line 290:
  
 
where <math>\theta_{axis}</math> is the angle between the spacecraft axis and the overall dipole axis (solar + orbital).
 
where <math>\theta_{axis}</math> is the angle between the spacecraft axis and the overall dipole axis (solar + orbital).
In this equation, the absolute calibration uncertainty is dominated by the uncertainty in <math>T_{Sun}</math> = 3.355 mK ± 0.008 mK <cite>hinshaw2009</cite>, which is known to about 0.2%. The modulation of the orbital dipole by the Earth motion around the Sun is known with an uncertainty almost three orders of magnitude smaller; however, at least one complete Planck orbit is needed for its measurement.   
+
In this equation, the absolute calibration uncertainty is dominated by the uncertainty in <math>T_{Sun}</math> = 3.355 mK ± 0.008 mK{{BibCite|hinshaw2009}}, which is known to about 0.2%. The modulation of the orbital dipole by the Earth motion around the Sun is known with an uncertainty almost three orders of magnitude smaller; however, at least one complete Planck orbit is needed for its measurement.   
 
The accuracy of our current calibration can be estimated by taking into account two components: 1) the statistical uncertainty in the regions of weak dipole; and 2) the systematic uncertainty caused by neglecting gain fluctuations that occur on periods shorter than the smoothing window. In our calibration procedure the gain is estimated for every pointing period: if we call <math> G_i </math> the gain estimate from the <math>i_{th}</math> pointing period we have that the associated uncertainty is
 
The accuracy of our current calibration can be estimated by taking into account two components: 1) the statistical uncertainty in the regions of weak dipole; and 2) the systematic uncertainty caused by neglecting gain fluctuations that occur on periods shorter than the smoothing window. In our calibration procedure the gain is estimated for every pointing period: if we call <math> G_i </math> the gain estimate from the <math>i_{th}</math> pointing period we have that the associated uncertainty is
  
Line 694: Line 299:
  
 
<math> \label{eq:cal3} \delta G |_{stat} = \frac{\delta G}{\sqrt{M}} = \frac{1}{\sqrt{M}}   
 
<math> \label{eq:cal3} \delta G |_{stat} = \frac{\delta G}{\sqrt{M}} = \frac{1}{\sqrt{M}}   
  \sqrt{\frac{ \Sigma_{i=1}^N (G_i-<G>)^2 }{N-1} } </math>  
+
  \sqrt{\frac{ \Sigma_{i=1}^N (G_i-<G>)^2 }{N-1} } </math>
 
 
Table 17 lists the largest statistical uncertainties in four time windows (days 100–140, 280–320, 205–245, 349–389), the first two corresponding to minimum and the second two to maximum dipole response. In order to provide conservative estimates we have always chosen a value for <math>M</math>  corresponding to the number of pointings in 5 days also in the cases where a 30-day smoothing window was used.
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 17. Worst case relative calibration uncertainties.'''
 
|-
 
|width="500" | [[File:calib.jpg|thumb|center|360px|]]
 
|-
 
|}
 
  
 
==== ''Noise Properties''====
 
==== ''Noise Properties''====
Line 712: Line 308:
  
 
where <math>P( f )</math> is the power spectrum and <math>α ≈ −1</math>.
 
where <math>P( f )</math> is the power spectrum and <math>α ≈ −1</math>.
In this model, noise properties are characterised by three parameters, the white noise limit <math>\sigma</math>, the knee frequency <math>f_{knee}</math>, and the exponent of the <math>1/ f</math> component <math>\alpha</math>, also referred to as slope. Here we give noise performance estimates based on one year of operations, details of the analysis are given in LFI data processing section - [[TOI-Noise LFI|Noise Estimation]] and in  
+
In this model, noise properties are characterised by three parameters, the white noise limit <math>\sigma</math>, the knee frequency <math>f_{knee}</math>, and the exponent of the <math>1/ f</math> component <math>\alpha</math>, also referred to as slope. Here we give noise performance estimates based on one year of operations, details of the analysis are given in LFI data processing section - [[TOI processing LFI#Noise|Noise estimation]] and in  
<cite>#planck2011-1-6, planck2011-1-4 </cite> [{{PEarly|3|link=Planck early results. The Low Frequency Instrument data processing}}, {{PEarly|3|link=Planck early results. First assessment of the Low Frequency Instrument in-flight performance}}].
+
{{PlanckPapers|planck2011-1-6}}{{PlanckPapers| planck2011-1-4}}.
  
 
Noise properties have been calculated following two different and complementary approaches: 1) fitting equation above to time-ordered data for each radiometer; and 2) building normalised noise maps by differencing data from the first half of the pointing period with data from the second half of the pointing period to remove the sky signal (“jackknife” data sets).
 
Noise properties have been calculated following two different and complementary approaches: 1) fitting equation above to time-ordered data for each radiometer; and 2) building normalised noise maps by differencing data from the first half of the pointing period with data from the second half of the pointing period to remove the sky signal (“jackknife” data sets).
  
Results for  <math>\sigma, \, f_{knee} </math>, and  <math>\alpha </math>, after one year of operations for all LFI radiometers, are given in Tables 17 and 18 below. Typical uncertainties are ∼0.5% for the white noise, between 5 and 10% for the slope, and between 10 and 20% for the knee frequency. Comparing the noise power spectra for all 22 LFI radiometers with their best-fit model, we found good agreement.
+
Typical uncertainties are ∼0.5% for the white noise, between 5 and 10% for the slope, and between 10 and 20% for the knee frequency.
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 17. White noise sensitivities for the LFI radiometers.'''
 
|-
 
|width="500" | [[File:noise.jpg|thumb|center|400px|]]
 
|-
 
|}
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 18. Knee frequency and slope for the LFI radiometers.'''
 
|-
 
|width="500" | [[File:kneef.jpg|thumb|center|550px|]]
 
|-
 
|}
 
  
 
==== ''White Noise Sensitivity''====
 
==== ''White Noise Sensitivity''====
  
As detailed in <cite>#planck2011-1-4</cite> [{{PEarly|3|link=Planck early results. First assessment of the Low Frequency Instrument in-flight performance}}],
+
Details of the white noise sensitivity can be found in {{PlanckPapers|planck2011-1-4}}.  
figure 13 compares the calibrated white noise sensitivity for the 22 LFI radiometers calculated from flight data and during ground tests performed both at instrument and satellite level. Error bars reported for values measured in flight and during satellite tests are statistical uncertainties derived from calculations performed on about 20 one-hour blocks of on-ground satellite data and one year of in-flight data. Error bars reported for values measured at instrument level, instead, represent the uncertainty between two different methods used to extrapolate the white noise sensitivity measured at test conditions (∼20 K input and ∼26 K front-end temperature) to flight conditions (∼2 K input and ∼20 K front-end temperature).
 
Figure 13 shows general agreement in the sensitivity calculated in various test campaigns, with two outstanding exceptions, radiometers LFI24M and LFI21S, which show significantly improved noise levels in-flight. This resulted from an incorrect bias setting of these radiometers during ground tests, which was resolved during in-flight tuning.
 
In figure 13 values for LFI18M and LFI24M measured at instrument-level are not reported because these two radiometers failed. LFI18M was replaced with a spare unit and LFI24M was repaired before instrument delivery.
 
  
[[File:sensitivity.jpg|thumb|center|600px| Figure 11. Comparison of white noise sensitivity values calculated in flight and on ground during the satellite-level and instrument-level test campaigns. Values for LFI18M and LFI24M measured at instrument-level are not reported because these two radiometers failed before instrument delivery and were replaced and repaired, respectively.]]
+
Table 2 summarizes the sensitivity numbers calculated during the first year of operations using methods and procedures described in detail in {{PlanckPapers|planck2011-1-6}}, compared with scientific requirements. The measured sensitivity is in very good agreement with pre-launch expectations. While the white noise moderately exceeds the design specification, this performance is fully in line with the LFI science objectives.
  
Table 19 summarizes the sensitivity numbers calculated during the first year of operations using methods and procedures described in detail in <cite>#planck2011-1-6</cite> [{{PEarly|3|link=Planck early results. The Low Frequency Instrument data processing}}], compared with scientific requirements. The measured sensitivity is in very good agreement with pre-launch expectations. While the white noise moderately exceeds the design specification, this performance is fully in line with the LFI science objectives.
+
{| border="1" cellspacing="0" cellpadding="2" align="center"
 
+
|+ '''Table 2. White noise sensitivity of the LFI frequency channels compared with requirements'''
{| border="0" cellspacing="0" cellpadding="2" align="center"
+
|-
|+ '''Table 19. White noise sensitivity of the LFI frequency channels compared with requirements.'''
+
!scope="col"| Channel
 +
!scope="col"| Measurement [<math>\mu</math>K<math>_{CMB}\,</math> s<math>^{1/2}</math>]
 +
!scope="col"| Requirement [<math>\mu</math>K<math>_{CMB}\,</math> s<math>^{1/2}</math>]
 +
|-
 +
|width="120" | 70 GHz
 +
|width="100" | 152.5
 +
|width="100" | 119
 +
|-
 +
|width="120" | 44 GHz
 +
|width="100" | 173.1
 +
|width="100" | 119
 
|-
 
|-
|width="500" | [[File:stab1.jpg|thumb|center|400px|]]
+
|width="120" | 30 GHz
 +
|width="100" | 146.8
 +
|width="100" | 119
 
|-
 
|-
 
|}
 
|}
Line 756: Line 347:
 
==== ''Spectral Response''====
 
==== ''Spectral Response''====
  
The in-band receiver response has been thoroughly modelled and measured for all the LFI detectors during ground tests. The complete set of bandpass curves has been published in <cite>#zonca2009</cite> where all the details of the LFI radiometer's spectral response are given. From each curve we have derived the effective centre frequency according to:
+
The in-band receiver response has been thoroughly modelled and measured for all the LFI detectors during ground tests. The complete set of bandpass curves has been published in{{BibCite|zonca2009}} where all the details of the LFI radiometer's spectral response are given. From each curve we have derived the effective centre frequency according to:
  
 
<math> \label{eq:spectr}  
 
<math> \label{eq:spectr}  
Line 763: Line 354:
 
</math>  
 
</math>  
  
where <math> \Delta \nu = \nu_{max} − \nu_{min} \;</math> is the receiver bandwidth and <math>g(\nu)\;</math>  is the bandpass response. Table 18 below gives the centre frequencies of the 22 LFI radiometers. For each radiometer, <math> g(\nu)\;</math> is calculated by weight-averaging the bandpass response of the two individual diodes with the same weights used to average detector timestreams. For simplicity and for historical reasons, we will continue to refer to the three channels as the 30, 44, and 70 GHz channels.
+
where <math> \Delta \nu = \nu_{max} − \nu_{min} \;</math> is the receiver bandwidth and <math>g(\nu)\;</math>  is the bandpass response.  
 +
Details about colour corrections, <math>C(\alpha)</math>, needed to derive the brightness temperature of a source with a power-law spectral index <math>\alpha</math>, are provided in {{PlanckPapers|planck2011-1-6}}.
  
{| border="0" cellspacing="0" cellpadding="2" align="center"
+
Some details are also given in the corresponding section of the [[LFIAppendix#Spectral Response|Annexes]].
|+ '''Table 18. LFI centre frequencies.'''
 
|-
 
|width="300" | [[File:LFIfreq.jpg|thumb|center|360px|]]
 
|-
 
|}
 
  
Colour corrections, <math>C(\alpha)</math> , needed to derive the brightness temperature of a source with a power-law spectral index <math>\alpha</math>, are given in the table 19 below. The values are averaged for the 11 RCAs and for the three frequency channels. Details about the definition of colour corrections are provided in <cite>#planck2011-1-6</cite>.
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 19. Colour corrections for the 11 LFI RCAs individually and averaged by frequency.'''
 
|-
 
|width="300" | [[File:Colorcorr.jpg|thumb|center|550px|]]
 
|-
 
|}
 
  
 
===== ''Bandpass Estimation''=====
 
===== ''Bandpass Estimation''=====
  
As detailed in <cite>#zonca2009</cite>, our most accurate method to measure the LFI bandpasses is based on measurements of individual components integrated into the LFI Advanced RF Model (LARFM) to yield a synthesised radiometer bandpass.
+
As detailed in{{BibCite|zonca2009}}, our most accurate method to measure the LFI bandpasses is based on measurements of individual components integrated into the LFI Advanced RF Model (LARFM) to yield a synthesised radiometer bandpass.
 
The LARFM is a software tool based on the open-source Quasi Universal Circuit Simulator (QUCS). The measured frequency responses of the various subsystems (feed-OMT, FEM, BEM) are considered as lumped S-parameter components.  
 
The LARFM is a software tool based on the open-source Quasi Universal Circuit Simulator (QUCS). The measured frequency responses of the various subsystems (feed-OMT, FEM, BEM) are considered as lumped S-parameter components.  
 
Measurements of single components are obtained with standard methods and provide highly reliable results, with precision of order 0.1-0.2 dB over the entire band.
 
Measurements of single components are obtained with standard methods and provide highly reliable results, with precision of order 0.1-0.2 dB over the entire band.
Line 789: Line 368:
 
The composite bandpasses are estimated to have a precision of about 1.5 to 2 dB.
 
The composite bandpasses are estimated to have a precision of about 1.5 to 2 dB.
  
We also attempted an end-to-end measurement of the RCA spectral response in the cryo-facility as an independent check. Unfortunately, these measurements suffered some subtle systematic effects in the test setup (standing waves at 70 GHz; polarisation mismatch and narrow frequency coverage at 30 and 44 GHz), preventing an accurate cross-check. However, the comparison shows a general agreement within limits of the test reliability and repeatability.
+
Some details are also given in the corresponding section of the [[LFIAppendix#Bandpass Estimation|Annexes]].
 
 
Figures 12 and 13 below show all the LFI bandpasses obtained by the frequency response data of each radiometer unit assembled by the LARFM. The 70 GHz channels show a low bandpass ripple, of about 10 dB, which is within scientific requirements. The spike between 60 and 61 GHz, below the low frequency cut-off, is due to a systematic effect present in all the BEM gain measurements and caused by the test setup. We removed this range from the bandpasses made available at the Data Processing Center in order to avoid possible spurious effects and therefore the frequency coverage is 61-80 GHz. The high frequency cut-off is not well defined in most of the channels.
 
The 30 and 44 GHz bandpasses show a more complex shape, driven by the BEM spectral response, but still within <math>\pm 10</math> dB. The low frequency cut-off is always well defined, while the high frequency cut-off is not well defined in RCA 24 and 26. However, comparing with the high frequency cut-off of RCA 25, it is expected that the additional bandwidth is very low. Frequency coverage is 25-50 GHz for the 44 GHz channels and 21.3-40 GHz for the 30 GHz channels.
 
 
 
[[File:band1.jpg|thumb|center|500px| Figure 12. LFI 70 GHz channels’ bandpasses. Each row shows the 4 bandpasses of a RCA ordered as M-00, M-01, S-10 and S-11. Units are [dB] <math>10log(\frac{V_{out}}{V_{in}})</math> plotted against frequency [GHz]. ]]
 
 
 
[[File:band2.jpg|thumb|center|500px| Figure 13. LFI30 and 44 GHz channels’ bandpasses. Each row shows the 4 bandpasses of a RCA ordered as M-00, M-01, S-10 and S-11. Units are [dB] <math>10log(\frac{V_{out}}{V_{in}})</math> plotted against frequency [GHz]. ]]
 
  
 
==== ''Stability''====
 
==== ''Stability''====
  
 
Thanks to its differential scheme, the LFI is insensitive to many effects caused by 1/f noise, thermal fluctuations, or electrical instabilities.
 
Thanks to its differential scheme, the LFI is insensitive to many effects caused by 1/f noise, thermal fluctuations, or electrical instabilities.
As detailed in <cite>#planck2011-1-4</cite> [{{PEarly|3|link=Planck early results. First assessment of the Low Frequency Instrument in-flight performance}}], one effect detected during the first survey was the daily temperature fluctuation in the back-end unit induced by the downlink transponder, which was powered on each day for downlinks during the first 258 days of the mission. As expected, the effect is highly correlated between the sky and reference load signals. In the difference, the variation is reduced by a factor <math>∼(1 − r)</math>, where <math>r</math> is the gain modulation factor defined above.
+
As detailed in {{PlanckPapers|planck2011-1-4}}, one effect detected during the first survey was the daily temperature fluctuation in the back-end unit induced by the downlink transponder, which was powered on each day for downlinks during the first 258 days of the mission. As expected, the effect is highly correlated between the sky and reference load signals. In the difference, the variation is reduced by a factor <math>∼(1 − r)</math>, where <math>r</math> is the gain modulation factor defined above (see eq. \ref{eq:erre1}).
  
A particular class of signal fluctuations occasionally observed during operations is due to electrical instabilities that appear as abrupt increases in the measured drain current of the front-end amplifiers, with a relaxation time variable from few seconds to some hundreds of seconds. Typically, these events cause a simultaneous change in the sky and reference load signals. Because they are essentially common-mode, their residual on the differenced data is negligible (figure 14), and the data are suitable for science production. In a few cases the residual fluctuation in the differential output was large enough (a few millikelvin in calibrated antenna temperature units) to be flagged, and the data were not used. The total amount of discarded data for all LFI channels until Operational Day 389 was about 2000 s per detector, or 0.008%.
+
A particular class of signal fluctuations occasionally observed during operations is due to electrical instabilities that appear as abrupt increases in the measured drain current of the front-end amplifiers, with a relaxation time variable from few seconds to some hundreds of seconds. Typically, these events cause a simultaneous change in the sky and reference load signals. Because they are essentially common-mode, their residual on the differenced data is negligible, and the data are suitable for science production. In a few cases the residual fluctuation in the differential output was large enough (a few millikelvin in calibrated antenna temperature units) to be flagged, and the data were not used. The total amount of discarded data for all LFI channels until Operational Day 389 was about 2000 s per detector, or 0.008%.
  
 
A further peculiar effect appeared in the 44 GHz detectors, where single isolated samples, either on the sky or the reference voltage output, were far from the rest. Over a reference period of four months, 15 occurrences of single-sample spikes (out of 24 total anomaly events) were discarded, an insignificant loss of data.
 
A further peculiar effect appeared in the 44 GHz detectors, where single isolated samples, either on the sky or the reference voltage output, were far from the rest. Over a reference period of four months, 15 occurrences of single-sample spikes (out of 24 total anomaly events) were discarded, an insignificant loss of data.
 
[[File:stability.jpg|thumb|center|600px| Figure 14. Short spikes in the drain current (left) affect total power signals (right). The jumps are strongly correlated in sky and reference signals, so that in the difference data the effect essentially disappears.]]
 
  
 
==== ''Thermal Susceptibility''====
 
==== ''Thermal Susceptibility''====
  
As already mentioned in section [[LFI design, qualification, and performance#LFI In-flight Calibration|LFI In-flight Calibration]] above and detailed in <cite>#gregorio2013</cite>, during the CPV campaign, susceptibility tests were performed in order to characterise the LFI instrument susceptibility to thermal and electrical variations.
+
As mentioned in section [[LFI design, qualification, and performance#LFI In-flight Calibration|LFI In-flight Calibration]] above and detailed in{{BibCite|gregorio2013}}, during the CPV campaign, susceptibility tests were performed in order to characterise the LFI instrument susceptibility to thermal and electrical variations.
  
 
The effect of temperature fluctuations on the LFI radiometers is originated in the Planck cold end interface of the hydrogen sorption cooler to the instrument focal plane. The temperature is actively controlled through a dedicated stage, the Thermal Stabilization Assembly (TSA), providing a first reduction of the effect. The thermal mass of the focal plane strongly contribute to reduce residual fluctuations.
 
The effect of temperature fluctuations on the LFI radiometers is originated in the Planck cold end interface of the hydrogen sorption cooler to the instrument focal plane. The temperature is actively controlled through a dedicated stage, the Thermal Stabilization Assembly (TSA), providing a first reduction of the effect. The thermal mass of the focal plane strongly contribute to reduce residual fluctuations.
Line 820: Line 390:
 
* the radiometers thermal susceptibility.
 
* the radiometers thermal susceptibility.
  
===== ''Thermal Dynamic Response''=====
+
Some details are also given in the corresponding section of the [[LFIAppendix#Thermal Susceptibility|Annexes]].
  
In order to amplify the effect and to get a more accurate measurement, the active control from the TSA was switched off. The resulting increased fluctuations, propagating at the cooler frequencies, were used to evaluate transfer functions between the TSA stage and the FPU sensors (see figure 14 below). The analysis produced damping factors of 2–5 at about 1 mHz. The source of fluctuations was characterized by two typical periods of the sorption cooler during the final CPV phase: (i) the single bed cycle time, 940 s, (ii) the complete cooler period, six times larger, 5640 s.
+
==== Instrument Budgets ====
  
[[File:Sensor_position.jpg|thumb|center|460px| Figure 14. Schema of the focal plane thermal sensor locations.]]
+
LFI power, mass and telemetry budget are given in the corresponding section of the [[LFIAppendix#Instrument Budgets|Annexes]].
  
Results are shown in Table 20. Sorting the sensors by the transfer function amplitudes in descending order (second column of the table), the route of the propagation of temperature fluctuations through the focal plane sensors (shown in figure 14) was reproduced as expected: the largest amplitudes are in the sensor closest to the right bottom corner interface with the working cooler and they decrease in the direction left upwards. The measured values in flight showing a good agreement with what measured during the CSL ground test.
+
== <span id="LFISystematics">Systematic Effects </span>==
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 20. Transmission amplitudes and phases of fluctuations at the two main cooler frequencies during the transient test. Typical fit parameters uncertainties are at 1% level.'''
 
|-
 
|width="600" | [[File:Din_t1.jpg|thumb|center|340px|]]
 
|-
 
|}
 
 
 
===== ''Radiometer Thermal Susceptibility''=====
 
 
 
Fluctuations of the focal plane temperature would cause variations of important parameters (mainly the low noise amplifier gains and noise temperatures), impacting the radiometer output signal. The response of the LFI radiometers to thermal fluctuations was estimated by inducing discrete temperature steps on the focal plane through TSA set-point changes.
 
The set-point was changed over four values (Fig. 47, left) and after a stabilization of at least two hours, the measured receivers output was characterized as a function of each temperature variation of about 0.3 K.
 
 
 
The slope of the resulting <math>T_{ant} </math> vs  <math>T_{phys} </math> plot is the measured response of the receivers to a change in the temperature. Results, reported in the Table 21, confirmed that physical temperature fluctuations in the main frame are furtherly reduced when convolved with the radiometer thermal susceptibility coefficients: the derived output fluctuations, measured in antenna temperature, were actually reduced by an extra factor of 10 to 200 (according to the channel considered), of the same order of ground test results. This corresponds to reduce the mean peak-to-peak amplitudes of fluctuations measured by high resolution sensors, of the order of 4 mK in steady condition, of at least one order of magnitude in the output timestream.
 
 
 
{| border="0" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 21. Results of thermal susceptibility test. Units are <math>K_{ant}/K_{phys}</math>. Together with the radiometers, the closest sensor used as reference for the physical temperature is indicated. Results for the detector LFI24S-11 are missing because it suffered a period of signal saturation during the test.'''
 
|-
 
|width="600" | [[File:Susc_t.jpg|thumb|center|500px|]]
 
|-
 
|}
 
 
 
=== Instrument Budgets ===
 
 
 
==== ''Power Budget'' ====
 
 
 
{| border="1" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 22. LFI sub-system power budget.'''
 
|-
 
!scope="col"| Subsystem
 
!scope="col"| Unit
 
!scope="col"| Assembly
 
!scope="col"| Sub-Assembly
 
!scope="col"| Budget [W]
 
|-
 
|align="left"| RAA || ||  ||
 
|align="right" |45.599
 
|-
 
|
 
|align="left"|FEU ||  ||
 
|align="right" | 0.329
 
|-
 
| ||
 
|align="left"| FE structure ||
 
|align="right" | N/A
 
|-
 
| ||
 
|align="left"| Feed Horns ||
 
|align="right" | N/A
 
|-
 
| ||
 
|align="left"| OMTs ||
 
|align="right" | N/A
 
|-
 
| ||
 
|align="left"| FEMs ||
 
|align="right" | 0.329
 
|-
 
| || || 
 
|align="left"|30 GHz
 
|align="right" | 0.056
 
|-
 
| || || 
 
|align="left"|44 GHz
 
|align="right" | 0.121
 
|-
 
| || || 
 
|align="left"|70 GHz
 
|align="right" | 0.152
 
|-
 
|
 
|align="left"|BEU ||  ||
 
|align="right" | 45.270
 
|-
 
| ||
 
|align="left"| DAE||
 
|align="right" | 31.986
 
|-
 
| ||
 
|align="left"| BEMs ||
 
|align="right" | 13.284
 
|-
 
| || || 
 
|align="left"|30 GHz
 
|align="right" | 4.914
 
|-
 
| || || 
 
|align="left"|44 GHz
 
|align="right" | 4.633
 
|-
 
| || || 
 
|align="left"|70 GHz
 
|align="right" | 3.737
 
|-
 
| ||
 
|align="left"| Waveguides ||
 
|align="right" | N/A
 
|-
 
| ||
 
|align="left"| RAA harness ||
 
|align="right" | N/A
 
|-
 
|
 
|align="left"| 4K Load || ||
 
|align="right" | N/A
 
|-
 
|align="left"| REBA || || ||
 
|align="right" | 22.700
 
|-
 
|align="left"| System Harness || ||  ||
 
|align="right" | N/A
 
|-
 
| '''Total''' ||  ||  || 
 
|align="right" | 68.299
 
|-
 
|}
 
 
 
==== ''Mass Budget''====
 
 
 
The maximum allocated mass for the Planck Instruments is 445 kg, 89 kg are allocated for the LFI instrument. The distribution of the instrument and cooler mass to the different interfaces in the system is as given in table 23 below.
 
 
 
{| border="1" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 23. LFI sub-system mass budget.'''
 
|-
 
!scope="col"| Subsystem
 
!scope="col"| Unit
 
!scope="col"| Assembly
 
!scope="col"| Sub-Assembly
 
!scope="col"| Budget [kg]
 
|-
 
|align="left"| RAA || ||  ||
 
|align="right" |77.900
 
|-
 
|
 
|align="left"|FEU ||  ||
 
|align="right" | 22.935
 
|-
 
| ||
 
|align="left"| FE structure ||
 
|align="right" | 17.680
 
|-
 
| ||
 
|align="left"| Feed Horns+OMTs ||
 
|align="right" | 2.825
 
|-
 
| || || 
 
|align="left"|30 GHz
 
|align="right" | 0.680
 
|-
 
| || || 
 
|align="left"|44 GHz
 
|align="right" | 0.732
 
|-
 
| || || 
 
|align="left"|70 GHz
 
|align="right" | 1.413
 
|-
 
| ||
 
|align="left"| FEMs ||
 
|align="right" | 2.430
 
|-
 
| || || 
 
|align="left"|30 GHz
 
|align="right" | 0.810
 
|-
 
| || || 
 
|align="left"|44 GHz
 
|align="right" | 1.110
 
|-
 
| || || 
 
|align="left"|70 GHz
 
|align="right" | 0.510
 
|-
 
|
 
|align="left"|BEU ||  ||
 
|align="right" | 25.542
 
|-
 
| ||
 
|align="left"| DAE||
 
|align="right" | 23.130
 
|-
 
| ||
 
|align="left"| BEMs ||
 
|align="right" | 2.412
 
|-
 
| || || 
 
|align="left"|30 GHz
 
|align="right" | 0.624
 
|-
 
| || || 
 
|align="left"|44 GHz
 
|align="right" | 0.864
 
|-
 
| || || 
 
|align="left"|70 GHz
 
|align="right" | 0.924
 
|-
 
|
 
|align="left"| Waveguides || ||
 
|align="right" | 23.005
 
|-
 
| ||
 
|align="left"| WG structure ||
 
|align="right" | 15.940
 
|-
 
| ||
 
|align="left"| WGs ||
 
|align="right" | 7.065
 
|-
 
|
 
|align="left"| RAA harness ||  ||
 
|align="right" | 5.491
 
|-
 
| ||
 
|align="left"| BEU internal harness ||
 
|align="right" | 4.489
 
|-
 
| ||
 
|align="left"| DAE-FEU cryo-harness ||
 
|align="right" | 1.002
 
|-
 
|
 
|align="left"| 4K Load || ||
 
|align="right" | 0.927
 
|-
 
|align="left"| REBA (2 units) || || ||
 
|align="right" | 8.480
 
|-
 
|align="left"| System Harness || ||  ||
 
|align="right" | 3.495
 
|-
 
| '''Total''' ||  ||  || 
 
|align="right" | 89.875
 
|-
 
|}
 
 
 
==== ''Telemetry Budget'' ====
 
 
All the science data flow coming from the foreseen on-board data processing can be summarised in the following table 24.
 
 
 
{| border="1" cellspacing="0" cellpadding="2" align="center"
 
|+ '''Table 24. Data processing and compression results.'''
 
|-
 
|
 
!scope="col"| 30 GHz
 
!scope="col"| 44 GHz
 
!scope="col"| 70 GHz
 
!scope="col"| Total
 
|-
 
|align="left"| Total samples
 
|align="right"| 65
 
|align="right"| 94
 
|align="right"| 154 ||
 
|-
 
|align="left"| Compression factor
 
|align="right"| 2.4
 
|align="right"| 2.4
 
|align="right"| 2.4 ||
 
|-
 
|align="left"| Compressed samples
 
|align="right"| 27
 
|align="right"| 39
 
|align="right"| 64 ||
 
|-
 
|-
 
|align="left"| Science data available (word)
 
|align="right"| 490
 
|align="right"| 490
 
|align="right"| 490 ||
 
|-
 
|align="left"| Time per packet (s)
 
|align="right"| 18.035
 
|align="right"| 12.570
 
|align="right"| 7.651 ||
 
|-
 
|align="left"| Corresponding sky arc (<math>^\circ</math>)
 
|align="right"| 108
 
|align="right"| 75
 
|align="right"| 46 ||
 
|-
 
|align="left"| Packet frequency (Hz)
 
|align="right"| 0.444
 
|align="right"| 0.955
 
|align="right"| 3.317 ||
 
|-
 
|-
 
|align="left"| Net Data Volume (word/s)
 
|align="right"| 217.352
 
|align="right"| 467.778
 
|align="right"| 1536.986
 
|align="right"| 2222.116
 
|-
 
|align="left"| Net Data Volume (kbps)
 
|align="right"| 3.478
 
|align="right"| 7.484
 
|align="right"| 24.592
 
|align="right"| 35.554
 
|-
 
|}
 
 
 
This result refers to the net science telemetry rate that LFI sends to ground. If we add the overhead due to the packet header (protocol) and the tertiary header we obtain a gross science telemetry rate of 37.150 kbps.
 
This number should be added to the data coming from the calibration channel (uncompressed data used to verify the correct functionalities of the on-board compression algorithm, see [[LFI design, qualification, and performance#Reduction and Compression of Science Data|Reduction and Compression of Science Data]] section) sent to ground in parallel. This channel has a worst case gross data production of 5.140 kbps for a total science data of 42.290 kbps.
 
 
 
The gross housekeeping telemetry budget is 2.425 kbps for a total budget of 44.715 kbps. The total data budget allocated to the LFI is 53.5 kbps well above the LFI total telemetry budget.
 
 
 
== LFI Systematics Effects ==
 
  
 
The LFI design was driven by the need to suppress systematic effects well below instrument white noise. The differential receiver scheme, with reference loads cooled to 4 K, greatly minimises the effect of 1/f noise and common-mode fluctuations, such as thermal perturbations in the 20K LFI focal plane. The use of a gain modulation factor (see Eq. \ref{eq:erre1} in [[LFI design, qualification, and performance#Radiometer Chain Assembly (RCA)|RCA]] section above) largely compensates for spurious contributions from input offsets. Furthermore, diode averaging (Eq. \ref{eq:v1} in [[LFI design, qualification, and performance#Radiometer Chain Assembly (RCA)|RCA]] section above) allows us to cancel second-order correlations such as those originating from phase switch imbalances.
 
The LFI design was driven by the need to suppress systematic effects well below instrument white noise. The differential receiver scheme, with reference loads cooled to 4 K, greatly minimises the effect of 1/f noise and common-mode fluctuations, such as thermal perturbations in the 20K LFI focal plane. The use of a gain modulation factor (see Eq. \ref{eq:erre1} in [[LFI design, qualification, and performance#Radiometer Chain Assembly (RCA)|RCA]] section above) largely compensates for spurious contributions from input offsets. Furthermore, diode averaging (Eq. \ref{eq:v1} in [[LFI design, qualification, and performance#Radiometer Chain Assembly (RCA)|RCA]] section above) allows us to cancel second-order correlations such as those originating from phase switch imbalances.
  
We have developed an error budget for systematic effects (<cite>#planck2011-1-4, bersanelli2010</cite> [{{PEarly|3|link=Planck early results. First assessment of the Low Frequency Instrument in-flight performance}}],{{PPreLaunch|4|link=Planck pre-launch status: Design and description of the Low Frequency Instrument}}]) as a reference for both instrument design and data analysis. Our goal is to ensure that each systematic effect is rejected to the specified level, either by design or by robust removal in software. At this stage, the following effects are relevant:
+
We have developed an error budget for systematic effects ({{PlanckPapers|planck2013-p02a}}, {{PlanckPapers|planck2011-1-4}}, {{PlanckPapers|bersanelli2010}}) as a reference for both instrument design and data analysis. Our goal is to ensure that each systematic effect is rejected to the specified level, either by design or by robust removal in software. At this stage, the following effects are relevant:
  
 
: – 1/f noise;  
 
: – 1/f noise;  
Line 1,146: Line 410:
  
 
For each of these effects we used flight data and information from ground tests to build timelines, maps, and angular power spectra that represent our best knowledge of their impact on the scientific analysis.
 
For each of these effects we used flight data and information from ground tests to build timelines, maps, and angular power spectra that represent our best knowledge of their impact on the scientific analysis.
The details of the systematic effect analysis is given in section LFI data processing section - [[LFI systematic effect uncertainties|Systematic Effects uncertainties]].  
+
The details of the systematic effect analysis is given in section LFI data processing section - [[LFI systematic effect uncertainties|Systematic Effects uncertainties]].
 +
 
 +
== <span id="SCS">The Sorption Cooler</span> ==
 +
The Planck H2 Sorption Cooler is the first stage of the active cryogenic chain: its task is to maintain the LFI down to the operating temperature while providing a pre-cooling stage for the HFI refrigerators. The system performs a simple thermodynamic cycle based on hydrogen compression, gas pre-cooling by three passive radiators, further cooling due to the heat recovery by the cold low pressure gas stream, expansion through a J-T valve and evaporation at the cold stage {{PlanckPapers|planck2011-1-3}}. A drawing of the Planck Sorption Cooler System (SCS) is shown in Fig. 5. The engine of the cryocooler is the compressor.  It serves two main functions: to produce the high-pressure hydrogen gas flow and to maintain a stable gas recovery rate, which keeps the return pressure, hence the liquid temperature, constant. The high pressure gas flowing to the cold end is pre-cooled by exchanging heat with the three passive stages at the V-Grooves and with the evaporated cold gas returning back to the compressor. The gas then expands at the cold end through a J-T valve producing approximately 1 Watt of cooling power at a temperature of <20K: most of this heat lift is used at the LVHX2 (Liquid Vapour Heat eXchanger 2, see Fig. 5) interface to absorb the LFI heat load at a temperature around 20K. The remaining heat lift is used at the LVHX1 as a pre-cooling stage, at a temperature lower than 19 K, for the two HFI refrigerators. The cooler and its performance are described in detail in{{BibCite|morgante2009}}.
 +
 
 +
[[File:SCS_CAD_Figure.jpg|thumb|center|480px|'''Figure 5. Planck Sorption Cooler CAD view with labels of the main sub-systems.''']]
 +
 
 +
Both LVHX’s provide a temperature around 18 K, with fluctuations driven by the cooler instabilities (compressor element variations, cycling, two phase flow dynamics etc.). Stabilization of the HFI interface (LVHX1) temperature is not necessary, as thermal control of the subsequent colder stages is more efficient and very effective.  To reduce cold end fluctuations directly transmitted to the LFI radiometers, a copper block designated as the Temperature Stabilization Assembly (TSA), is inserted, as an intermediate stage, between LVHX2 and the LFI FocaL Plane Unit (FPU). The TSA comprises a temperature sensor and a heater controlled by a PID-type feedback loop working in combination with the passive thermal inertia. The set-point temperature of the TSA is an adjustable parameter of the sorption cooler system, chosen to provide dynamic range for control during mission: as the compressor elements age, the return gas pressure and thus the temperature of LVHX2 rise slowly. To keep the LFI T reference stable during operations the set point must be periodically adjusted to maintain the level of oscillations within the required range (Fig. 6).
 +
 
 +
[[File:TSA_LVHX2_mission.jpg|thumb|center|480px|'''Figure 6.LVHX2 (black, HK parameter name SD029540) and TSA (red, HK parameter name SD030540) temperature profile from 125 to 563 days after launch.''']]
 +
 
 +
Two sorption cooler units have been integrated on board the Planck spacecraft. Both units have been used to cover the mission lifetime: one cooler has been operated for the first two sky surveys. At the end of its lifetime a switchover operation, performed on August 11th 2010 (455 days after launch), has activated the second unit that has been running since then. The LVHX2 temperature change due to the new cooler start, and the subsequent re-adjustment of the LFI temperature stabilization stage, is clear in Fig. 6.
  
 +
<!--
 
== Acronyms ==
 
== Acronyms ==
  
Line 1,161: Line 437:
 
: DC Direct Current
 
: DC Direct Current
 
: DPC Data Processing Centre
 
: DPC Data Processing Centre
 +
: DPU Digital Processing Unit
 
: EMC Electro-Magnetic Compatibility
 
: EMC Electro-Magnetic Compatibility
 
: EMI Electro-Magnetic Interference
 
: EMI Electro-Magnetic Interference
Line 1,191: Line 468:
 
: SCS Sorption Cooler Subsystem  
 
: SCS Sorption Cooler Subsystem  
 
: SLT System Level Test
 
: SLT System Level Test
 +
: SPU Signal Processing Unit
 
: SS Stainless Steel
 
: SS Stainless Steel
 
: SVM Service Module
 
: SVM Service Module
Line 1,197: Line 475:
 
: TSA Thermal Stabilization Assembly
 
: TSA Thermal Stabilization Assembly
 
: TTC Telemetry, Tracking and Command
 
: TTC Telemetry, Tracking and Command
: WG Waveguide  
+
: VSWR Voltage Standing Wave Ratio
 +
: WG Waveguide
 +
 
 +
== Glossary ==
 +
 
 +
: Feed Horns xxx
 +
: REBA Radiometer Electronics Box Assembly
 +
-->
  
 
== References ==
 
== References ==
 +
 +
<References />
  
  
<biblio force=false>
+
[[Category:LFI design, qualification and performance|001]]
#[[References]]
 
</biblio>
 

Latest revision as of 10:04, 23 July 2014

Instrument description[edit]

The LFI instrument (see Fig. 1 in the LFI overview) consists of a 20 K focal plane unit hosting the corrugated feed horns, the orthomode transducers (OMTs) and the receiver front-end modules (FEMs). Forty four composite waveguides[1] are interfaced with three conical thermal shields and connect the front-end modules to the warm (~300 K) back-end unit (BEU) containing a further radio frequency amplification stage, detector diodes and all the electronics for data acquisition and bias supply.

Best LFI noise performance is obtained with receivers based on InP High Electron Mobility Transistor (HEMT) low noise amplifiers (LNAs) for minimal power dissipation and best performance. To further minimise power consumption in the focal plane, the radiometers are split into two sub-assemblies connected by waveguides, one located at the telescope focal area, the other on the 300 K portion of the Planck satellite. These design features allow the entire front-end LNAs dissipation to be <0.55 W, which enables the active cooling of the focal assembly. This is achieved with a vibration-less hydrogen sorption cooler, which also provides 18 K pre-cooling to the HFI helium J-T cooler. Two sorption cooler units are included in the flight hardware.

As shown schematically in Fig. 1 below, the LFI consists of the following subsystems:

  • Radiometer Array Assembly (RAA)
  • Sorption Cooler Subsystem (SCS)
  • Radiometer Electronics Box Assembly (REBA)

The RAA includes the Front End Unit (FEU) and the Back End Unit (BEU), connected via waveguides. The FEU is located at the focus of the telescope, as one component of the joint LFI/HFI focal assembly (see sections below). The BEU is mounted on the top of the Planck service module (SVM). The REBA (Radiometer Electronics Box Assembly) and the warm parts of the Sorption Cooler System (SCS) are located on one of the lateral panels of the SVM. The FEU and the Sorption Cooler Compressor (SCC) are connected by concentric stainless steel tubes. The smaller tube carries hydrogen at ∼60 atmospheres from the cooler compressors to the FEU, while the larger tube returns the hydrogen at ∼0.3 atmospheres. These units are described in following sections and in the Annexes, the SCS is described in details in the Sorption Cooler section. All LFI units are linked together by the LFI harness, which also connects to the spacecraft interface.

Figure 1. Block Diagram of LFI

Radiometer Array Assembly (RAA)[edit]

The Radiometer Array Assembly (RAA) consists of two main units (the front end unit, FPU and the Back End Unit, BEU), connected by a set of waveguides. The Focal Plane Unit (FPU) is the heart of the LFI instrument and it contains the feed array and associated orthomode transducers (OMTs) and FEMs, all cooled to 20 K by the sorption cooler. The FPU comprises a set of 11 modules, which are mounted on a mechanical support which meets the thermo-mechanical requirements of the instrument and adds thermal inertia. The BEU comprises the radiometer Back End Modules (BEM) and the Data Acquisition Electronics (DAE), which are connected by an internal harness. The HFI Unit is located inside the LFI FPU and supported by the LFI structure. The LFI structure gives the mechanical and thermal interface to the HFI unit with the proper stiffness and thermal de-coupling. The LFI structure also guarantees the proper alignment of the HFI detector with the telescope focal plane.

The time scale of the stability of the receiver is driven by the 1 rpm rotation speed of the spacecraft, which requires a very low 1/f-noise or gain variation of the low noise amplifiers and other components. The LFI uses a pseudo-correlation receiver concept (Fig. 2 below). This radiometer concept is chosen to maximise the stability of the instrument by reducing the effect of non-white noise generated in the radiometer itself. In this scheme, the difference between the inputs to each of the chains (the signal from the telescope and that from a reference black body respectively) is continuously being observed. To remove the effect of instability in the back-end amplifiers and detector diodes, it is necessary to switch the signal detected at the diodes at high rate. The signals from the sky and from a reference load are combined by a hybrid coupler, amplified in two independent amplifier chains, and separated out by another hybrid. The sky and the reference load power can then be measured and differenced. Since the reference signal has been subject to the same gain variations in the two amplifier chains as the sky signal, the true sky power can be recovered. The differencing receiver greatly improves the stability if the two input signals are almost equal, at a cost of a factor of [math]\sqrt 2 \; [/math] in sensitivity compared to a perfectly stable total-power radiometer with the same noise temperature and bandwidth. This radiometer concept is capable of greatly reducing the knee frequency. We define as Radiometer Chain Assembly (RCA, see Fig. 2) each functional unit from the feed horn to the BEM. The RAA therefore includes a set of 11 RCAs and the Data Acquisition Electronics (see also Fig. 1 above), all mounted on a suitable mechanical structure. Although there are differences in the details of the radiometer chains at different frequencies, their overall configuration is similar, and a general description of its design is provided in this section. Planck LFI has 11 Radiometer Chain Assembly (RCA). Each RCA is constituted by feed horn and FEM in the FEU (at 20 K), BEM (at 300 K) in the BEU and four waveguides that connect each FEM-BEM couple. The frequency distribution of the RCA is the following:

  • 2 RCAs at 30 GHz;
  • 3 RCAs at 44 GHz;
  • 6 RCAs at 70 GHz.
Figure 2. A complete RCA from feed-horn to analog voltage output. The insets show the OMT, the details of the 20 K pseudo-correlator and of the back-end radio-frequency amplification, low-pass filtering, detection and DC amplification.

Radiometer Chain Assembly (RCA)[edit]

Every RCA consists of two radiometers, each feeding two diode detectors (see Fig. 2 above), for a total of 44 detectors. The 11 RCAs are labelled by a numbers from 18 to 28 as outlined in Fig. 1 in LFI overview, right panel.

Fig. 2 provides a more detailed description of each radiometric receiver. In each RCA, the two perpendicular linear polarisation components split by the OMT propagate through two independent pseudo-correlation differential radiometers, labelled as M or S depending on the arm of the OMT they are connected to (Main or Side, see lower-left inset of Fig. 2).

In each radiometer the sky signal coming from the OMT output is continuously compared with a stable 4 K blackbody reference load mounted on the external shield of the HFI 4 K box[2]. After being summed by a first hybrid coupler, the two signals are amplified by ~30 dB, see upper-left inset of Fig. 2. The amplifiers were selected for best operation at low drain voltages and for gain and phase match between paired radiometer legs, which is crucial for good balance. Each amplifier is labelled with codes 1, 2 so that the four outputs of the LNAs can be named with the sequence: M1, M2 (radiometer M) and S1, S2 (radiometer S). Tight mass and power constraints called for a simple design of the Data Acquisition Electronics (DAE) box so that power bias lines were divided into five common-grounded power groups with no bias voltage readouts; only the total drain current flowing through the front-end amplifiers is measured and is available to the house-keeping telemetry (this design has important implications for front-end bias tuning, which depends critically on the satellite electrical and thermal configuration and was repeated at all integration stages, during on-ground and in-flight satellite tests). A phase shift (or phase switch) alternating between [math] 0^\circ \; [/math] and [math]180^\circ \; [/math] at the frequency of 4096 Hz is applied in one of the two amplification chains and then a second hybrid coupler separates back the sky and reference load components that are further amplified and detected in the warm BEU, with a voltage output ranging from -2.5 V to +2.5 V.

Each radiometer has two output diodes which are labelled with binary codes 00, 01 (radiometer M) and 10, 11 (radiometer S), so that the four outputs of each radiometric chain can be named with the sequence: M-00, M-01, S-10, S-11.

After detection, an analog circuit in the DAE box removes a programmable offset in order to obtain a nearly null DC output voltage and a programmable gain is applied to increase the signal dynamics and optimally exploit the ADC input range. After the ADC, data are digitally down-sampled, re-quantised and compressed in the REBA according to a scheme described in[3][4], before preparing telemetry packets. On ground, telemetry packets are converted to sky and reference load time ordered data after calibrating the ADU samples into volt considering the applied offset and gain factors.

To first order, the mean differential power output for each of the four receiver diodes can be written as follows[5][6]Planck-PreLaunch-II[7]::

[math] \label{eq:power} P_{\rm out}^{\rm diode} = a\, G_{\rm tot}\,k\,\beta \left[ T_{\rm sky} + T_{\rm noise} - r\left( T_{\rm ref} + T_{\rm noise}\right) \right] [/math]

where [math]G_{\rm tot} \;[/math] is the total gain, [math]k \;[/math] is the Boltzmann constant, [math]\beta \;[/math] the receiver bandwidth and [math]a \;[/math] is the diode constant. [math]T_{\rm sky} \;[/math] and [math]T_{\rm ref}\; [/math] are the average sky and reference load antenna temperatures at the inputs of the first hybrid and [math]T_{\rm noise} \;[/math] is the receiver noise temperature.

The gain modulation factor[6]Planck-Early-V[8], [math]r[/math], is defined by:

[math] \label{eq:erre1} r = \frac{T_{\rm sky} + T_{\rm noise}}{T_{\rm ref} + T_{\rm noise}} [/math]

and is used to balance (in software) the temperature offset between the sky and reference load signals and minimise the residual 1/[math]f \;[/math] noise in the differential datastream. This parameter is calculated from the average uncalibrated total power data using the relationship:

[math] \label{eq:erre2} r = \langle V_{\rm sky} \rangle/ \langle V_{\rm ref}\rangle, [/math]

where [math]\lt V_{\rm sky}\gt \;[/math] and [math]\lt V_{\rm ref}\gt \;[/math] are the average sky and reference voltages calculated in a defined time range. The white noise spectral density at the output of each diode is essentially independent from the reference-load absolute temperature and is given by:

[math] \label{eq:dt1} \Delta T_0^{\rm diode} = \frac{2\,(T_{\rm sky}+T_{\rm noise})}{\sqrt{\beta}}. [/math]

If the front-end components are not perfectly balanced, then the separation of the sky and reference load signals after the second hybrid is not perfect and the outputs are mixed. First-order deviations in white noise sensitivity from the ideal behaviour are caused mainly by noise temperature and phase-switch amplitude mismatches. Following the notation used in[5], we define [math]\epsilon_{Tn} \; [/math], the imbalance in front end noise temperature, and [math]\epsilon_{A1} \; [/math] and [math] \epsilon_{A2} \;[/math] , the imbalance in signal attenuation in the two states of the phase switch. Equation above for the two diodes of a slightly imbalanced radiometer then becomes

[math] \label{eq:dt2} (\Delta T^{diode} )^2 ≈ (\Delta T_0^{diode})^2 ( 1± \frac{\epsilon_{A1}- \epsilon_{A2}}{2} + \alpha \epsilon_{Tn}) [/math]

which is identical for the two diodes apart from the sign of the term [math](\epsilon_{A1} − \epsilon_{A2} )/2[/math], representing the phase switch amplitude imbalance. This indicates that the isolation loss caused by this imbalance generates an anti-correlation between the white noise levels of the single-diode data streams. For this reason, the LFI scientific data streams are obtained by averaging the voltage outputs from the two diodes in each radiometer:

[math] \label{eq:v1} V^{rad}_{out} = w_1 V^{diode\,1}_{out} +w_2 V^{diode\,2}_{out} [/math]

where [math]w_1 [/math] and [math]w_2[/math] are inverse-variance weights calculated from the data as discussed in Planck-Early-V[8]. This way, the diode-diode anti-correlation is cancelled, and the radiometer white noise becomes

[math] \label{eq:dt3} \Delta T^{rad} ≈ \frac{ T_0^{diode}}{\sqrt{2}} (1+\alpha \epsilon_{Tn})^{1/2} [/math]

In Equations above, [math]\epsilon ≪ 1[/math], while [math] \alpha [/math] is a term [math]\simeq 1 [/math] given by:

[math] \label{eq:alpha} \alpha = \frac{ T_{noise} (2 \; T_{noise} + T_{sky} + T_{ref} } {2 (T_{sky} + T_{noise} )(T_{ref} + T_{noise})} [/math]

See Diode Combination section for the details of the diode combination procedure.

In Fig. 3 below we show a close-up of the two front end modules of an RCA with the four phase switches which are labelled with the four letters A and B (main arm), C and D (side arm). Each phase switch is characterised by two states: state 0 (no phase shift applied to the incoming wave) and state 1 ([math]180^\circ[/math] phase shift applied) and can either stay fixed in a state or switch at 4 kHz between the two states.

Phase switches are clocked and biased by the DAE and their configuration can be programmed via telecommand. In order to simplify the instrument electronics, phase switches are configured and operated in pairs: A/C and B/D. This means that if phase switches A and C are switching at 4 kHz then B and D are fixed both in the same state (either 0 or 1). This simplification, required during the design phase to comply with mass and power budgets, comes at the price of loosing some setup redundancy.

Figure 3. Close-up of the two front-end modules of an RCA. There are four phase switches, labelled A, B, C and D. Each switch can be fixed in one of its two positions (labelled as 0, 1) or switch at 4 kHz between 0 and 1. Phase switches are clocked and biased by the DAE in pairs: A/C and B/D.

Feed Horns (FH)[edit]

Dual profiled corrugated horns have been selected at all LFI frequencies as the best design in terms of shape of the main lobe, level of the side lobes, control of the phase centre, and compactness. Details of the design, flight model and tests of Planck-LFI feed horns can be found in[9] and in the corresponding Annex section.

OrthoMode Transducers (OMT)[edit]

The Ortho–Mode Transducer (OMTs) separates the radiation collected by the feed horn in two orthogonal polarisation components. It consists of a circular to square waveguide transition (directly connected to the FH), a square waveguide section and two separate rectangular waveguide (the through and side arms, which separate and pick up the orthogonal polarisation, connected with the FEU). On the side arms is always present a 90 degrees bend, while a twist is also necessary on the main (30 and 44 GHz) and side (70 GHz) arm, in order to math the FEU polarisation.

The details of the flight models and measurements of the Planck LFI ortho-mode transducers can be found in[10] and in the corresponding Annex section.

Front End Modules (FEM)[edit]

Front End Modules are located in the FPU, just in cascade of the Feed Horn and the Ortho Mode Transducers. 70 GHz FEMs are mounted onto the inner wall of the mainframe (the wall facing HFI instrument) from the HFI side. 44 and 30 GHz FEMs are inserted into the mainframe from the WG side and fixed to the bottom plate. Screws to bottom plate are inserted from WG side. The LFI FEMs are the first active stage of amplification of the radiometer chain. Each FEM contains four amplification paths. Each path is composed by several cascaded LNAs followed by a phase switch. Two passive hybrids, at the input and output of the FEM, are used to mix couples of signals of the same radiometer (see Fig. 3). This makes the instabilities of each chain to be applied to both the sky and load signals.

The passive hybrid coupler (magic-tee) combines the signals from the sky and cold load with a fixed phase offset of either 90 deg or 180 deg between them. It has a 20% bandwidth, low loss, and amplitude balance needed at the output to ensure adequate signal isolation.

The details of the design, development and verification of the 70 GHz front-end modules for the Planck Low Frequency Instrument can be found in[11] and in the corresponding Annex section.

Waveguides[edit]

The LFI Front End Unit (FEU) is connected to the Back End Unit (BEU) by 44 rectangular waveguides approximately 1.5-2.0 meter long. Each waveguide exhibits low voltage standing wave ratio, low thermal conductivity, low insertion loss, and low mass. In addition, the waveguide path shall permit the LFI/HFI integration and the electrical bonding between FPU and BEU. Because of the Focal Plane Unit arrangement, the waveguides are in general twisted and bended in different planes and with different angles, depending on the particular waveguide. From the thermal point of view the waveguides have to connect 2 systems (BEM and FEM) that are at very different temperatures. At BEM level the waveguides are at a temperature of 300K while at FEM level the temperature is 20K. The waveguides have to reduce the thermal flow from 300K to 20K. In Fig. 1 in LFI overview (left panel) a conceptual sketch of the LFI configuration is shown.

Details of the Planck-LFI flight model of the composite waveguides can be found in[1] and in the corresponding Annex section.

Back End Modules (BEM)[edit]

The BEMs are composed by four identical channels each made of Low Noise Amplifiers (LNA), RF Band Pass Filter, RF to DC diode detector and DC amplifiers. The FEM output signals are connected by waveguide from the Focal Plane Unit (FPU) assembly to the Back End Modules (BEM’s) housed adjacent to the Data Acquisition Electronics (DAE) assembly. To maintain compatibility with the FEM’s, each BEM accommodates four receiver channels from the four waveguide outputs of each FEM. The BEM internal signal routes are not cross coupled and can be regarded as four identical parallel circuits. Each BEM is constructed as two mirror halves. The two amplifier/detector assemblies each contain two amplifier/detector circuits. Each is supplied from one of a pair of printed circuit boards which also house two DC output amplifiers.

The details of the design, development and verification of the 30 and 44 GHz back-end modules for the Planck Low Frequency Instrument can be found in[12]. The details of the design, development and verification of the 70 GHz back-end modules for the Planck Low Frequency Instrument can be found in[11]. Details are reported also in the corresponding Annex section.

4K Load[edit]

The purpose of the 4 K reference load is to provide the radiometer with a stable reference signal. Reducing the input offset (the radiometric temperature difference between the sky and the reference load) reduces the minimum achievable radiometer 1/f noise knee frequency for a given amplifier fluctuation spectrum. A reference load temperature that matches the sky temperature (approximately 2.7 K) would be ideal.

Details of the design, characteristics and performance of the LFI 4K reference load units are given in[2] and in the corresponding section of the Annexes.

Naming Convention[edit]

The naming of all the LFI elements is described in the previous sections but here is summarized again for clarity.

The 11 RCAs are labelled by a numbers from 18 to 28 as outlined in Fig. 1 in LFI overview, right panel. In each RCA, the two perpendicular linear polarisation components are labelled as M or S according to the arm of the OMT they are connected to (Main or Side, see lower-left inset of Fig. 2).

Each front-end amplifier (see upper-left inset of Fig. 2) is labelled with codes 1, 2 so that the four outputs of the FEM LNAs can be named with the sequence: M1, M2 (radiometer M) and S1, S2 (radiometer S).

Each radiometer has two output diodes (see upper-right inset of Fig. 2) which are labelled with binary codes 00, 01 (radiometer M) and 10, 11 (radiometer S), so that the four outputs of each radiometric chain can be named with the sequence: M-00, M-01, S-10, S-11.

REBA[edit]

The Radiometer Electronics Box Assembly (REBA) is the electronic box in charge of processing the digitized scientific data and to manage the overall instrument. It is also in charge of the communication with the spacecraft. There are two REBA boxes, one nominal and one redundant. The redundancy concept is cold, which means that both boxes are never ON at the same time; the operation of each unit shall be managed by the spacecraft switching-on the corresponding unit. The REBA ASW (Application SoftWare) is the same in each REBA box.

A detailed description of the Planck LFI REBA can be found in[3] and in the corresponding section of the Annexes.

Instrument On-board Software[edit]

The REBA software is the on board software of LFI. It is installed in the two computing subunits of REBA: the DPU (Digital Processing Unit), responsible of the control and monitoring of the instrument and the interface with the spacecraft and; the SPU (Signal Processing Unit), responsible of the data reduction and compression.

Details can be found in the corresponding section of the Annexes.

Reduction and Compression of Science Data[edit]

To asses stability against 1/f noise, the Low Frequency Instrument (LFI) on-board the Planck mission will acquire data at a rate much higher than the data rate allowed by the science telemetry bandwidth of 35.5 kbps. The data are processed by an on-board pipeline, followed on-ground by a decoding and reconstruction step, to reduce the volume of data to a level compatible with the bandwidth while minimizing the loss of information. The on-board processing of the scientific data used by Planck/LFI to fit the allowed data-rate is an intrinsically lossy process which distorts the signal in a manner which depends on a set of five free parameters ([math] N_{aver}, r_1, r_2, q, O \,[/math]) for each of the 44 LFI detectors. A brief description of the characteristics of this algorithm and the level of distortion introduced by the on-board processing as a function of these parameters can be found in the corresponding section of the Annexes, a full description of the Planck LFI on-board data handling system and the tuning and optimization method of the on-board processing chain in[4].

The strategy adopted to fit into the bandwidth relies on three on-board processing steps: downsampling, pre-processing the data to ensure loss-less compression, and loss-less compression itself. To demonstrate these steps, a model of the input signal shall be used. It has to be noted that while the compression is loss-less, the pre-processing is not, due to the need to rescale the data and convert them in integers, (a process named data re-quantization). However, the whole strategy is designed to asses a strict control of the way in which lossy operations are done, of the amount of information loss in order to asses optimal compression rate with minimal information loss.

Instrument Operations[edit]

Operational Modes[edit]

The operations of the LFI are designed to be automatic and require little if any intervention from the ground. A small amount of commands is required for operating the instrument and eventually for diagnostic and reconfiguration purposes. Each sky survey is conducted by the LFI with the instrument in the Normal Operations Mode mode. No deployable elements, or mechanically moving parts are included in the instrument. The scanning of the sky is achieved by progressive repointing of the satellite spin axis, with the Sun direction always within a cone 10 degrees from the spin axis. Within the Normal Science Mode the instrument can be configured in order to fit with different science or diagnostic needs without changing the power consumption and thus the temperature in the FPU. Changes in power consumption in the FPU are minimised and should occur only in the case that failures in the radiometers that could create interference problems require an RCA to be switched off. Power adjustments on the first stage of the HEMT amplifiers which are contemplated, require extremely small power level variations.

A brief summary of the LFI Operational Modes and the transitions between them is given in the corresponding section of the Annexes.


Ground Tests[edit]

During its development, the LFI flight model was calibrated and tested at various integration levels from sub-systems[13] to individual integrated receivers Planck-PreLaunch-XIII[14] and the whole receiver array Planck-PreLaunch-VII[15]. In every campaign we performed tests according to the following classification:

  • Functionality tests, performed to verify the instrument functionality.
  • Tuning tests, to tune radiometer parameters (biases, DC electronics gain and offset, digital quantisation and compression) for optimal performance in flight-like thermal conditions.
  • Basic calibration and noise performance tests, to characterise instrument performance (photometric calibration, isolation, linearity, noise and stability) in tuned conditions.
  • Susceptibility tests, to characterise instrument susceptibility to thermal and electrical variations.

Where possible, the same tests were repeated in several test campaigns, in order to ensure enough redundancy and confidence in the instrument behaviour repeatability. A matrix showing the instrument parameters measured in the various test campaigns is provided in Table 1 of Planck-PreLaunch-VII[15].

The ground test campaign was developed in three main phases: cryogenic tests on the individual RCAs, cryogenic tests on the integrated receiver array (the so-called radiometer array assembly, RAA) and system-level tests after the integration of the LFI and HFI instruments onto the satellite. The first two phases were carried out at the Thales Alenia Space - Italia laboratories located in Vimodrone (Milano, Italy) (note that receiver tests on 70 GHz RCAs were carried out in Finlad, at Yilinen laboratories), system level tests (SLT) were conducted in a dedicated cryofacility at the Centre Spatiale de Liege (CSL) located in Liege (Belgium).

In Table 1 below we list the temperature of the main cold thermal stages during ground tests compared to in-flight nominal values. These values show that system-level tests were conducted in conditions that were as much as possible flight-representative, while results obtained during RCA and RAA tests needed to be extrapolated to flight conditions to allow comparison. Details about the RCA test campaign are discussed in Planck-PreLaunch-XIII[14] while the RAA tests and the extrapolation methods are presented in Planck-PreLaunch-VII[15]}.

Table 1. Temperatures of the main cold stages during the various ground test campaigns compared to in-flight nominal values
Temperature Nominal RCA tests RAA tests System-level
Sky ~ 3 K ≳ 8 K ≳ 18.5 K ~ 4 K
Ref. load ~ 4.5 K ≳ 8 K ≳ 18.5 K ~ 4.5 K
Front-end unit ~ 20 K ~ 20 K ~ 26 K ~ 20 K

During the various test campaigns the instrument was switched off and moved several times in a time period of about three years. A series of functional tests were always repeated at each location and also in flight, in order to verify the instrument functionality and the response repeatability. No failures or major problems have been identified due to transport and integration procedures.

The expected Planck LFI scientific performance, resulting mainly from cryogenic system level tests, are described in Planck-PreLaunch-VII[15].

In-flight Calibration[edit]

The LFI Commissioning and Calibration and Performance Verification (CPV) phases started on June, [math]4^{\rm th} \;[/math] 2009 and lasted until August, [math]12^{\rm th} \;[/math] when Planck started scanning the sky in nominal mode. At the onset of CPV, the active cooling started when the radiating surfaces on the payload module reached their working temperatures (~50 K on the [math]3^{\rm rd} \;[/math] V-groove, and ~40 K on the reflectors) by passive cooling. This was achieved during the transfer phase. Nominal temperatures were achieved on July, [math]3^{\rm rd} \;[/math] 2009, when the dilution cooler temperature reached 0.1 K Planck-Early-II[16][17]. The cooldown of the HFI 4K stage (see Fig. 4 below), was key during CPV for the LFI as it provided a variable input signal that was exploited during bias tuning.

The LFI Commissioning and CPV was carried out in four phases:

  • LFI switch on and basic functionality verification (Commissioning),
  • Tuning of front-end biases and back-end electronics (CPV),
  • Preliminary calibration tests (CPV),
  • Thermal tests (CPV).
Figure 4. Functional tests performed during CPV against timeline. Curves from thermal sensors monitoring the 4K stage and the FPU temperature are superimposed.

Details of the LFI Commissioning and CPV test campaign are given in[18].

Performance Summary[edit]

Instrument Scientific Performance[edit]

Optical Parameters[edit]

The most accurate measurements of the LFI main beams have been made with Jupiter, the most powerful unresolved (to Planck) celestial source in the LFI frequency range. Since the LFI feed horns point to different positions on the sky, they detect the signal at different times. To map the beam, each sample in the selected timelines was projected in the [math] (u, \, v)[/math]-plane perpendicular to the nominal line-of-sight (LOS) of the telescope (and at 85◦ to the satellite spin axis). The [math] u[/math] and [math] v [/math] coordinates are defined in terms of the usual spherical coordinates [math] (θ, φ)[/math] :

[math] u = \sin θ \, \cos φ, [/math]
[math] v = \sin θ \, \sin φ. [/math]

To increase the signal-to-noise ratio, data were binned in an angular region of 2′ for the 70 GHz channels and 4′ for the 30 and 44 GHz channels. We recovered all beams down to −20 dB from the peak. An elliptical Gaussian was fit to each beam for both M and S radiometers. Differences between the M and S beams caused by optics and receiver non-idealities are inevitable at some level, but they appear to be well within the statistical uncertainties, and for the purposes of point-source extraction, the beams may be considered identical. For the details of the typical FWHM and ellipticity averaged over each frequency channel, refer toPlanck-Early-III[19]. Exhaustive details on all LFI beam parameters are presented in the LFI data processing section - Beams.

Photometric Calibration[edit]

Photometric calibration, i.e., conversion from voltage to antenna temperature, is performed for each radiometer after total power data have been cleaned of 1 Hz frequency spikes (see the LFI data processing section - Spikes Removal section and Planck-Early-V[8], and differenced. Here we report a brief overview of the photometric calibration, for the details see the LFI data processing section - Photometric Calibration.

Our calibrator is the well-known dipole signal induced by Earth and spacecraft motions with respect to the CMB rest frame. The largest calibration uncertainty comes from the presence of the Galaxy and of the CMB anisotropies in the measured signal. We therefore use an iterative calibration procedure in which the dipole is fitted and subtracted, producing a sky map that is then removed from the original data to enhance the dipole signal for the next iteration. Typically, convergence is obtained after a few tens of iterations.

In our current calibration model we use as calibration signal the sum of the solar dipole [math]\Delta T_{Sun}[/math] and the orbital dipole [math]\Delta T_{orb}[/math], which is the contribution from Planck’s orbital velocity around the Sun,

[math] \label{eq:cal1} \Delta T= ( \Delta T_{Sun} + \Delta T_{orb} ) sin \theta_{axis} [/math]

where [math]\theta_{axis}[/math] is the angle between the spacecraft axis and the overall dipole axis (solar + orbital). In this equation, the absolute calibration uncertainty is dominated by the uncertainty in [math]T_{Sun}[/math] = 3.355 mK ± 0.008 mK[20], which is known to about 0.2%. The modulation of the orbital dipole by the Earth motion around the Sun is known with an uncertainty almost three orders of magnitude smaller; however, at least one complete Planck orbit is needed for its measurement. The accuracy of our current calibration can be estimated by taking into account two components: 1) the statistical uncertainty in the regions of weak dipole; and 2) the systematic uncertainty caused by neglecting gain fluctuations that occur on periods shorter than the smoothing window. In our calibration procedure the gain is estimated for every pointing period: if we call [math] G_i [/math] the gain estimate from the [math]i_{th}[/math] pointing period we have that the associated uncertainty is

[math] \label{eq:cal2} \delta G = \sqrt{\frac{ \Sigma_{i=1}^N (G_i-\lt G\gt )^2 }{N-1} } [/math]

where [math]N[/math] is the overall number of pointing and [math]\lt G\gt [/math] is the average of the [math]N[/math] gains. We then approximate the effect of the smoothing filter as an average over [math]M[/math] consecutive pointings, so that the overall uncertainty can be estimated as:

[math] \label{eq:cal3} \delta G |_{stat} = \frac{\delta G}{\sqrt{M}} = \frac{1}{\sqrt{M}} \sqrt{\frac{ \Sigma_{i=1}^N (G_i-\lt G\gt )^2 }{N-1} } [/math]

Noise Properties[edit]

The noise characteristics of the LFI datastreams are closely reproduced by a simple (white + [math]1/ f[/math] ) noise model,

[math] \label{eq:p1} P(f)= \sigma^2 (1+ (\frac{f}{f_{knee}})^\alpha ) [/math]

where [math]P( f )[/math] is the power spectrum and [math]α ≈ −1[/math]. In this model, noise properties are characterised by three parameters, the white noise limit [math]\sigma[/math], the knee frequency [math]f_{knee}[/math], and the exponent of the [math]1/ f[/math] component [math]\alpha[/math], also referred to as slope. Here we give noise performance estimates based on one year of operations, details of the analysis are given in LFI data processing section - Noise estimation and in Planck-Early-V[8]Planck-Early-III[19].

Noise properties have been calculated following two different and complementary approaches: 1) fitting equation above to time-ordered data for each radiometer; and 2) building normalised noise maps by differencing data from the first half of the pointing period with data from the second half of the pointing period to remove the sky signal (“jackknife” data sets).

Typical uncertainties are ∼0.5% for the white noise, between 5 and 10% for the slope, and between 10 and 20% for the knee frequency.

White Noise Sensitivity[edit]

Details of the white noise sensitivity can be found in Planck-Early-III[19].

Table 2 summarizes the sensitivity numbers calculated during the first year of operations using methods and procedures described in detail in Planck-Early-V[8], compared with scientific requirements. The measured sensitivity is in very good agreement with pre-launch expectations. While the white noise moderately exceeds the design specification, this performance is fully in line with the LFI science objectives.

Table 2. White noise sensitivity of the LFI frequency channels compared with requirements
Channel Measurement [[math]\mu[/math]K[math]_{CMB}\,[/math] s[math]^{1/2}[/math]] Requirement [[math]\mu[/math]K[math]_{CMB}\,[/math] s[math]^{1/2}[/math]]
70 GHz 152.5 119
44 GHz 173.1 119
30 GHz 146.8 119

Instrument Technical Performance[edit]

Spectral Response[edit]

The in-band receiver response has been thoroughly modelled and measured for all the LFI detectors during ground tests. The complete set of bandpass curves has been published in[21] where all the details of the LFI radiometer's spectral response are given. From each curve we have derived the effective centre frequency according to:

[math] \label{eq:spectr} \nu_0 = \frac{ \int_{\nu_{min}}^{\nu_{max}} \nu g(\nu) \; d \nu} {\int_{\nu_{min}}^{\nu_{max}} g(\nu)\; d\nu } [/math]

where [math] \Delta \nu = \nu_{max} − \nu_{min} \;[/math] is the receiver bandwidth and [math]g(\nu)\;[/math] is the bandpass response. Details about colour corrections, [math]C(\alpha)[/math], needed to derive the brightness temperature of a source with a power-law spectral index [math]\alpha[/math], are provided in Planck-Early-V[8].

Some details are also given in the corresponding section of the Annexes.


Bandpass Estimation[edit]

As detailed in[21], our most accurate method to measure the LFI bandpasses is based on measurements of individual components integrated into the LFI Advanced RF Model (LARFM) to yield a synthesised radiometer bandpass. The LARFM is a software tool based on the open-source Quasi Universal Circuit Simulator (QUCS). The measured frequency responses of the various subsystems (feed-OMT, FEM, BEM) are considered as lumped S-parameter components. Measurements of single components are obtained with standard methods and provide highly reliable results, with precision of order 0.1-0.2 dB over the entire band. Waveguides are simulated with an analytical model, in order to reproduce the effect of their temperature gradient and the effect of standing waves caused by impedance mismatch at the interfaces between the FEM and BEM. This is because the 1.8-meter long waveguides were not measured at unit level in cryogenic conditions. The model provides accurate agreement with the measured waveguide response in the conditions of the test measurements (300 K). The composite bandpasses are estimated to have a precision of about 1.5 to 2 dB.

Some details are also given in the corresponding section of the Annexes.

Stability[edit]

Thanks to its differential scheme, the LFI is insensitive to many effects caused by 1/f noise, thermal fluctuations, or electrical instabilities. As detailed in Planck-Early-III[19], one effect detected during the first survey was the daily temperature fluctuation in the back-end unit induced by the downlink transponder, which was powered on each day for downlinks during the first 258 days of the mission. As expected, the effect is highly correlated between the sky and reference load signals. In the difference, the variation is reduced by a factor [math]∼(1 − r)[/math], where [math]r[/math] is the gain modulation factor defined above (see eq. \ref{eq:erre1}).

A particular class of signal fluctuations occasionally observed during operations is due to electrical instabilities that appear as abrupt increases in the measured drain current of the front-end amplifiers, with a relaxation time variable from few seconds to some hundreds of seconds. Typically, these events cause a simultaneous change in the sky and reference load signals. Because they are essentially common-mode, their residual on the differenced data is negligible, and the data are suitable for science production. In a few cases the residual fluctuation in the differential output was large enough (a few millikelvin in calibrated antenna temperature units) to be flagged, and the data were not used. The total amount of discarded data for all LFI channels until Operational Day 389 was about 2000 s per detector, or 0.008%.

A further peculiar effect appeared in the 44 GHz detectors, where single isolated samples, either on the sky or the reference voltage output, were far from the rest. Over a reference period of four months, 15 occurrences of single-sample spikes (out of 24 total anomaly events) were discarded, an insignificant loss of data.

Thermal Susceptibility[edit]

As mentioned in section LFI In-flight Calibration above and detailed in[18], during the CPV campaign, susceptibility tests were performed in order to characterise the LFI instrument susceptibility to thermal and electrical variations.

The effect of temperature fluctuations on the LFI radiometers is originated in the Planck cold end interface of the hydrogen sorption cooler to the instrument focal plane. The temperature is actively controlled through a dedicated stage, the Thermal Stabilization Assembly (TSA), providing a first reduction of the effect. The thermal mass of the focal plane strongly contribute to reduce residual fluctuations. The physical temperature fluctuations propagated at the front end modules cause a correlated fluctuation in the radiometer signal degrading the quality of scientific data. The accurate characterization of this effect is crucial for possibly removing it from raw data by exploiting the housekeeping information of thermal sensors.

The propagation of the temperature oscillations through the focal plane and the instrument response to thermal changes were characterized through two main tests:

  • the thermal dynamic response aimed at measuring the dynamic thermal behaviour of the LFI Focal Plane;
  • the radiometers thermal susceptibility.

Some details are also given in the corresponding section of the Annexes.

Instrument Budgets[edit]

LFI power, mass and telemetry budget are given in the corresponding section of the Annexes.

Systematic Effects [edit]

The LFI design was driven by the need to suppress systematic effects well below instrument white noise. The differential receiver scheme, with reference loads cooled to 4 K, greatly minimises the effect of 1/f noise and common-mode fluctuations, such as thermal perturbations in the 20K LFI focal plane. The use of a gain modulation factor (see Eq. \ref{eq:erre1} in RCA section above) largely compensates for spurious contributions from input offsets. Furthermore, diode averaging (Eq. \ref{eq:v1} in RCA section above) allows us to cancel second-order correlations such as those originating from phase switch imbalances.

We have developed an error budget for systematic effects (Planck-2013-III[22], Planck-Early-III[19], Planck-PreLaunch-II[7]) as a reference for both instrument design and data analysis. Our goal is to ensure that each systematic effect is rejected to the specified level, either by design or by robust removal in software. At this stage, the following effects are relevant:

– 1/f noise;
– 1 Hz frequency spikes;
– receivers non-linearities;
– thermal fluctuations in the back-end modules driven by temperature oscillations from the transponder during the first survey;
– thermal fluctuations in the 20 K focal plane;
– thermal fluctuations of the 4 K reference loads.

For each of these effects we used flight data and information from ground tests to build timelines, maps, and angular power spectra that represent our best knowledge of their impact on the scientific analysis. The details of the systematic effect analysis is given in section LFI data processing section - Systematic Effects uncertainties.

The Sorption Cooler[edit]

The Planck H2 Sorption Cooler is the first stage of the active cryogenic chain: its task is to maintain the LFI down to the operating temperature while providing a pre-cooling stage for the HFI refrigerators. The system performs a simple thermodynamic cycle based on hydrogen compression, gas pre-cooling by three passive radiators, further cooling due to the heat recovery by the cold low pressure gas stream, expansion through a J-T valve and evaporation at the cold stage Planck-Early-II[16]. A drawing of the Planck Sorption Cooler System (SCS) is shown in Fig. 5. The engine of the cryocooler is the compressor. It serves two main functions: to produce the high-pressure hydrogen gas flow and to maintain a stable gas recovery rate, which keeps the return pressure, hence the liquid temperature, constant. The high pressure gas flowing to the cold end is pre-cooled by exchanging heat with the three passive stages at the V-Grooves and with the evaporated cold gas returning back to the compressor. The gas then expands at the cold end through a J-T valve producing approximately 1 Watt of cooling power at a temperature of <20K: most of this heat lift is used at the LVHX2 (Liquid Vapour Heat eXchanger 2, see Fig. 5) interface to absorb the LFI heat load at a temperature around 20K. The remaining heat lift is used at the LVHX1 as a pre-cooling stage, at a temperature lower than 19 K, for the two HFI refrigerators. The cooler and its performance are described in detail in[23].

Figure 5. Planck Sorption Cooler CAD view with labels of the main sub-systems.

Both LVHX’s provide a temperature around 18 K, with fluctuations driven by the cooler instabilities (compressor element variations, cycling, two phase flow dynamics etc.). Stabilization of the HFI interface (LVHX1) temperature is not necessary, as thermal control of the subsequent colder stages is more efficient and very effective. To reduce cold end fluctuations directly transmitted to the LFI radiometers, a copper block designated as the Temperature Stabilization Assembly (TSA), is inserted, as an intermediate stage, between LVHX2 and the LFI FocaL Plane Unit (FPU). The TSA comprises a temperature sensor and a heater controlled by a PID-type feedback loop working in combination with the passive thermal inertia. The set-point temperature of the TSA is an adjustable parameter of the sorption cooler system, chosen to provide dynamic range for control during mission: as the compressor elements age, the return gas pressure and thus the temperature of LVHX2 rise slowly. To keep the LFI T reference stable during operations the set point must be periodically adjusted to maintain the level of oscillations within the required range (Fig. 6).

Figure 6.LVHX2 (black, HK parameter name SD029540) and TSA (red, HK parameter name SD030540) temperature profile from 125 to 563 days after launch.

Two sorption cooler units have been integrated on board the Planck spacecraft. Both units have been used to cover the mission lifetime: one cooler has been operated for the first two sky surveys. At the end of its lifetime a switchover operation, performed on August 11th 2010 (455 days after launch), has activated the second unit that has been running since then. The LVHX2 temperature change due to the new cooler start, and the subsequent re-adjustment of the LFI temperature stabilization stage, is clear in Fig. 6.


References[edit]

  1. 1.01.1 The Planck-LFI flight model composite waveguides, O. D'Arcangelo, L. Figini, A. Simonetto, F. Villa, M. Pecora, P. Battaglia, M. Bersanelli, R. C. Butler, F. Cuttaia, S. Garavaglia, P. Guzzi, N. Mandolesi, A. Mennella, G. Morgante, L. Pagan, L. Valenziano, Journal of Instrumentation, 4, 2007-+, (2009).
  2. 2.02.1 Planck-LFI: design and performance of the 4 Kelvin Reference Load Unit, L. Valenziano, F. Cuttaia, A. De Rosa, L. Terenzi, A. Brighenti, G. P. Cazzola, A. Garbesi, S. Mariotti, G. Orsi, L. Pagan, F. Cavaliere, M. Biggi, R. Lapini, E. Panagin, P. Battaglia, R. C. Butler, M. Bersanelli, O. D'Arcangelo, S. Levin, N. Mandolesi, A. Mennella, G. Morgante, G. Morigi, M. Sandri, A. Simonetto, M. Tomasi, F. Villa, M. Frailis, S. Galeotta, A. Gregorio, R. Leonardi, S. R. Lowe, M. Maris, P. Meinhold, L. Mendes, L. Stringhetti, A. Zonca, A. Zacchei, Journal of Instrumentation, 4, 2006-+, (2009).
  3. 3.03.1 The Planck-LFI Radiometer Electronics Box Assembly, J. M. Herreros, M. F. Gómez, R. Rebolo, H. Chulani, J. A. Rubiño-Martin, S. R. Hildebrandt, M. Bersanelli, R. C. Butler, M. Miccolis, A. Peña, M. Pereira, F. Torrero, C. Franceschet, M. López, C. Alcalá, Journal of Instrumentation, 4, 2008-+, (2009).
  4. 4.04.1 Optimization of Planck-LFI on-board data handling, M. Maris, M. Tomasi, S. Galeotta, M. Miccolis, S. Hildebrandt, M. Frailis, R. Rohlfs, N. Morisset, A. Zacchei, M. Bersanelli, P. Binko, C. Burigana, R. C. Butler, F. Cuttaia, H. Chulani, O. D'Arcangelo, S. Fogliani, E. Franceschi, F. Gasparo, F. Gomez, A. Gregorio, J. M. Herreros, R. Leonardi, P. Leutenegger, G. Maggio, D. Maino, M. Malaspina, N. Mandolesi, P. Manzato, M. Meharga, P. Meinhold, A. Mennella, F. Pasian, F. Perrotta, R. Rebolo, M. Türler, A. Zonca, Journal of Instrumentation, 4, 2018-+, (2009).
  5. 5.05.1 1/f noise and other systematic effects in the Planck-LFI radiometers, M. Seiffert, A. Mennella, C. Burigana, N. Mandolesi, M. Bersanelli, P. Meinhold, P. Lubin, A&A, 391, 1185-1197, (2002).
  6. 6.06.1 Offset balancing in pseudo-correlation radiometers for CMB measurements, A. Mennella, M. Bersanelli, M. Seiffert, D. Kettle, N. Roddis, A. Wilkinson, P. Meinhold, A&A, 410, 1089-1100, (2003).
  7. 7.07.1 Planck pre-launch status: Design and description of the Low Frequency Instrument, M. Bersanelli, N. Mandolesi, R. C. Butler, A. Mennella, F. Villa, B. Aja, E. Artal, E. Artina, C. Baccigalupi, M. Balasini, G. Baldan, A. Banday, P. Bastia, P. Battaglia, T. Bernardino, E. Blackhurst, L. Boschini, C. Burigana, G. Cafagna, B. Cappellini, F. Cavaliere, F. Colombo, G. Crone, F. Cuttaia, O. D'Arcangelo, L. Danese, R. D. Davies, R. J. Davis, L. de Angelis, G. C. de Gasperis, L. de La Fuente, A. de Rosa, G. de Zotti, M. C. Falvella, F. Ferrari, R. Ferretti, L. Figini, S. Fogliani, C. Franceschet, E. Franceschi, T. Gaier, S. Garavaglia, F. Gomez, K. Gorski, A. Gregorio, P. Guzzi, J. M. Herreros, S. R. Hildebrandt, R. Hoyland, N. Hughes, M. Janssen, P. Jukkala, D. Kettle, V. H. Kilpiä, M. Laaninen, P. M. Lapolla, C. R. Lawrence, D. Lawson, J. P. Leahy, R. Leonardi, P. Leutenegger, S. Levin, P. B. Lilje, S. R. Lowe, P. M. Lubin, D. Maino, M. Malaspina, M. Maris, J. Marti-Canales, E. Martinez-Gonzalez, A. Mediavilla, P. Meinhold, M. Miccolis, G. Morgante, P. Natoli, R. Nesti, L. Pagan, C. Paine, B. Partridge, J. P. Pascual, F. Pasian, D. Pearson, M. Pecora, F. Perrotta, P. Platania, M. Pospieszalski, T. Poutanen, M. Prina, R. Rebolo, N. Roddis, J. A. Rubiño-Martin, M. J. Salmon, M. Sandri, M. Seiffert, R. Silvestri, A. Simonetto, P. Sjoman, G. F. Smoot, C. Sozzi, L. Stringhetti, E. Taddei, J. Tauber, L. Terenzi, M. Tomasi, J. Tuovinen, L. Valenziano, J. Varis, N. Vittorio, L. A. Wade, A. Wilkinson, F. Winder, A. Zacchei, A. Zonca, A&A, 520, A4+, (2010).
  8. 8.08.18.28.38.48.5 Planck early results. V. The Low Frequency Instrument data processing, A. Zacchei, D. Maino, C. Baccigalupi, M. Bersanelli, A. Bonaldi, L. Bonavera, C. Burigana, R. C. Butler, F. Cuttaia, G. de Zotti, J. Dick, M. Frailis, S. Galeotta, J. González-Nuevo, K. M. Górski, A. Gregorio, E. Keihänen, R. Keskitalo, J. Knoche, H. Kurki-Suonio, C. R. Lawrence, S. Leach, J. P. Leahy, M. López-Caniego, N. Mandolesi, M. Maris, F. Matthai, P. R. Meinhold, A. Mennella, G. Morgante, N. Morisset, P. Natoli, F. Pasian, F. Perrotta, G. Polenta, T. Poutanen, M. Reinecke, S. Ricciardi, R. Rohlfs, M. Sandri, A.-S. Suur-Uski, J. A. Tauber, D. Tavagnacco, L. Terenzi, M. Tomasi, J. Valiviita, F. Villa, A. Zonca, A. J. Banday, R. B. Barreiro, J. G. Bartlett, N. Bartolo, L. Bedini, K. Bennett, P. Binko, J. Borrill, F. R. Bouchet, M. Bremer, P. Cabella, B. Cappellini, X. Chen, L. Colombo, M. Cruz, A. Curto, L. Danese, R. D. Davies, R. J. Davis, G. de Gasperis, A. de Rosa, G. de Troia, C. Dickinson, J. M. Diego, S. Donzelli, U. Dörl, G. Efstathiou, T. A. Enßlin, H. K. Eriksen, M. C. Falvella, F. Finelli, E. Franceschi, T. C. Gaier, F. Gasparo, R. T. Génova-Santos, G. Giardino, F. Gómez, A. Gruppuso, F. K. Hansen, R. Hell, D. Herranz, W. Hovest, M. Huynh, J. Jewell, M. Juvela, T. S. Kisner, L. Knox, A. Lähteenmäki, J.-M. Lamarre, R. Leonardi, J. León-Tavares, P. B. Lilje, P. M. Lubin, G. Maggio, D. Marinucci, E. Martínez-González, M. Massardi, S. Matarrese, M. T. Meharga, A. Melchiorri, M. Migliaccio, S. Mitra, A. Moss, H. U. Nørgaard-Nielsen, L. Pagano, R. Paladini, D. Paoletti, B. Partridge, D. Pearson, V. Pettorino, D. Pietrobon, G. Prézeau, P. Procopio, J.-L. Puget, C. Quercellini, J. P. Rachen, R. Rebolo, G. Robbers, G. Rocha, J. A. Rubiño-Martín, E. Salerno, M. Savelainen, D. Scott, M. D. Seiffert, J. I. Silk, G. F. Smoot, J. Sternberg, F. Stivoli, R. Stompor, G. Tofani, L. Toffolatti, J. Tuovinen, M. Türler, G. Umana, P. Vielva, N. Vittorio, C. Vuerli, L. A. Wade, R. Watson, S. D. M. White, A. Wilkinson, A&A, 536, A5, (2011).
  9. Planck-LFI flight model feed horns, F. Villa, O. D'Arcangelo, M. Pecora, L. Figini, R. Nesti, A. Simonetto, C. Sozzi, M. Sandri, P. Battaglia, P. Guzzi, M. Bersanelli, R. C. Butler, N. Mandolesi, Journal of Instrumentation, 4, 2004-+, (2009).
  10. The Planck-LFI flight model ortho-mode transducers, O. D'Arcangelo, A. Simonetto, L. Figini, E. Pagana, F. Villa, M. Pecora, P. Battaglia, M. Bersanelli, R. C. Butler, S. Garavaglia, P. Guzzi, N. Mandolesi, C. Sozzi, Journal of Instrumentation, 4, 2005-+, (2009).
  11. 11.011.1 Design, development, and verification of the Planck Low Frequency Instrument 70 GHz Front-End and Back-End Modules, J. Varis, N. J. Hughes, M. Laaninen, V.-H. Kilpiä, P. Jukkala, J. Tuovinen, S. Ovaska, P. Sjöman, P. Kangaslahti, T. Gaier, R. Hoyland, P. Meinhold, A. Mennella, M. Bersanelli, R. C. Butler, F. Cuttaia, E. Franceschi, R. Leonardi, P. Leutenegger, M. Malaspina, N. Mandolesi, M. Miccolis, T. Poutanen, H. Kurki-Suonio, M. Sandri, L. Stringhetti, L. Terenzi, M. Tomasi, L. Valenziano, Journal of Instrumentation, 4, 2001-+, (2009).
  12. LFI 30 and 44 GHz receivers Back-End Modules, E. Artal, B. Aja, M. L. de la Fuente, J. P. Pascual, A. Mediavilla, E. Martinez-Gonzalez, L. Pradell, P. de Paco, M. Bara, E. Blanco, E. García, R. Davis, D. Kettle, N. Roddis, A. Wilkinson, M. Bersanelli, A. Mennella, M. Tomasi, R. C. Butler, F. Cuttaia, N. Mandolesi, L. Stringhetti, Journal of Instrumentation, 4, 2003-+, (2009).
  13. Design, development and verification of the 30 and 44 GHz front-end modules for the Planck Low Frequency Instrument, R. J. Davis, A. Wilkinson, R. D. Davies, W. F. Winder, N. Roddis, E. J. Blackhurst, D. Lawson, S. R. Lowe, C. Baines, M. Butlin, A. Galtress, D. Shepherd, B. Aja, E. Artal, M. Bersanelli, R. C. Butler, C. Castelli, F. Cuttaia, O. D'Arcangelo, T. Gaier, R. Hoyland, D. Kettle, R. Leonardi, N. Mandolesi, A. Mennella, P. Meinhold, M. Pospieszalski, L. Stringhetti, M. Tomasi, L. Valenziano, A. Zonca, Journal of Instrumentation, 4, 2002-+, (2009).
  14. 14.014.1 Planck pre-launch status: Calibration of the Low Frequency Instrument flight model radiometers, F. Villa, L. Terenzi, M. Sandri, P. Meinhold, T. Poutanen, P. Battaglia, C. Franceschet, N. Hughes, M. Laaninen, P. Lapolla, M. Bersanelli, R. C. Butler, F. Cuttaia, O. D'Arcangelo, M. Frailis, E. Franceschi, S. Galeotta, A. Gregorio, R. Leonardi, S. R. Lowe, N. Mandolesi, M. Maris, L. Mendes, A. Mennella, G. Morgante, L. Stringhetti, M. Tomasi, L. Valenziano, A. Zacchei, A. Zonca, B. Aja, E. Artal, M. Balasini, T. Bernardino, E. Blackhurst, L. Boschini, B. Cappellini, F. Cavaliere, A. Colin, F. Colombo, R. J. Davis, L. de La Fuente, J. Edgeley, T. Gaier, A. Galtress, R. Hoyland, P. Jukkala, D. Kettle, V.-H. Kilpia, C. R. Lawrence, D. Lawson, J. P. Leahy, P. Leutenegger, S. Levin, D. Maino, M. Malaspina, A. Mediavilla, M. Miccolis, L. Pagan, J. P. Pascual, F. Pasian, M. Pecora, M. Pospieszalski, N. Roddis, M. J. Salmon, M. Seiffert, R. Silvestri, A. Simonetto, P. Sjoman, C. Sozzi, J. Tuovinen, J. Varis, A. Wilkinson, F. Winder, A&A, 520, A6+, (2010).
  15. 15.015.115.215.3 Planck pre-launch status: Low Frequency Instrument calibration and expected scientific performance, A. Mennella, M. Bersanelli, R. C. Butler, F. Cuttaia, O. D'Arcangelo, R. J. Davis, M. Frailis, S. Galeotta, A. Gregorio, C. R. Lawrence, R. Leonardi, S. R. Lowe, N. Mandolesi, M. Maris, P. Meinhold, L. Mendes, G. Morgante, M. Sandri, L. Stringhetti, L. Terenzi, M. Tomasi, L. Valenziano, F. Villa, A. Zacchei, A. Zonca, M. Balasini, C. Franceschet, P. Battaglia, P. M. Lapolla, P. Leutenegger, M. Miccolis, L. Pagan, R. Silvestri, B. Aja, E. Artal, G. Baldan, P. Bastia, T. Bernardino, L. Boschini, G. Cafagna, B. Cappellini, F. Cavaliere, F. Colombo, L. de La Fuente, J. Edgeley, M. C. Falvella, F. Ferrari, S. Fogliani, E. Franceschi, T. Gaier, F. Gomez, J. M. Herreros, S. Hildebrandt, R. Hoyland, N. Hughes, P. Jukkala, D. Kettle, M. Laaninen, D. Lawson, P. Leahy, S. Levin, P. B. Lilje, D. Maino, M. Malaspina, P. Manzato, J. Marti-Canales, E. Martinez-Gonzalez, A. Mediavilla, F. Pasian, J. P. Pascual, M. Pecora, L. Peres-Cuevas, P. Platania, M. Pospieszalsky, T. Poutanen, R. Rebolo, N. Roddis, M. Salmon, M. Seiffert, A. Simonetto, C. Sozzi, J. Tauber, J. Tuovinen, J. Varis, A. Wilkinson, F. Winder, A&A, 520, A5+, (2010).
  16. 16.016.1 Planck early results. II. The thermal performance of Planck, Planck Collaboration II, A&A, 536, A2, (2011).
  17. Noise properties of the Planck-LFI receivers, P. Meinhold, R. Leonardi, B. Aja, E. Artal, P. Battaglia, M. Bersanelli, E. Blackhurst, C. R. Butler, L. P. Cuevas, F. Cuttaia, O. D'Arcangelo, R. Davis, M. L. de la Fuente, M. Frailis, C. Franceschet, E. Franceschi, T. Gaier, S. Galeotta, A. Gregorio, R. Hoyland, N. Hughes, P. Jukkala, D. Kettle, M. Laaninen, P. Leutenegger, S. R. Lowe, M. Malaspina, R. Mandolesi, M. Maris, E. Martínez-González, L. Mendes, A. Mennella, M. Miccolis, G. Morgante, N. Roddis, M. Sandri, M. Seiffert, M. Salmón, L. Stringhetti, T. Poutanen, L. Terenzi, M. Tomasi, J. Tuovinen, J. Varis, L. Valenziano, F. Villa, A. Wilkinson, F. Winder, A. Zacchei, A. Zonca, Journal of Instrumentation, 4, 2009-+, (2009).
  18. 18.018.1 In-flight calibration and verification of the Planck-LFI instrument, A. Gregorio, F. Cuttaia, A. Mennella, M. Bersanelli, S. Maris, P. Meinhold, Submitted to Journal of Instrumentation, (2013).
  19. 19.019.119.219.319.4 Planck early results. III. First assessment of the Low Frequency Instrument in-flight performance, A. Mennella, R. C. Butler, A. Curto, F. Cuttaia, R. J. Davis, J. Dick, M. Frailis, S. Galeotta, A. Gregorio, H. Kurki-Suonio, C. R. Lawrence, S. Leach, J. P. Leahy, S. Lowe, D. Maino, N. Mandolesi, M. Maris, E. Martínez-González, P. R. Meinhold, G. Morgante, D. Pearson, F. Perrotta, G. Polenta, T. Poutanen, M. Sandri, M. D. Seiffert, A.-S. Suur-Uski, D. Tavagnacco, L. Terenzi, M. Tomasi, J. Valiviita, F. Villa, R. Watson, A. Wilkinson, A. Zacchei, A. Zonca, B. Aja, E. Artal, C. Baccigalupi, A. J. Banday, R. B. Barreiro, J. G. Bartlett, N. Bartolo, P. Battaglia, K. Bennett, A. Bonaldi, L. Bonavera, J. Borrill, F. R. Bouchet, C. Burigana, P. Cabella, B. Cappellini, X. Chen, L. Colombo, M. Cruz, L. Danese, O. D'Arcangelo, R. D. Davies, G. de Gasperis, A. de Rosa, G. de Zotti, C. Dickinson, J. M. Diego, S. Donzelli, G. Efstathiou, T. A. Enßlin, H. K. Eriksen, M. C. Falvella, F. Finelli, S. Foley, C. Franceschet, E. Franceschi, T. C. Gaier, R. T. Génova-Santos, D. George, F. Gómez, J. González-Nuevo, K. M. Górski, A. Gruppuso, F. K. Hansen, D. Herranz, J. M. Herreros, R. J. Hoyland, N. Hughes, J. Jewell, P. Jukkala, M. Juvela, P. Kangaslahti, E. Keihänen, R. Keskitalo, V.-H. Kilpia, T. S. Kisner, J. Knoche, L. Knox, M. Laaninen, A. Lähteenmäki, J.-M. Lamarre, R. Leonardi, J. León-Tavares, P. Leutenegger, P. B. Lilje, M. López-Caniego, P. M. Lubin, M. Malaspina, D. Marinucci, M. Massardi, S. Matarrese, F. Matthai, A. Melchiorri, L. Mendes, M. Miccolis, M. Migliaccio, S. Mitra, A. Moss, P. Natoli, R. Nesti, H. U. Nørgaard-Nielsen, L. Pagano, R. Paladini, D. Paoletti, B. Partridge, F. Pasian, V. Pettorino, D. Pietrobon, M. Pospieszalski, G. Prézeau, M. Prina, P. Procopio, J.-L. Puget, C. Quercellini, J. P. Rachen, R. Rebolo, M. Reinecke, S. Ricciardi, G. Robbers, G. Rocha, N. Roddis, J. A. Rubiño-Martín, M. Savelainen, D. Scott, R. Silvestri, A. Simonetto, P. Sjoman, G. F. Smoot, C. Sozzi, L. Stringhetti, J. A. Tauber, G. Tofani, L. Toffolatti, J. Tuovinen, M. Türler, G. Umana, L. Valenziano, J. Varis, P. Vielva, N. Vittorio, L. A. Wade, C. Watson, S. D. M. White, F. Winder, A&A, 536, A3, (2011).
  20. Five-Year Wilkinson Microwave Anisotropy Probe (WMAP) Observations: Data Processing, Sky Maps, and Basic Results, G. Hinshaw, J. L. Weiland, R. S. Hill, N. Odegard, D. Larson, C. L. Bennett, J. Dunkley, B. Gold, M. R. Greason, N. Jarosik, E. Komatsu, M. R. Nolta, L. Page, D. N. Spergel, E. Wollack, M. Halpern, A. Kogut, M. Limon, S. S. Meyer, G. S. Tucker, E. L. Wright, ApJS, 180, 225-245, (2009).
  21. 21.021.1 Planck-LFI radiometers' spectral response, A. Zonca, C. Franceschet, P. Battaglia, F. Villa, A. Mennella, O. D'Arcangelo, R. Silvestri, M. Bersanelli, E. Artal, R. C. Butler, F. Cuttaia, R. J. Davis, S. Galeotta, N. Hughes, P. Jukkala, V.-H. Kilpiä, M. Laaninen, N. Mandolesi, M. Maris, L. Mendes, M. Sandri, L. Terenzi, J. Tuovinen, J. Varis, A. Wilkinson, Journal of Instrumentation, 4, 2010-+, (2009).
  22. Planck 2013 results: LFI systematic uncertainties, Planck Collaboration 2013 III, A&A, in press, (2014).
  23. Cryogenic characterization of the Planck sorption cooler system flight model, G. Morgante, D. Pearson, F. Melot, P. Stassi, L. Terenzi, P. Wilson, B. Hernandez, L. Wade, A. Gregorio, M. Bersanelli, C. Butler, N. Mandolesi, Journal of Instrumentation, 4, 2016-+, (2009).

(Planck) Low Frequency Instrument

LFI warm electronics Back End Unit

High Electron Mobility Transistor

(Planck) High Frequency Instrument

LFI Radiometer Array Assembly

Sorption Cooler Subsystem (Planck)

LFI Radiometer Electronics Box Assembly

LFI cryogenic amplifying stage Front End Unit

Service Module

Sorption Cooler Compressor assembly

Focal Plane Unit

LFI warm electronics Back End Module

LFI Data Acquisition Electronics

revolutions per minute

LFI Radiometer Chain Assembly

LFI cryogenic amplifying stage Front End Module

LFI Ortho Module Transducer

analog to digital converter

Feed Horn

LFI Waveguide

Data Processing Unit

Signal Processing Unit

[LFI meaning]: absolute calibration refers to the 0th order calibration for each channel, 1 single number, while the relative calibration refers to the component of the calibration that varies pointing period by pointing period.

System Level Test

Centre Spatial de Liège

Calibration and Performance Verification

Line Of Sight

Full-Width-at-Half-Maximum

Cosmic Microwave background

hermal Stabilization Assembly

House Keeping